施工線 的英文怎麼說

中文拼音 [shīgōngxiàn]
施工線 英文
formation line
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其藝,並指出了橋梁控制的重要性之後,簡要的介紹了程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋控制與監測作的前期實驗作和況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設之建築基地,受應自建築或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  3. The construction of pearl line will have a good effect on the design and construction of civil architecture and the development about elevated rail transit

    明珠的建設對我國高架軌道交通的土建設計和,乃至高架軌道交通的發展起推動作用。
  4. ( 4 ) the instability problem of the columniation supporting was solved in the construction of side - span. ( 5 ) the circle - steel nip - patch anchor was applied for the thread - snap of the prestressed crude steel wire, the double facility anchor was used for deeling with the slip - wire of steel wring

    ( 4 )在邊跨直中,採用一端設立柱另一端吊掛在已合攏梁段上的梁式膺架,解決了支柱支承在古錯落體上的不穩定問題。
  5. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗、爆眼密集系數、不耦合系數、裝藥密度、爆破進尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道中的運用取得的成效,提高了進度,同時也保證了質量。
  6. The route choice for fishway should follow the earlier principle and combine the actual situation of the project and decided by reconnaissance and measure of reconnaissance investor, design and constructing unit together

    魚道路選擇遵循前面的原則,結合本電站的實際情況,由投資方、設計和單位共同進行勘察、測量而定。
  7. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形墻體模板設計、方案選擇及藝等技術難題,筆者結合青島市藝術中心程藝術表演劇場三維空間雙曲清水砼墻,在傳統的單曲可調式大模板的基礎上進行了創新,很好的解決了雙曲模板的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。
  8. Design and construction of space hyperbola rinse concrete wall

    空間雙曲清水混凝土墻模板設計與
  9. Some keys of construction of hyperbolic cooling tower

    雙曲冷卻塔的技術要點
  10. Such methods as compounding retardants, compounding water - reducing agents ( which has various the extent of condensation ), changing the ways of addition and retardarce method, are used to impolder new water - reducing agent and construction method to salve slump loss, but it can not work drastically

    通過復合緩凝組分、不同縮合度減水劑的復合、改變摻加方式、緩釋法等技術路開發新型減水劑和方法來解決坍落度損失問題,但是這一問題並沒有得到根本解決。
  11. This article comtined the practice of the projtct of jiaojiang bridge and analyzed strand wire with high strength and low laxation, the anchorage system, the tentioned technice in the construction, and the principle of anchorage

    摘要本文結合椒江大橋程實踐,分析了國產高強度低鬆弛鋼絞和預應力錨固體系,在中的張拉藝、錨固原理。
  12. This paper researches the asphalt expert ' s thinking pattern and adopts two reasoning model to simulate it. of the two reasoning model, uncertain reasoning based on c - f model simulate the asphalt expert ' s simple and linear thinking, while fuzzy reasoning based on fuzzy theory simulate the asphalt expert ' s fuzzy thinking

    本文研究了瀝青路面專家的思維模式,並採用了兩種推理模型予以模擬,其中,基於c - f模型的不確定推理模擬瀝青路面專家的簡單、性思維,模糊推理模擬瀝青路面專家的模糊思維。
  13. Use : test, measuring, lineation, equipment installation and construction of industrial engineering

    用途:檢驗、測量、劃、設備安裝、程的
  14. The main stem heat input construction of tangshan and jianhua street

    建華道主幹供熱
  15. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場基樁橋面的雙程雙分隔接駁斜道,以連接高架引道至落馬洲控制站的現有路面
  16. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,廠內採用自動化生產焊接成形,現場用高強螺栓連接,減少了焊接作量,使進度和質量得到完全保證。
  17. Application of displacement back analysis to beam bridge ' s alignment control of cantilever construction

    位移反分析在梁橋懸臂施工線形控制計算中應用
  18. Alignment control for box girder of xiebiang hub interchange bridge

    謝邊樞紐立交橋箱梁施工線型控制
  19. Alignment control of continuous rigid frame bridge

    連續剛構橋施工線形控制
  20. The linear control technology for long - span continuous rigid - framed bridges

    大跨連續剛構梁懸臂施工線形控制技術
分享友人