日日拉池 的英文怎麼說

中文拼音 [chí]
日日拉池 英文
balta jijilei
  • : Ⅰ名詞1 (太陽) sun 2 (白天) daytime; day 3 (一晝夜; 天) day 4 (泛指某一段時間) time 5 (日...
  • : 拉構詞成分。
  • : 名詞1 (池塘) pool; pond 2 (旁邊高中間窪的地方) an enclosed space with raised sides 3 (舊指劇...
  • 日日 : d. i. d dies in dies
  1. Also, the author ’ s design strategy and creativity has been given in this paper. specifically, it includes : based on the feasibility analysis of the fit selection of control parameters in the aeration process, the aeration process of wastewater treatment of the joint - constructional complete - mixed activated sludge process has been aimed at in this paper. then, the state equations of the aeration process have been proposed in this paper, which is on the base of dissolved oxygen concentration ( do ) and discharge quantity of sludge ( qw ) as control variables, the concentration of bod and sludge as state variables. based on the present study on optimization control of wastewater treatment, the multivariable optimal control model with restriction factor has been presented in the paper with introducing modern control theory and system analysis into the field of activated sludge wastewater treatment,

    具體包括:以完全混合、表面曝氣合建式活性污泥工藝的污水處理曝氣過程為研究對象,在闡述了曝氣過程式控制制參數選取可行性的基礎上,建立了以溶解氧濃度do和活性污泥排放量qw為控制變量,以曝氣中有機物濃度s和微生物濃度x為狀態變量的活性污泥曝氣過程的基本狀態方程;運用現代控制理論的觀點和污水處理理論,在現有關于污水處理最優控制問題研究的基礎上,建立了有約束條件多變量能耗最小數學模型,該數學模型是以有機物排放總量和狀態變量的末值條件作為約束條件,曝氣過程的能耗最小作為目標泛函;採用增廣格朗乘子法對最優控制問題進行轉化,並對應用極大值原理求解能耗最小這一最優控制問題進行了詳細的解析;引入約束運算元,應用具有控制約束的共軛梯度演算法對能耗最小這一最優控制問題進行求解,並進行模擬實驗驗證。
  2. On july 29th, 2002, the fourth e glass furnace of ctg was ignited

    2002年7月29,公司舉行第四條無堿玻纖絲生產線點火儀式。
  3. On march 9th, 2001, the 15, 000mt / year direct - melting e glass furnace was ignited in ctg

    2001年3月9,公司舉行1 . 5萬噸無堿玻纖絲生產線點火儀式。
  4. On march 28th, 1997, the first 10, 000mt / year direct - melting e glass furnace in china was ignited successfully in ctg

    1997年3月28,我國首條萬噸無堿玻纖絲生產線一次點火成功。
  5. On june 26th, 2005, the sixth e glass furnace of ctg with production capacity 30, 000mt / year was ignited

    2005年6月26,公司隆重舉行了六線3萬噸無堿玻纖絲生產線技改項目點火儀式。
  6. On nov 18th, 1994, the foundation of the first 10, 000mt / year direct - melting e glass furnace in china was established in ctg

    1994年11月18,舉行我國首條萬噸無堿玻纖絲生產線奠基儀式。
  7. On dec, 19th, 2001, taishan fiberglass inc, was inaugurated and the third e glass furnace of ctg was ignited

    2001年12月19,公司舉行泰山玻璃纖維股份有限公司揭牌儀式暨第三條無堿玻纖絲生產線點火儀式。
  8. Our grand regency ballroom gives you the opportunity to hold grand - scale conferences and meetings, weddings, banquets, and all other kinds of social and business activities up to 800 people. the hotel s 5 conference rooms have a capacity from 720 to 1200 persons and are equipped with the most up - to - date technical facilities. in our recreation center you find an extensive range of recreation facilities, including indoor swimming pool, tennis, squash, billiards, table tennis, gymnasium, chess board games, foot reflexology, bowling, nightclub and karaoke

    擁有各類客房及服務式公寓共393間套,包括無煙樓層和商務樓層中西式餐廳和酒吧共有7個,可滿足不同口味客人的需要完善的健身休閑娛樂設施包括泳健身房網球壁球臺球乒乓球棋牌室足部保健室美容美發保球夜總會卡ok等,誠邀您來此休閑運動恢復體力體驗溫馨愜意。
分享友人