日進度 的英文怎麼說

中文拼音 [jìn]
日進度 英文
daily advance
  • : Ⅰ名詞1 (太陽) sun 2 (白天) daytime; day 3 (一晝夜; 天) day 4 (泛指某一段時間) time 5 (日...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. On feb. 14th, ittf president adham sharara visited peking university to inspect the construction work of the table tennis competition stadium for the 2008 olympic games

    2006年2月14,國際乒聯主席沙拉拉一行來訪北京大學,了解2008奧運乒乓球比賽館施工,並參觀了北京大學方正乒乓球俱樂部。
  2. The paper made an ecological anatomy, a cultivation experiment on the lime - soil habtat and an analysis on the diurnal variation of photosynthetic an transpiration rate from three aspects of morphology, transplantation, physiology. the conclusion is that : ( 1 ) from the viewpoint of morphological anatomy, it has typical xerophyte structure such as strong root system, small leaf area, dense floss under the leaf surface, high stomatal density, the small opening degree, developed vessels and palisade tissues etc

    從形態學、栽培學和生理學三方面對迷迭香行生態解剖、石灰土上的栽培實驗以及光合蒸騰速率程的分析,得出以下結論: ( 1 )在形態解剖上:迷迭香具有發達的根系,較小的葉面積,葉片下表面密被絨毛,氣孔密大,開小,厚的角質層和發育良好的木質部和柵欄組織等典型的旱生結構。
  3. Following the approval of the relevant manualsmaintenance scheduleflight test schedule and the conducting of inspections of its facilities and route proving flights to ensure its fulfillment of the department s requirements, an aoc was granted to cr airways on march 16

    民航處又審批有關的手冊維修作業表飛行試驗表,檢查其設施和監察其航線驗證試飛,確保該公司符合處方各項要求后,於三月十六簽發航空營運許可證予該公司。
  4. By analysis the test data, the law of temperature variation in day and temperature variation in month was got ; moreover, the probability statistics mode of day temperature difference with its statistic parameter was got too. at the same time, the year temperature difference data of walls and roofs were obtained. through the field tests, the law of thermal cracks, displacement and stress in cshbb was summarized

    對杭州市某一小砌塊試點建築行了為期近一年的現場跟蹤監測研究,給出了小砌塊建築的變化規律和月溫變化規律,並由此得到了小砌塊建築的溫差概率統計分佈模式及相應的統計參數和小砌塊建築不同方位的墻體和屋面的年溫差數據;通過現場跟蹤監測,也得到了小砌塊建築的裂縫發展規律及位移和應力的變化規律。
  5. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電工程,於2005年12月27正式投產發電,工期提前了12 . 5個月正式移交試生產,而應用p3有效控制工程是該重點工程提前並網投產的關鍵。
  6. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設工程規劃許可證和施工許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到工程建設總投資的25 %以上,並已經確定了施工和竣工交付期。
  7. Abstract : by using the correlation analysis of cotton climatic output and temperature elements of different temperature types and different length periods of time in akesu cotton region, the results obtained indicate ( 1 ) using daily temperature elements of different length periods of time correlated with cotton climatic output is more useful, more reasonable and more easily in founding out optimum temperature elements with biological significance than using ten - days temperature elements ; ( 2 ) in three temperature elements of mean temperature, maximum temperature and minimum temperature, the effect of maximum temperature on cotton climatic output is the greatest, mean temperature is greater, and minimum temperature is the least ; ( 3 ) the low temperature in later spring and summer have some limiting effects on forming cotton climatic output in akesu cotton region

    文摘:通過對阿克蘇棉區棉花氣候產量與不同長時段、不同類型溫要素的相關分析,結果表明: ( 1 )採用不同長時段的要素與棉花氣候產量行相關分析,比採用旬溫要素的工作更細致,更合理,更易找出對棉花氣候產量影響較大的有生物學意義的較佳時段和溫要素; ( 2 )在平均溫、最高溫及最低溫3個溫要素中,以最高溫對棉花氣候產量的影響最大,其次是平均溫,最低溫最小; ( 3 )春末及夏季的低溫對阿克蘇棉區的棉花氣候產量形成具有一定的制約作用。
  8. The kcrc managing board is keeping a close watch on the results of the trial operation and progress of statutory inspections before making a decision on the opening date of west rail

    九鐵管理局在決定西鐵通車期前,會密切審視測試結果及法定檢查工作的
  9. This position is in charge of the managing, editing and gathering manuscripts, and also the daily management of edit department, including soliciting manuscripts, supervision, control of magazine content and work progress and preparation for the launch of the magazine

    此崗位一半是處理編輯部的采編任務,另一半是部門常運做的管理,包括人員約稿、監督、控制雜志內容和工作以及籌備新雜志的出版。
  10. By viewing a progress line, you can quickly determine whether your project is ahead of or behind schedule

    通過查看線,可以迅速判斷項目是否超前或落後于程。
  11. The following schedule outlines due dates for reading completion

    以下表概括了應當完成閱讀的相應期。
  12. The bid / proposal packages shall be subject to the owner ' s approval and shall include unit prices, markups and credits for change work, a proposed schedule, and a firm time and date for receipt of bids / proposals

    投標/方案文件包應獲得業主批準並包括工作變更的單價、利潤和抵扣金額、建議的以及一個確切的接收投標/方案的時間和期。
  13. For some, starting a new project plan means typing up task lists in a spreadsheet file, keeping a manila folder full of the names and qualifications of team members, and tacking up calendars on an office wall to track progress and workers ' schedules

    對一些人來說,新建項目計劃意味著:在電子表格文件中輸入任務列表,在厚厚的文件夾中塞滿工作組成員的姓名和資格證明,對著辦公室墻上的歷塗塗畫畫,以及跟蹤項目和工作者的程安排。
  14. We analyzed the alternative in functional phenotypic plasticity responding to variational entironments, consequently, we interpreted the difference between endangerment and wide - distribution of these closely related species, and the results showed : 1 all of the daily changes of photosynthetic rate responding to different water status show " double apices " except m. d, the daily changes of photosynthetic rate in m. d shows " simple apices " responding to arid soil water content, while " double apices " responding to the other soil water content. emerging time of daily maxim of pn is difference between species and between treatments. daily course of transpiration and stomatal conductance of these for species all show " double apices ", but the emerging time of daily maxim of transpiration rate and stomatal conductance rate are all different between species

    結果表明: 1 、除小魚仙草外,四物種的光合速率變化在不同水分梯下均表現出「雙峰型」 ,小魚仙草的光合速率變化在於旱時表現出「單峰型」 ,其餘水分梯下表現出「雙峰型」 ,種間和梯最大光合速率出現時間有一定的差異;四物種蒸騰速率和氣孔傳導力程也表現出「雙峰型」 ,但種間最大氣孔傳導力和蒸騰速率出現的時間也存在一定的差異。
  15. To tie in with the training of shenzhen river, tdd started the river training works in the river indus basin from 1998 onwards

    配合深圳河工程的,拓展署由九八年起,陸續展開梧桐河盆地的治河工程,至今有關的主要工程竣工,為北區解決多年來的水患威脅。
  16. Indian prime minister atal bihari vajpayee paid an official visit to china from june 22 to 27. this was the first visit by an indian prime minister in a decade

    6月22至27,印總理阿塔爾?比哈里?瓦傑帕伊對中國行正式訪問,這是印總理10年來首次訪華。
  17. The production cycle is long. 3rd, the stock of manufactured and semi - manufactured goods is larger. 4th, there are lots of alteration and breakthroughs in the production course, in view of this kind of specific condition, 1st, the authority of production process plan should be ensured. 2nd, the need plan for material should be in time. 3rd, the plan of shops operation should be well - conceived. 4th, the schedule plan should be reasonable. 5th, to ensure the accuracy of monitoring information

    針對這種具體情況,所設計的小批量訂貨型生產計劃與生產監控體系在實施生產計劃與監控時做到五點: 1 、要保證生產計劃的權威性; 2 、要保證物料需求計劃的及時性; 3 、要保證車間作業計劃的周密性; 4 、要保證程計劃的合理性; 5 、要保證監控信息的準確性。
  18. At the current rate, even if discounting new buildings to be put up in future, it would take -

    按照現時,即使不計算後落成的新樓,估計也需要:
  19. X. the meeting required hgsp to conduct overall evaluation of the whole construction project and formulate really feasible construction scheduling

    十、會議要求立環球公司對整個建設工程行全面評估,制定出確實可行的建設計劃安排表。
  20. Progress lines connect tasks that are in progress or should have started to a vertical line that represents the progress date

    線可以將行中的或應該已開始的任務連接到一個代表期的垂直線上。
分享友人