施工隧洞 的英文怎麼說
中文拼音 [shīgōngsuìdòng]
施工隧洞
英文
approach adit- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 洞 : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
- 施工 : be in the process of construction; be under construction; build; construction
-
In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed
計算結果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results
本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation
隧洞施工穿越高地應力區,且施工區活躍的地下水對隧洞施工及日後的安全運行有著重要的影響。Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now
特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted
針對紫坪鋪工程4條引水發電隧洞復雜多變的地質條件,採用新奧法隧洞信息化施工中倡導的實時動態監測技術,跟蹤現場施工進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。Construction of a highway tunnel going through large scale karat cave
公路隧道通過大型溶洞群施工技術In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction
大埋深將使隧洞開挖施工時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋隧洞建設快速發展的主要因素。But to deep - lying diversion runnel, there are a lot of problems to be resolved not only hi design theory but also in techniques
然而對深埋引水隧洞,無論是設計計算理論,還是施工建設技術,都處在探索階段。The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m
這一工程的關鍵技術是四條長達18公里、開挖洞徑11米、最大埋深2500米左右深埋長隧洞的設計和施工。Landslip construction control in changjiashan tunnel of qi - lin superhighway
祁臨高速常家山隧道滑坡進洞施工控制Construction of long tailrace tunnel bifurcation concrete structure for dachaoshan hydropower station
大朝山水電站長尾水隧洞岔管混凝土施工Heat insulating measures of aqueduct during construction of dalian diversion water from biliuhe reservoir
大連市引碧北段玉皇廟隧洞工程的施工管理Study on foundation treatment of dashahe siphon for water diversion project from biliuhe reservoir to dalian city
在大連市引碧玉皇廟隧洞施工中的應用The high pressure consolidation grouting is a routine measure for tunnel construction treatment, the safe operation of tunnel depends much on the grouting quality, so it is very important for tunnel construction to detect the construction quality to get rid of the safety risk
摘要高壓固結灌漿是隧洞施工處理的常規手段,其質量直接影響隧洞運行安全,因此對施工質量進行檢測以便排除隱患十分重要。The main methods for the construction of tunnel are usually both the traditional drilling and blasting method and the modem method of tbm, which have their own applicable conditions concerned
摘要隧洞施工的主要施工方法是傳統的鉆爆法和現代的掘進機法,各個方法均有其不同的適用條件。However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum
但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned
摘要主要針對大夥房水庫輸水工程,根據其設計階段的地質勘察成果,同時結合施工中已開挖揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要工程地質問題等進行了綜合評述,以期關心本工程的人士能對隧洞的工程地質條件有初步了解和認識。Goal model on system reform of the urban public healthcare facilities in china
引水隧洞施工中遇不良地質段的處理措施Design and construction of hydraulic tunnel of hongjiadu hydropower station
洪家渡水電站水工隧洞設計與施工This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist
該課題研究直接調查了十四家施工企業和四十多個項目施工現場,項目類型涉及鐵路工程、市政公用工程、公路工程、房屋建築工程、機場場道工程、橋梁工程、水工隧洞工程、土石方工程等,對施工現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風險評價、風險控制過程存在的主要問題,並分析了為什麼會存在這樣的問題。分享友人