施工順序 的英文怎麼說

中文拼音 [shīgōngshùn]
施工順序 英文
construction consequence
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  1. The expressions of displacement fields of dorsal and frontal surface for two piles, row piles and group piles are derived. the solution taking into consideration the effect of construction sequence of jacked pile accords with the actual engineering

    該式考慮到了沉樁施工順序的影響,較各樁的簡單疊加更符合程實際情況,而且能夠簡化為不考慮施工順序的靜壓群樁擠土位移場的解答。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、模板程、混凝土程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力質量的技術;採用重物移運器有效移梁的方法;壓漿、封端、橋面防水層和保護層的一些規定和注意事項等都是對箱梁製造行之有效的技術和方法,並可為以後類似作借鑒。
  3. Some experts once suspected that the reserve pre - stresses in the lateral beams are not enough. in order to settle this problem, three construction schemes are analyzed comparatively. the results indicate that the pre - stresses in the lateral beam are acceptable and tensioning the reinforcements by two steps is the appropriate method both for the girder and the lateral beam

    針對這一問題,本文採用三種方案進行對比計算分析,結果表明橫隔梁中的預應力儲備是滿足要求的,而且金馬大橋採用的這種橫隔梁力筋分批張拉的施工順序使該橋邊主梁及橫隔梁的受力都較為合理。
  4. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序方法(支架法、滑模法、爬模法和翻模法) 、傾斜塔柱的抗傾措、橫梁及支撐系統。
  5. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和,指出憑主觀臆斷與經驗來是不可取的;在分析、經較逆作法與大開挖作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  6. Consequently time and cost can be saved greatly. ( 3 ) design method for controlling cracks in the negative moment zone of the continuous composite girder the crack mechanism of the concrete deck in the negative moment zone of the coniinuous composite girder, the relationship between the crack and the int

    分析認為,採用中間支點升降法與調整混凝土板施工順序相結合的方法,不僅可以避免負彎矩區混凝土裂紋,還可以合理調整鋼梁和混凝土板的內力,並使端支點與中間支點反力更均勻,使組合梁橋的結構更加經濟合理。
  7. It presents the computation models of different construction conditions, based on construction sequence and technologies

    根據施工順序藝,確定不同況下計算模型。
  8. Optimization of the construction sequence and anchoring parameters in the large underground cavern excavation of shuibuya project

    水布埡大型地下廠房施工順序和錨固參數優化分析研究
  9. The result shows that on matter which construction order is adopted, the midwall will always slant to the side of shallower depth of cover

    結果表明:不管採用哪一種施工順序,中墻均受偏壓荷載的作用並向埋深較淺側傾斜。
  10. The task sets up calculation model of continuous beam on elastic support according to erection order of bridge deck differently, which embody reasonably load of every suspender

    本課題根據橋面施工順序分別建立吊索(桿)內力計算模型,合理的體現了各吊索(桿)的受力情況。
  11. Fifth, the paper detailed study the characteristic, construct order, serum material, major construct process parameter, major construct equipment of technique and the construct process of composite grouting

    第五,本文對復合注漿技術法的特點、施工順序、漿液材料、主要藝參數、主要設備及藝進行了詳細的研究。
  12. The reconstruction project of shanghai metro line 1 is carried cut in accordance with the master plan of the south station, construction subsequence, signal reconstruction plan and vehicle operation organization

    摘要介紹了上海軌道交通1號線上海南站站改建程的總體設計方案、撥接計劃、施工順序、信號改造過渡方案、列車運行組織以及撥接的全過程。
  13. Construction process planning of structures has an influence upon the cost of the construction, the internal force of the structure, the safety during the construction course etc. so it is very important to find the optimal construction planning

    建築物的施工順序對結構的內力、建設成本、安全性等產生很大的影響。因此,存在著一個流程(路徑)的優化問題。
  14. The theory and method of sluice fem simulation analysis and the simulation modeling in simulation analysis and the technique of actualize in ansys are researched. the simulation modeling of actually loading in process of sluice construction is actualized

    研究了水閘有限元模擬分析理論和方法,及ansys軟體中水閘模擬分析的模擬模型建立和實技術,對水閘施工順序的模擬進行研究。
  15. This system is the new type, in which the connection between the special - shaped column and concrete block is stronger than that of frame structure and the dark beams are located and its constructional sequence is brickwork first and placing columns second and concrete blocks are as bottom forms when beams are placing

    這種新型結構形式的主要特點包括:異形柱與砌塊為馬牙槎連接、墻體內含有暗梁、施工順序為先砌墻后澆柱、梁澆築時以砌塊為底模。
  16. The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable

    大型地下洞室群過程是極其復雜的,採用科學的系統模擬方法對地下洞室群全過程進行模擬,使各洞室、機械設備相互協調配合,使洞室群施工順序進度計劃更加合理,對于加快洞室群進度,降低程造價,保證利進行非常必要。
  17. The influences of the properties of alluvium deposit, the properties of diaphragm wall concrete, the construction sequence of diaphragm walls, the distance between diaphragm walls and dam toe and the shape of diaphragm walls on the stress - deformation behaviors of diaphragm walls of concrete face rockfill dams were studied

    研究了覆蓋層特性、防滲墻混凝土特性、防滲墻施工順序、防滲墻與壩趾之間距離和防滲墻形狀對于面板堆石壩防滲墻應力變形性狀的影響。
  18. Displacement back analysis and optimum design of excavation subsequence in underground engineering are important to reliability analysis of surrounding rock and detail design. in underground engineering the method to determine initial ground stress and mechanical parameters of surrounding rock mass and excavation subsequence is key problem to design and study

    地下程位移反分析及開挖優化設計是地下程圍巖穩定性分析與設計的重要內容,探討地下程圍巖初始地應力與力學參數以及其開挖施工順序的確定方法是目前地下程設計與研究的關鍵問題。
  19. First, based on comprehension analysis of the present study status on optimizing method to displacement back analysis in underground engineering home and abroad, intelligent optimizing method, which fits the features of underground engineering, has been developed by introducing annealing algorithm and genetic algorithm and improving them. second, according to practical features of nonlinear displacement for underground engineering, the mechanical model on back analysis to initial ground stress and mechanical parameters of surrounding rock mass in underground engineering is established, which is based on the measuring results of displacement of convergence in underground holes. while, by introducing finite element method and combining improved annealing algorithm and improved genetic - annealing algorithm, the theory and method of elastic - plastic displacement back analysis to surrounding rock in underground engineering has been founded

    首先,本文在綜合分析國內外地下程優化位移反分析方法研究現狀的基礎上,引進模擬退火與遺傳演算法,並對其進行改進,建立了適合於地下程問題特點的智能優化演算法;其次,根據地下程非線性特點,基於地下程洞周收斂位移量測結果,建立了用於地下程初始地應力與圍巖力學參數反演分析的力學模型,並引進有限元分析手段,結合改進模擬退火演算法與改進遺傳-模擬退火演算法,分別建立了基於這兩種智能優化演算法的地下程圍巖彈塑性位移反分析理論與方法,並開發了相應的分析計算程,為地下程圍巖穩定性與開挖優化分析奠定了基礎;然後,在上述基礎上,根據地下程開挖施工順序優化設計的特點,建立了基於圍巖塑性區面積的地下程開挖施工順序優化分析模型,基於改進模擬退火演算法與改進遺傳-模擬退火演算法建立了地下程開挖施工順序優化分析方法,並開發了相應的分析計算程;最後,將上述分析計算程用於程實例分析,探討了其應用方法,證明了該文研究成果的合理性和可靠性。
  20. Influence of the temperature field and stress field is ignored but some other factors are considered such as temperature difference between the surface and inside of the concrete, circumstance temperature, work sequence, shaping period, elasticity modulus, the volume etc. and the emulation technology is applied to calculating the construction of the concrete

    運用模擬技術對大體積混凝土結構進行了不考慮損傷狀態下的溫度場及應力場的模擬計算。計算過程中綜合考慮了混凝土結構內部溫度的變化,環境溫度的變化,施工順序,澆築時間以及材料彈性模量的變化,徐變特徵,自身體積等因素,同時指出了模擬計算中存在的問題與不足之處。
分享友人