施工前 的英文怎麼說

中文拼音 [shīgōngqián]
施工前 英文
preconstruction
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The required levels of construction cost estimates vary at different stages of project development , ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction

    ?建築成本估算要求的精確程度在項目發展的不同階段發生著變化,從早期的相近數字到施工前預算控制時相當準確的是數字。
  2. It s absolutely helpful for the quality of construction and the afterward warrant and pay attention to the moisture content ( rc hydrous quantity ) of the wall before construction

    施工前需注意墻面的保濕度( rc含水量) ,對品質、速度和日後保固將有絕對的幫助。
  3. Report of the pre - construction task force on land matters

    :樓宇施工前期小組有關土地事宜的報告
  4. When construction work resumes, reports should be filed with the license issuing agencies ; before the resumption of work on construction projects which have stopped for over one year, units in charge of construction shall apply to the license issuing agencies for verification of their working licenses

    建築程恢復時,應當向發證機關報告;中止滿一年的程恢復施工前,建設單位應當報發證機關核驗許可證。
  5. The project advisor can revise the drawing 5 days before this project constructs in case of necessity, party b should adjust the construction plan of the project correspondingly

    程顧問必要時可以在該程項目施工前5天修改圖紙,乙方應相應調整計劃。
  6. Progress report on pre - construction task force

    :樓宇施工前作小組進度報告
  7. Progress report on the pre - construction task force

    :樓宇施工前作小組的進度報告
  8. For example, before the commencement of construction works, the contractor of a project is required to carry out a tree survey to identify the number, condition and species of existing trees, and implement protective measures

    舉例來說,承建商須在施工前進行樹木調查,確定現有樹木的數目、狀況和品種,並須豎設保護措,以及定期就樹木狀況提交監察報告。
  9. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開挖技術的發展情況分析,以及結合現代計算機多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鉆機鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「施工前程勘測」 、 「泥漿處理」 、 「原理」 、 「藝」 、 「機具」和「設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用景和改進方向。
  10. Final cure temperature below 15 is not recommended for tank linings. if max. recoating interval is exceeded, please consult technical department for instructions

    以下的固化溫度不建議用於水箱內層。如果過了最大重塗間隔,施工前請咨詢技術部門。
  11. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目世界上規模最大的無粘結預應力隧洞襯砌程,在國內尚屬首例
  12. Main quality management stages are project design stage, pre - construction stage, construction stage, check before acceptance stage

    主要有以下的一些階段:項目設計階段的質量管理、項目施工前期的質量管理、項目過程的質量管理和項目竣驗收階段的質量管理。
  13. Foundation ditch checkout is a important work before base was construct

    基礎施工前的重要
  14. Before constructing, should remove surface dust or other incidentals

    施工前應清除表面塵土或其它雜物。
  15. The surface must be free from oil, grease and dirt, and be dry prior to painting

    表面必須除凈油污和雜質,並在施工前務必保持乾燥。
  16. The surface must be free from oil, grease and dirt, and be dry prior to application

    表面必須除去油污和雜技,在施工前務必保持乾燥。
  17. The surface temperature must be above the dew point. dry surface completely before application

    表面溫度必須在露點以上,施工前徹底乾燥表面。
  18. Chinese medicinal plants from the dangerous slope were moved to another slope nearby

    中藥園施工前的危險斜坡危險斜坡上的中藥植物移植至附近斜坡
  19. The every day meeting of workforce class prior to construction should pick up hse requirement and educate personnel pertinently

    施工前班的每日會議應提出hse要求並切實教育員
  20. By incorporating security concepts into the design of new premises, costs can be saved by identifying design flaws prior to their construction

    即是鼓勵建築師和規劃者在施工前把保安概念融入樓宇的設計,防患於未然。
分享友人