施拉程序 的英文怎麼說

中文拼音 [shīchéng]
施拉程序 英文
tensioning procedure
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : 拉構詞成分。
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. In order to get an better control in horizontal displacement of tower top and the internal strength and displacement in beam, the theme take an circulating forth piece together means and get to a good target. the theme carry the theory through bsap program in design of the large highway bridge in anqing and prove the theory of the theme ' s useful and availability

    結合在安慶長江公路大橋的設計工作,論文採用了bsap系列有針對性的進行了實際應用,實際生產的使用表明了本文所採用理論與方法的有效性,為斜工控制的模擬計算過提供了一種參考與依據。
  2. A space geometric non - linear static finite element analysis program about the long span plate - truss composite cable - stayed bridges is presented. not only it can be used to solve the space static analysis about the state of the dead load configuration ( geometry and internal forces ), but also it can be used to analyze the internal forces and deformations of the whole construction course

    基於以上理論,並結合斜橋的工過,編制了大跨徑斜橋的空間幾何非線性靜力分析,既可用於斜橋成橋狀態的空間靜力分析,也可結合斜橋的具體工過,進行工過中的內力與變形狀態的跟蹤分析。
  3. A computer program is also presented on calculating the instantaneous prestress losses and the tension value of prestressing tendon, which can be used conveniently in design or in construction

    本文編制了計算預應力摩擦損失、錨固損失和張伸長值的,能夠在設計或工中很方便地使用。
  4. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和應力數值來判斷塑性混凝土防滲墻的安全度。
  5. Barbara ' s design, development and implementation capabilities ensure an efficient tailored approach to situations that require growth in people, process and profitability

    笆笆博士的設計、發展和實能力確保了她能夠為與員工、和利潤相關的問題提供高效的、量身定做的解決方案。
  6. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋工實踐為背景,以主拱工研究為主線,對鋼管混凝土拱橋重難點工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋工過中內力的計算,確定了拱肋工最不利荷載工況下加載重量、壓重順和張臨時預應力束等一系列工措,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  7. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平面桿系工裝配計算和大型結構分析- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系倒拆出斜索合攏前的索力(目標索力) ,利用ansys結構分析,經過多次的工過模擬計算之後得出達到目標索力的合理的工步驟。
  8. In light of the simulative research results, three methods are applied to analyze some controversial problems in this kind of structural system ( such as the concrete pouring sequence of continuous ends, the applying sequence of pretensioned force, the removal of the temporary supports, the concrete pouring style of continuous ends, the optimization of constructional reinforcement and prestressed reinforcement ). some important conclusions are drawn : the concrete pouring sequence of continuous ends should be in accordance with the principle of " interval end " ; the removal of temporary supports is also on this principle ( opposite to traditional opinions ). at the same time, other problems such as the shrinkage and creep effects of concrete, the c racking and failure pattern, the optimization of reinforced bars and prestressed bars are also analyzed in detail

    在此基礎上,對于目前先簡支后連續結構體系中存在的一些有爭議的問題(如后連續端部澆築和后連續預應力張的順、體系轉換中的臨時支座拆除順、后連續端部澆築方式、后連續端部的預應力筋及普通鋼筋的優化等) ,我們分別運用三種方法進行了細致的模擬分析、研究,並得出了一些具有重要工意義的結論:后連續端部的澆築順和后連續預應力張的「隔跨」原則,臨時支座拆除的「隔跨」原則(此前人們一直認為「對稱澆注和對稱張」是最為合理的工工) ,混凝土的收縮、徐變對先簡支后連續結構體系的影響一般較小等。
  9. This can be of significant benefit to cut down the cost and time limit for a project the program package gone with this paper may realizes the dynamic simulation for all of courses in hoisting, and may synchronously displays the axis force of derrick, the pull - force of the steel wire, obliquity of equipment and overloading instance

    這有利於工實踐中方案變更、工現場條件復雜多變等的方案驗算,節約成本和縮短工期。本論文為桅桿吊裝整個過實現了動態模擬,顯示桅桿軸向壓力、鋼絲繩力、設備傾角和起重超載提示,為安全吊裝設備提供重要的數據,有利於作業過的全監控。
  10. Upon author ' s long distance experience in producing aluminum easy open can, he had studied and researched deeply many kind of easy open cans in the worlds, analyzed the technique of key several production program of can making and solved a series of key technical problems during the process of light - weighting such as, aluminum raw material, can profile design, press technique and mould design etc. after carrying out light - weighting, the used aluminum raw material thickness of easy open can ' s body could be thinned from 0. 325mm to 0. 285mm, the weight of gram per can could be reduced from 13. 625g to 11. 948g, its economic benefit could be more big obviously

    本文在對國內外輕量化技術的應用現狀進行深入分析的基礎上,從技術層面對易罐輕量化實中的若干關鍵性問題進行了探討。通過對國內外各種罐型所進行的深入研究,從易罐製造過中關鍵工的工藝分析入手,解決了輕量化實中罐用材料、罐型設計、沖壓工藝、模具設計等一系列關鍵技術難題。輕量化技術成功實后,易罐罐體所用鋁材厚度從0 . 325mm減少到0 . 285mm ,單罐克重從13 . 625g降低到11 . 948g ,取得了明顯的經濟效益。
  11. This thesis is mainly focused on the analysis method in numerical simulation of mechanic behavior of the long - span cable - stayed bridge in construction and the computer programming

    本文重點研究了預應力混凝土斜橋在工過中的力學行為的數值模擬分析方法及其計算機實現。
  12. Furthermore, combining with the experiment of yibin zhongba jinshajiang cable - stayed bridge concrete model, this thesis using finite element method studies shear lag effect of the cable - stayed bridge with n cross section and offers suggestion to the project

    此外,本文結合宜賓中壩金沙江斜橋模型實驗,利用有限元和模型實驗方法,研究雙主肋形截面斜橋的剪力滯效應,對雙主肋截面斜橋的設計和工提供一定的參考。
  13. I will regard this article as a personal review of tprm since its establishment and hope it will function more actively and fully within wto framework in the future. this paper can be divided into 5 parts : the first part describes the evolution of tprm, which has undergone an unusual process : from gatt rules and tokyo round negotiation to uruguary round negotiation. the second part is concerned about the contents of tprm, including the contents of the agreement and the trade policy review process

    文章共分5個部分:第一部分描述了貿易政策審議機制的歷史演進,機制的形成經歷了一個不平凡的歷,從關貿總協定的規定到東京回合談判,再到烏圭回合談判;第二部分介紹了貿易政策審議機制的主要內容,包括貿易政策審議機制協議的內容和貿易政策審議;第三部分分析了貿易政策審議機制的價值和性質;第四部分對改進貿易政策審議機製做了一些探討,同時對影響貿易政策審議的一些實質性問題進行討論;最後一部分對我國入世后的應對措提出了一些具體建議。
  14. Then in this thesis some basic methods for geometric nonlinear analysis of cable - stayed bridges have also been discussed and algorithm of co - moving coordinate iteration combined incremental and iterative approach is established

    在此基礎上編制了綜合分析gnacsb 。最後對幾種典型實例進行了分析,考查了斜工、運營階段的幾何非線性結構特性。
分享友人