方案比選 的英文怎麼說

中文拼音 [fāngànxuǎn]
方案比選 英文
scheme comparison
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. The research of the thesis shows : optimize theory describes and makes the target as model, array, level, and deals with every scheme that determines the nature and quantitative factor chosen in unison that appraised, its result is objective, true, reliable, can plan making policy to offer scientific basis finally of overall arrangement for the route of the highway ; the fuzzy comprehensive evaluation assessment is simple, clear, practical, can make more factors participated in judging, and overcome the subjective and random that existed when chosen the route scheme ; level analytic approach promises high grade highway route overall arrangement scheme judge and carries out the tr ansition to from single factor index multifactor synthesis of index judge, and the result is convincible

    論文研究表明:優化理論將描述與評價的對象模型化、序列化、層次化,並統一處理各方案比選中的定性與定量因素,其結果客觀、真實、可靠,能為公路路線規劃布局的最終決策提供科學依據;模糊綜合評判法簡單、清晰、實用,能使更多的因素參與評判,克服了路線擇時存在的主觀隨意性;層次分析法做到高等級公路路線布局由單因素指標評判過渡到多因素指標的綜合評判,結果具有說服力。
  2. But if avoidance was impossible, such as the section cutting through the hohxil, qumar and soga nature reserves, the planners would compare several designs, and put forward protection measures to minimize disturbance to the nature reserves

    對于無法避讓,必須經過野生動物活動區域的路段,如穿過可可西里、楚瑪爾河、索加等自然保護區的線路區段,在設計中進行了多方案比選,研究提出工程保護對策,盡量減少對自然保護區的干擾。
  3. Firstly, the default of the original method is discussed by using various theories. secondly the principles, method and characteristics of the urban road constructed planing are analysized. thirdly the research issues is put forwarded to solve the problem how to colligate serval aspect factors in order to make full use of the lrt project. 2. the establishment of the technological and economic evaluation about the plan of constructing route

    運用基本建設經濟學及建設系統工程的原理分析了建設線路擇與整個建設項目之間的關系,為能在武漢城市發展整體規劃和城市路網規劃的基礎上使漢口太平洋路段線路的走向與城市交通建設相結合,順沿主客流向,本文綜合考慮各面因素,使輕軌項目能充分發揮效能和骨幹作用,並以太平洋路段的建設線路的方案比選為具體研究對象進行了研究。
  4. By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad

    本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式鋼管混凝土系桿拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施工中的要點,本橋內力計算採用平面桿系有限元計算程序, (交通部公規院的《橋梁設計綜合計算程序》 ( bricas4 . 0 ) ) ,並採用空間有限元程序( brcad2 . 0 )進行驗算。
  5. According to this kind of comprehensive evaluation of technical economy, there are little mature theory and comparative analyses approach in the world

    對于這類技術經濟綜合評價,目前國內外還沒有一套較成熟的理論和方案比選分析法,我國更是尚處于初始階段,積累的經驗也不多。
  6. Construction of expert consulting system for yellow river crossing project to meet the technology challenge

    玉蒙鐵路曲江峽谷橋位址及線路方案比選研究
  7. The design works of top - part structure of qing liang jiang bridge was according to the requirements of proposal and regulated issues / regulations after the comparison of various designs

    本設計是根據設計任務書的要求和相應規范的規定,對清涼江橋上部結構進行方案比選和設計的。
  8. At the same time, according to the geological condition of a project in gaize county and its power demand, 9 different proposals were worked out for calculation and analysis, therefore a development proposal of pumped storage with wind and light as supplements was finalized as the best through selection and comparison

    以改則縣某工程為實例,針對其自然地理條件及對電能的需求,應用風、光、水互補系統分析模型,擬定了9個不同進行計算分析,經方案比選,提出了該工程風、光互補抽水蓄能電站的最優開發
  9. Karst water gushing and mud soil projecting hazards and their harnessing schemes ' selection in the east flank of tongmaling anticline in yuanliangshan tunnel of yuhuai railway

    渝懷鐵路圓梁山隧道桐麻嶺背斜東翼巖溶涌水突泥災害與整治方案比選
  10. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工法、協作剛構的剛度取、塔柱的直束加固等面作了詳細地計算分析和較。
  11. Preferred construction solution for xidan station engineering on line 4 of beijing subway

    線西單站施工方案比選
  12. Firstly, it designs the structure and functions of the system by the systematic analysis of the design work of the comparison of railway location projects. then, by analyzing the data involved in scrlid, the management of synthesis data in the design environment are proposed and implemented. finally, according to the conventional flow of the scrlid, the development of the subsystem of interactive design for railway location has been implemented

    本文主要完成了以下幾個面的工作:以系統的觀點對線路方案比選工作做了詳細分析,設計了本系統的結構和功能;通過對線路方案比選過程中所涉及數據的分析,提出並實現了對線路方案比選綜合數據的管理;通過對線路設計過程的分析,完成了互動式線路設計子系統的開發。
  13. ( 3 ) the upper result of settlement field, stress field and crack deepness offers a theoretics gist for reinforcing bank. the paper concludes several methods of reinforcement. through choosing project, made certain adopting geomebrance to reinforce the bank

    本文又對堤防加固的各種措施法進行了歸納整理,通過方案比選擇用迎水面斜鋪土工膜的法進行防滲加固,並對土工膜的材料擇進行了計算。
  14. Sketch plate takes great advantage of concrete plasticity, so this type of bridge often wins out in plane phase

    摘要異形連續板由於其充分發揮了混凝土結構可塑性強的特點,在景觀要求高的方案比選階段具有很大的優勢,往往能夠成為中
  15. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用面向對象的數據封裝和繼承技術實現了項目管理和數據的安全保護; 3 、擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平面拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編程技術,實現了平面、縱斷面、橫斷面三種圖形的對顯示,實現了縱斷面交互設計、橫斷面定線和橋隧工程設置; 6 、就縱斷面優化在線路方案比選工作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱橫斷面地面高程、自動設橋、自動設隧數學模型。
  16. In the fourth chapter, based on the analysis and design of some modules closely relating to interactive design, the thesis completes the development of the railway location interactive design subsystem, and these modules are : railway horizontal line interactive design, comparison of plane, profile and across section, automatic and interactive design of profile, designing railway location by across section and setting location of the bridge and the tunnel

    第三章分析了線路方案比選工作過程中所涉及的數據情況以及數據管理法,完成了方案比選綜合數據管理子系統的開發工作,第四章通過對線路平面交互設計、內插縱橫斷面地面高程、縱斷面自動與交互設計、橫斷面定線、橋隧工程設置等與交互設計密切相關的重點模塊的分析與設計,完成了互動式線路設計子系統的開發。
  17. Based on tianmu bridge - no. 3 landscaping pedestrian bridge on jian river in shunyi district of beijing, this paper expounds the design considerations, type alternatives and layout of the structural system

    摘要針對北京市順義區減河3號景觀步行橋天目橋,詳細闡述了該橋的方案比選和結構布置。
  18. Scheme design on a metro radio dispatching communication system

    地鐵專用無線通信系統方案比選
  19. Comparison and selection of seepage prevention schemes in hengquan reservoir engineering

    橫泉水庫工程防滲方案比選
  20. So we must compare various methods of designing. this is a very big work

    因此,必須進行多設計方案比選,其設計計算的工作量相當大。
分享友人