方向吊環 的英文怎麼說

中文拼音 [fāngxiàngdiàohuán]
方向吊環 英文
shackle hook
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : hangsuspend
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • 方向 : direction; orientation
  1. The anion surfactant nals was the most efficient in the process and was selected as collector by orthogonal method. the interfacial tension and cmc of nals ( cmc 6. 5 10 - 3m ) in the solution was measured by hanging ring test, the function relationship between interfacial tensions and nals concentration was : = - 0. 9523 in 2c - 24. 534 in c - 81. 411. the relation of interfacial adsorption equilibrium in the solution system was respectively tested and calculated with gibbs equation and dynamic method. the conclusion showed that ( 1 ) the experiment result of dynamic method with was highly in coordination with the value which from theoretical calculation. ( 2 ) the surfactant molecule was in arrangement of monomolecular layer at the gas - liquid interface

    法測定了十二烷基硫酸鈉水溶液不同濃度與其界面張力的關系,擬合得到的回歸程為= - 0 . 9523ln ~ 2c - 24 . 534lnc - 81 . 411 ,同時還測得其臨界膠束濃度值( cmc為6 . 5 10 ~ ( - 3 ) m ) ,運用吉布斯等溫程和動態法分別計算和測定了該溶液系統的界面吸附平衡關系,結論表明: ( 1 )動態法測定結果基本吻合吉布斯程的理論計算; ( 2 )表面活性劑分子在氣?液兩相界面是以單分子層形式定有序排列的。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工法,並可為以後類似施工作借鑒。
分享友人