施工基線 的英文怎麼說

中文拼音 [shīgōngxiàn]
施工基線 英文
formation line
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設之建築地,受應自建築地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  2. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的本原理,從最小抵抗、爆眼密集系數、不耦合系數、裝藥密度、爆破進尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道中的運用取得的成效,提高了進度,同時也保證了質量。
  3. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形墻體模板設計、方案選擇及藝等技術難題,筆者結合青島市藝術中心程藝術表演劇場三維空間雙曲清水砼墻,在傳統的單曲可調式大模板的礎上進行了創新,很好的解決了雙曲模板的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。
  4. This paper researches the asphalt expert ' s thinking pattern and adopts two reasoning model to simulate it. of the two reasoning model, uncertain reasoning based on c - f model simulate the asphalt expert ' s simple and linear thinking, while fuzzy reasoning based on fuzzy theory simulate the asphalt expert ' s fuzzy thinking

    本文研究了瀝青路面專家的思維模式,並採用了兩種推理模型予以模擬,其中,於c - f模型的不確定推理模擬瀝青路面專家的簡單、性思維,模糊推理模擬瀝青路面專家的模糊思維。
  5. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場樁橋面的雙程雙分隔接駁斜道,以連接高架引道至落馬洲控制站的現有路面
  6. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的機具包括用於,桿塔組立、架、電纜,光纜序的18大類800餘種產品,如機動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、地器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊器、起重滑車、尼龍輪或鋁輪放滑車等,系列全、品種多,產品具有藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  7. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖和4個垂直剖等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖的應力_ 1 、 _ 2和_ ( xy )對比分佈曲; ( 3 )不同狀態下相同水平或垂直剖的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的程設計和提供參考依據。
  8. With the rapid development of railway construction in china, the network size has been continuously expanded, the net framework strengthened and the network structure optimized. at the same time, the task of railway transportation has been more and more onerous, then the railways are constructed in different ages, complex geological conditions and effected by their designs and constructions as well, in addition, the railways are making advances to speed - up and load - over now, so many railway roadbed have the existence of all kinds of diseases in different degree. these diseases effect badly the normal railway operation, even they may bring about catastrophic accidents

    隨著我國鐵路建設的飛速發展,路網規模不斷得到擴大,路網骨架不斷得到加強,路網結構不斷得到優化,但與此同時,鐵路部門運輸任務日趨繁重,加之我國鐵路修建年代不同、地質條件復雜及受當時設計等因素的影響,且目前我國鐵路正朝著高速重載方向發展,許多路路存在著不同程度的病害隱患,嚴重影響列車的正常運營,甚至造成災害性的事故。
  9. A space geometric non - linear static finite element analysis program about the long span plate - truss composite cable - stayed bridges is presented. not only it can be used to solve the space static analysis about the state of the dead load configuration ( geometry and internal forces ), but also it can be used to analyze the internal forces and deformations of the whole construction course

    於以上理論,並結合斜拉橋的過程,編制了大跨徑斜拉橋的空間幾何非性靜力分析程序,既可用於斜拉橋成橋狀態的空間靜力分析,也可結合斜拉橋的具體過程,進行過程中的內力與變形狀態的跟蹤分析。
  10. The study of probabilistic analysis methods for cwr dynamic stability analysis provides scientific basis for the designing, the constructing and managing of cwr, and lays a foundation for probabilistic design of cwr. the research achievements

    無縫路動力穩定性概率分析方法的研究為無縫路的安全設計、安全和安全管理提供了科學的理論依據,為無縫路的概率設計奠定了礎。
  11. Simulation of erection procedures of cable domes based on nonlinear fem

    於非性有限元的索穹頂模擬分析
  12. Furthermore, on the basis of consultancies, inquiries and evaluations from multiple sources, the model for predicting soil and water loss in dandong - zhuanghe highway construction is developed. moreover, considering the characteristics of the highway, the covering area of the project is divided into three parts such as main body area, soil - fetching area and soil - spoiling area. for these three preventive areas, the perfect precaution measures for preventing and curing the soil and water loss during the road construction in which a number of vegetal cover measures are taken

    論文中詳細調查並介紹了項目情況及沿自然、社會經濟狀況;收集研究了公路建設項目水土流失預測的本內容和方法,在多方查詢、請教專家及分析研究的礎上,提出了丹莊高速公路水土流失預測模型,針對項目不同區域進行了水土流失預測和分析,為水土保持措的設計提供了定量依據;論文根據高速公路項目的特點,將丹東至莊河高速公路項目區分成了主體程、取土場、棄土場三個水土流失防治區,並在初步設計文件的礎上,針對三個水土流失防治區進行了較為完善的水土保持防治措設計;論文在丹東至莊河高速公路水土保持方案設計中大量採用了植被防護措,為了更有力地指導植被措,論文中還就植被保持水土的有效性進行了研究探討。
  13. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;現場的地質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞內應力及總張拉力的實驗數據進行了研究,提出了提高預應力錨索錨固性能的措,以及具體的方案和藝。
  14. This paper unfolds engineering disposition and theoretical research of negative temperature high performance concrete ( nthpc ) with the damage of many factors motivation, the project background based on qing - zang railway engineering, which is one of four - emphasized engineering during the tenth five - plan. due to the difference of environment of construction and service between nthpc and ordinary concrete, and therefore durability of nthpc is required to higher level. at a first, nthpc must avoid frozen damage at early age and possess anti - freezing property at later period, in order to meet engineering practicable application need, and this are two emphasized and difficult problems, as for nthpc ; by means of mechanism analysis about deicing - agent ingredient and anti - freezing at early period, adopting composite technique routine of mineral addition + anti - freezing element + water - reducer4 - air - entraining + anti - erosion of steel component etc, based on orthogonal experimental approach, fd - 1 composite functional admixtu re was manufactured, which has more property and orientation on qing - zang railway

    負溫混凝土由於和普通混凝土在環境及服役環境上存在的差異,因此表現為比普通混凝土更為較高的耐久性要求;負溫混凝土首先要避免早期的凍害以及具備長期抗凍性能,才能夠滿足程實際應用的要求,這也是負溫混凝土必須解決的兩大技術關鍵;通過對目前常用防凍劑組分作用機理的分析研究及混凝土早期防凍機理探討,採用礦物外加劑+防凍組分+高效減水劑+引氣+阻銹組分功能復合的技術路,通過正交試驗設計復配了適應青藏鐵路程要求的專用多功能復合型外加劑fd - 1 ;並在此礎上配製不同等級負溫高性能混凝土,開展一系列包括硫酸鹽侵蝕、氯離子滲透、抗凍融循環、收縮及耐磨性等耐久性能研究;通過對fd - 1組分和摻量的調整,優化負溫混凝土在特性、力學指標和耐久性三個方面的兼容、協調性。
  15. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通過對多個船閘程的研究,結合非性有限元模擬分析方法,考慮重力、溫度等荷載,計算分析土和巖上船閘結構底板預留寬縫方法的效果。
  16. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋形滿足設計要求和成橋內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路本原理,詳細介紹bp神經網路的研究過程,從而建立預應力混凝土連續梁橋預拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在程實例的礎上進行了數值計武漢理大學碩士學位論文算,數值表明,將神經網路應用於預應力混凝土連續梁橋控制,獲得了滿意的結果,在預應力混凝土連續梁橋控制技術研究方面,具有方便有效、精度高的優點,具有良好的應用前景。
  17. Permanent surveying markers as referred to in paragraph 1 of this article include wooden or steel signals and stone markers established at triangulation points, baseline points, traverse points, military control points, gravimetric points, astronomic points and leveling points of various orders and classes, as well as fixed markers used for topographic mapping, engineering surveying and deformation measurement, and installations at seabed geodetic points

    第一款所稱永久性測量標志,是指各等級的三角點、點、導點、軍用控制點、重力點、天文點、水準點的木質覘標、鋼質覘標和標石標志,以及用於地形測圖、程測量和形變測量的固定標志和海底大地點設等。
  18. This paper presents the process of soft ground treatment for coast revetment in the comprehensive improvement construction of coastline from quay no. 3 to tongyi quay at xiamen island, and the construction technology for treatment of the ground at intertidal zone by way of underwater vacuum precompacting and combined heap load precompacting

    摘要介紹廈門島第三碼頭至同益碼頭段岸綜合整治程中的護岸礎軟處理過程,在潮間帶採用水下真空預壓聯合堆載預壓軟處理藝。
  19. The conventional resistance strain sensor has played the key role in short - time strain measuring. however, it also has some disadvantages in some aspects

    針對大型民用礎設的長期在應變測量,常規的電阻應變片難以滿足其監測以及服役期間的狀態監測的需要。
  20. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低巖的承載能力、增大礎的透水性、惡化巖的天然結構和地質構造,這對於水建築物,特別是擋水建築物是不能允許的,同時將會增加採取補救處理措所發生的費用,延長建築物期。
分享友人