施工隧洞 的英文怎麼說

中文拼音 [shīgōngsuìdòng]
施工隧洞 英文
approach adit
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 施工 : be in the process of construction; be under construction; build; construction
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏程引水灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長的設計和中面臨的一些問題,選取的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措等方面進行了探索、研究。
  3. The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation

    穿越高地應力區,且區活躍的地下水對及日後的安全運行有著重要的影響。
  4. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在高地應力、高地下水位區域的建設,其難度更大,在國內的水利水電程建設中並不多見。
  5. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪程4條引水發電復雜多變的地質條件,採用新奧法信息化中倡導的實時動態監測技術,跟蹤現場進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  6. Construction of a highway tunnel going through large scale karat cave

    公路道通過大型溶技術
  7. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋深將使開挖時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋建設快速發展的主要因素。
  8. But to deep - lying diversion runnel, there are a lot of problems to be resolved not only hi design theory but also in techniques

    然而對深埋引水,無論是設計計算理論,還是建設技術,都處在探索階段。
  9. The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m

    這一程的關鍵技術是四條長達18公里、開挖徑11米、最大埋深2500米左右深埋長的設計和
  10. Landslip construction control in changjiashan tunnel of qi - lin superhighway

    祁臨高速常家山道滑坡進控制
  11. Construction of long tailrace tunnel bifurcation concrete structure for dachaoshan hydropower station

    大朝山水電站長尾水岔管混凝土
  12. Heat insulating measures of aqueduct during construction of dalian diversion water from biliuhe reservoir

    大連市引碧北段玉皇廟程的管理
  13. Study on foundation treatment of dashahe siphon for water diversion project from biliuhe reservoir to dalian city

    在大連市引碧玉皇廟中的應用
  14. The high pressure consolidation grouting is a routine measure for tunnel construction treatment, the safe operation of tunnel depends much on the grouting quality, so it is very important for tunnel construction to detect the construction quality to get rid of the safety risk

    摘要高壓固結灌漿是處理的常規手段,其質量直接影響運行安全,因此對質量進行檢測以便排除隱患十分重要。
  15. The main methods for the construction of tunnel are usually both the traditional drilling and blasting method and the modem method of tbm, which have their own applicable conditions concerned

    摘要的主要方法是傳統的鉆爆法和現代的掘進機法,各個方法均有其不同的適用條件。
  16. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設建設力度的加大,邊坡、大壩、橋梁、、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  17. So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned

    摘要主要針對大夥房水庫輸水程,根據其設計階段的地質勘察成果,同時結合中已開挖揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要程地質問題等進行了綜合評述,以期關心本程的人士能對程地質條件有初步了解和認識。
  18. Goal model on system reform of the urban public healthcare facilities in china

    引水中遇不良地質段的處理措
  19. Design and construction of hydraulic tunnel of hongjiadu hydropower station

    洪家渡水電站水設計與
  20. This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist

    該課題研究直接調查了十四家企業和四十多個項目現場,項目類型涉及鐵路程、市政公用程、公路程、房屋建築程、機場場道程、橋梁程、水程、土石方程等,對現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風險評價、風險控制過程存在的主要問題,並分析了為什麼會存在這樣的問題。
分享友人