施工總進度 的英文怎麼說

中文拼音 [shīgōngzǒngjìn]
施工總進度 英文
general construction schedule
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨橋梁懸臂澆築的各種形式掛籃行了比較和結,對連續剛構橋懸臂澆築掛籃中重載輕型的發展趨勢行了展望,提出了一種用於解決重載輕型懸臂澆築的新型桁架斜拉式組合掛籃,並行了可行性分析計算和設計。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛程措設計及水模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、期渡汛及壩體填築分期、圍堰設計以及方案及等與混凝土面板堆石壩特點有關的問題行研究,為程建設提供一定的參考。
  3. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的作就下述幾個方面展開:用石灰改良膨脹土的機理;通過室內試驗確定摻灰的技術指標;在室內行膨脹土摻灰的最大有效粒徑的模擬試驗,即鈣離子水試驗,由此結出「粉?塊」灰?土攪拌藝的有效性、合理性和可行性;用數值方法對路堤使用期的濕行模擬,並與路堤的強?變形的計算域耦合,以檢驗土性改良的效果,從而探索一種描述改良膨脹土路堤運行況的數值方法;用現有最常用的且費用最低的機具,對灰?土行「粉?塊」攪拌摻和及路基的填築等。
  4. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用行了詳細的分析;基於現場的地質條件,對錨索錨固力及錨索最佳錨固段長行了理論計算;制定了實驗研究方案,行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及張拉力的實驗數據行了研究,提出了提高預應力錨索錨固性能的措,以及具體的方案和藝。
  5. Taking garden architectural colored drawing as the research object, the article starts with the basic characters of the colored drawing, summarizes the evolution, classification and structure of the colored drawing by the numbers, and analyzes the art accomplishment of the colored drawing on garden architecture on the basis of the above - mentioned, probes into the innovation and development of the colored drawing on garden architecture from different points of view such as structure, picture, color, theme, construction method, etc

    以園林建築彩畫為研究對象,從彩畫的基本特徵入手,對彩畫的沿革、分類及其結構行了較為系統的結,並在此基礎上對彩畫在園林建築上取得的藝術成就加以研究分析,從構圖、圖案、色彩、主題、方法等不同角探究了彩畫在園林建築中的創新與發展。
  6. Commodity house opens to booking need to have the following requirement : ( one ) open to booking a person to already obtained estate to develop intelligence letter, business charter ; ( 2 ) concern gold of sell one ' s own things of access of formulary consign land according to land management department, already obtained land access letter ; ( 3 ) licence of program of hold construction project and permit of construction project construction, already dealt with construction project quality and safety to control procedures ; ( 4 ) schedule of affirmatory already construction and complete consign use time ; ( 5 ) 7 achieve main body project below to seal a top ; 7 with what go up, the 2 / 3 above number of plies that main body project must build engineering budget to invest amount ; ( 6 ) already opened commodity house to open to booking a special account in project seat commercial bank ; ( 7 ) the other condition that law, code sets

    商品房預售需具備以下條件: (一)預售人已取得房地產開發資質證書、營業執照; (二)按照土地治理部門有關規定交付土地使用權出讓金,已取得土地使用權證書; (三)持有建設程規劃許可證和建設許可證,並已辦理建設程質量和安全監督手續; (四)已確定和竣交付使用時間; (五)七層以下的達到主體程封頂;七層以上的,主體程須建到程預算投資額的三分之二以上層數; (六)已在項目所在地商業銀行開設商品房預售款專用賬戶; (七)法律、法規規定的其他條件。
  7. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設程規劃許可證和許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到程建設投資的25 %以上,並已經確定了和竣交付日期。
  8. Abstract : combining the engineering practice of xiayingzi railway frame overpass in huainan, the paper describes the details of the technical characteristics and construction technology of long span skew frame bridge

    文摘:結合淮南夏郢孜框架式鐵路立交橋的程實踐,對大跨斜交框架技術特點及行了較詳細的結。
  9. So carry through the construction technology of typical sect of natm by shallow - buried summary on west fourth ring road buried culvert of beijing branch of the middle line of south - to - north water transfer project, which would offer reference for future similar projects

    其中,暗涵程交叉管線眾多,在西四環立交橋樁基中間穿過,淺埋暗挖法有一定的難,為此,對南水北調中線北京段西四環暗涵淺埋暗挖典型段技術結,以為今後類似程提供參考和借鑒。
  10. Engaged system, subject ' s construction and the trans form of wage system in our university. meanwhile, it points out that being unable to satisfy the primary need of income, ignoring the elaboration of academic right, misunderstanding of the appointment of teachers post, the insufficient of training, and the lack of spirit encouragement are the main problems in colleges and universities

    對我國高校採取的聘任制、學科梯隊建設、資制改革等有效激勵措行了結,同時指出,不能滿足收入需要這一首要需要、忽視學術權力的發揮、教師職務聘任的誤區、培訓力不夠以及缺乏精神激勵是現階段我國高校激勵存在的主要問題。
  11. The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine, and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan, by working out plan, following up the construction and timely error correcting management to make sure the achievement of project ' s task time

    新建項目的控制的關鍵是要合理地確定項目控制期和階段性控制期,並將其分解落實到計劃中,以實現程及早投運、及早發揮效益的目標;更新改造項目的控制則要以計劃的落實不影響程的年灌溉計劃為目標,採取合理制定計劃、跟蹤、及時糾編的管理辦法,確保項目期目標的實現
  12. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程
  13. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和的關鍵技術問題。 、本文對水大體積混凝土溫控問題行了分析和結,結合青居水電站閘壩程,開展溫應力及溫控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究過程中溫控措的簡化,以加大澆築尺寸,簡化程序,加快,節約程費用。
  14. The artide, the process contrd in construction project, analyzed the inner aned outer environment of the construction enterprise, considered the advanced managing experience of some construction enterprises in and out of china, researched the managing theories and summarized the practice experience from project cost contrd, progress contrd, quality contrd and capital contrd, and tried to find an efficacious way to superintend the process of the construction, the article indude five parts : 1. the necessity and strategic significance of carrying out the contructinn project process contrd. 2. the current situations and main problems of the project process contrd in china. 3. the experience of the project process contrd in and out of china, and the revelation for us. 4. the methods and contents of enhancing the project contrd in enterprise, include the methods and contents of the project cost contrd, highlighting quality contrd and improving quality standard, highlighting quality contrd and improving quality standard, the contrd of project planning progress and resource management, strengthening financial management and increasing the profits. 5. speeding up the reform of the project control institution, improving the scientific and efficacious managing institution, improving the scientific and efficacious managing institution, and some key respects in the project management process

    所有者缺位,企業沒有真正地建立起現代企業制,決策缺乏科學性,人本管理、企業文化建設、制建設沒有真正地的落到實處,企業的經營權力過分集中,經營者負盈不負虧,拼資源的現象普遍存在,管理水平不高,盈利能力較弱,競爭能力不強,人員素質較差,是大部分國有企業內部的通病。 《項目過程式控制制》這篇文章,通過對企業所處內外環境的客觀分析,結合國際國內的一些企業的先管理經驗,從項目成本控制,控制,質量控制,資金控制等方面行理論探索及實踐結,力爭找出一條有效監控企業過程的成熟的管理之路,全文共分五個部分:一、實項目過程式控制制的必要性及其戰略意義。二、當前我國項目控制的現狀及其存在的主要問題。
  15. Integrated the 8th section of sui - yu railway project being built bycrec ( china railway engineering civil co. ltd ) into this paper and proceeding with the macrocosmic management of construction item, the author expatiates on how to focus on the center of the construction schedule goal and do well in schedule, quality, safety, cost and environment protection

    本文結合中鐵二局股份公司正在的遂(寧)渝(重慶)鐵路第8標段程,從項目整體管理入手,闡述了如何圍繞目標這個中心,從、質量、安全、成本、環水保管理搞好項目管理。
  16. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該橋推薦方案的橋址、武漢理大學碩士學位論文橋型及橋梁體布置提出了合理化的建議;通過驗算,對預拱及保險墩的設置提出了要求,對交界平衡墩行了優化設計;結構驗算表明,轉體勁性骨架強、穩定性富餘系數較大,截面幾何尺寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了程投資,加快了,增強了橋梁的美觀。
  17. This paper taking zigui longtanghe bridge in hubei province as a project background, studies about the unified construction technology of tower and buckle frame in erection with cableway used in steel pipe - encased concrete arch bridge constructioa based on the analysis of the construction property of long span steel pipe - encased concrete arch bridge, this paper raises the general scheme and basic structure of unified construction, analyzes the mechanical behavior of unified structure of construction statue, mainly discusses the strength, stiflhess and stability of the unified structure

    本文以湖北秭歸龍潭河大橋為程背景,對大跨徑鋼管混凝土拱橋纜索吊裝塔架扣架一體化技術行了研究。論文以大跨徑鋼管混凝土拱橋特點分析為基礎,提出了一體化體方案與基本結構構造,分析了狀態一體化結構的力學行為,主要探討了一體化結構的強、剛及穩定性,採用動態監控系統確保了一體化結構在橋梁過程中的安全可靠性,從而形成一套系統的纜索吊裝新技術,並在實橋行了應用,效果良好。
  18. In addition, influence to density and strength of cement - stabilized soil because of molding delay and reasonable curing period from completion of subbase to the compaction of road - base are also researched. finally, experiment section of cement - stabilized silty soil subbase is constructed according to lab research results, and construction methods are summarized

    此外,研究了延遲成型時間對水泥穩定土的密和強的影響及底基層成型后至基層壓實前的合理養生齡期,最後,根據大量的室內研究成果行了大劑量水泥穩定粉質土底基層試驗路的鋪築,並對行了結。
  19. Construction diversion and flood passing are a important part of construction scheme in the design of concrete face rockfill dam. the flood passing standard and measures of construction diversion have special characteristic and are closely related to the construction stage and general schedule of the project

    在混凝土面板堆石壩設計中,導流及渡汛是方案的重要組成部分,混凝土面板堆石壩的導流渡汛標準和方式有其自身的特點,而且與程的分期和安排密切相關。
  20. Quality supervision : supervise and control actual situation of site quality test, including personnel, organization, technical implement, quality, progress, safety, protection for finished product and others ; summarize and document every quality record and relevant information, inform superior regarding quality problem

    質量監督:監控項目現場質檢作的具體實情況,包括人員組織、技術實、質量、、安全、成品保護等;匯、存檔各項質檢記錄及相關資料;及時上報批量質量問題。
分享友人