更新改造 的英文怎麼說

中文拼音 [gēngxīngǎizào]
更新改造 英文
transformation and renovation of; make replacements and technical innovations; replacement and technical transformation; technical renovation and transformation
  • : 更副詞1. (更加) more; still more; even more 2. (再,又) further; still further; furthermore
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : Ⅰ動詞1 (改變) change; transform 2 (修改) revise; alter; modify 3 (改正) rectify; correct 4 ...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 更新 : renew; replace; renovate; update; renewal; angenesis; restoration; regeneration; kainogenesis; tu...
  • 改造 : transform; reform; remould; remake
  1. The transformation of value - added tax enhances the remuneration rate of investment, reduces investment risk, strengthens investment ability of enterprise fixed assets, is beneficial to the renewal and transformation of technique

    增值稅轉型提高企業固定資產投資報酬率,降低企業固定資產投資風險,加強了企業固定資產的投資能力,有利於調動企業擴大固定資產投資、加強技術更新改造的積極性。
  2. Study on renewal of gates and lifts of liuqiao sluice on tuhaihe river

    徒駭河劉橋攔河閘閘門及啟閉機更新改造研究
  3. Meanwhile, by analyzing the characteristics of hlsip ( including the newly - built and innovated projects ), it tries to explore suitable supervision model for the project and it mainly studies the quality, cost and time control of the project in different stages

    同時,在分析高揚程梯級提水灌溉工程(包括建項目和更新改造項目)建設特點的基礎上,論述了適宜於本項目建設和的監理模式,並著重研究了工程建設不同階段的質量、投資、進度控制理念及方法。
  4. The hlsip ' s newly - built projects carry out supervision system, which is favorable to improving investment environment, optimizing project design, improving the quality of projects and the project ' s adaptability to market. the innovated projects " supervision system is favorable to lowering the cost, changing the ageing of projects and bringing in advanced administration equipment and technology, enabling the projects get rid of the dilemma and step into the track of benign cicle

    高揚程梯級提水灌溉工程建項目推行監理制有利於善項目投資環境,優化工程設計,提高工程質量,使工程建成後有較強的市場適應能力;更新改造項目監理制的推行有利於降低工程運行成本,變工程原有缺陷,引進先進的管理設備和技術,使工程盡快走出困境,逐步走上良性運營之路。
  5. Reform on the skip of main inclined well in dahe coal mine

    大河礦主斜井箕斗更新改造
  6. Participate in production equipment update and alteration

    參與生產設備的更新改造工作。
  7. Retrofit of nanshan reservoir power station in chen zhou city

    嵊州市南山水庫電站更新改造
  8. Retrofitting old house with stone framed gate

    舊石庫門樓的更新改造
  9. Technological updating renovation

    技術更新改造
  10. Renewal and reconstruction funds

    更新改造基金
  11. Reinnovation of erjiang discharging sluice automatic monitoring system at gezhouba project

    葛洲壩二江泄水閘自動監測系統更新改造
  12. And this paper makes technology and economy analysis on cc - repowering

    而後,本文對聯合循環系統技術更新改造進行了技術經濟可行性分析
  13. Kone wins a major modernization order for mccarran international airport in las vegas

    通力贏得拉斯維加斯米卡蘭國際機場重點更新改造訂單
  14. The growth of the consumption demands has been suppressed by the lower wealth, the uncertain future income and future cost, the backward fundamental facilities of the countries and the slowly growing income of the peasants ; because the transformation investments grows too slowly, the propulsion of the political investments is weak, the growth of the spontaneous investments is feeble and the zeal for the foreign businessmen go to guangxi to invest is not intense, the growth of the investment demands is slow ; the great many of deficits worsen the situation of the domestic and foreign trade and cut down the demands to the products and services of guangxi seriously

    此外,還分別在消費、投資及內外貿易等方面探討了需求不足的原因。比如財富水平低、預期收入及支出的不確定性以及農村基礎設施落後及農民收入增長緩慢等,抑制了消費需求的增長;又如更新改造投資增長乏力、政策性投資帶動力不強、自主投資增長不力以及外商投資熱情不高等,抑制了投資需求的增長;再如巨大對內貿逆差惡化了內外貿易狀況,嚴重降低了對廣西產品和服務的總需求。
  15. Investment in capital construction : : capital construction refers to the new construction projects or extension projects and the related work of the enterprises, institutions or administrative units mainly for the purpose of expanding production capacity or improving project efficiency

    更新改造投資:更新改造是指企業、事業單位對原有設施進行固定資產和技術,以及相應配套的工程和有關工作(不包括在修理和維護工程) 。
  16. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    黃石?水電站輸水渠道地處地質結構比較復雜的地方,由於渠道建成投運的時間較早,且原設計的標準較低,糙率較大.在電站機組已更新改造的情況下,若不進行輸水渠道挖潛,已難于滿足電站機組的設計流量要求.經反復比較,決定採取減小渠道糙率的方案,對輸水渠道進行三面光護面加固防滲,增加過流,效果很好
  17. A point of code construction should be given the highest priority to promote the setting and completing of market system in order to guarantee the stridding development of social economics. in this thesis, based on the key action and important position of chongqing in the motion of the great development of west part, analysis is made on the social, economical and political methods about the two typical cases of " safegard developing plan of chiqikou traditional neighborhood and reconstruction planning of huguang neighborhood hotel safegarding. in the last chapter, based on the construction of regulation, we set up a brief code system for traditional neghborhood safegarding planning

    本文正是由此出發,以重慶市在西部大開發戰略中的關鍵作用及地位為出發點,將「有所作為」作為其「制度建設優先的發展之路」的基點,以制度建設理論的基本概念作為論文觀點闡述的框架,結合重慶市五十年建設歷程的回顧及目前城市歷史街區保護的現狀,並將其置於國際舊城更新改造的大背景下,再通過重慶市「磁器口傳統街區保護發展規劃」 、 「湖廣會館及東水g 』 1保護性開發建設規劃設計」兩個案例的分析,制訂一草案性質的「歷史街區保護規劃規范」 ,從制度建設角度將歷史街區保護的行為納入規范化的框架內,以實現制度建設對社會經濟發履的巨大推動作用。
  18. The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine, and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan, by working out plan, following up the construction and timely error correcting management to make sure the achievement of project ' s task time

    建項目的施工進度控制的關鍵是要合理地確定項目總控制工期和階段性控制工期,並將其分解落實到進度計劃中,以實現工程及早投運、及早發揮效益的目標;更新改造項目的進度控制則要以進度計劃的落實不影響工程的年度灌溉計劃為目標,採取合理制定計劃、跟蹤施工、及時糾編的管理辦法,確保項目工期目標的實現
  19. At present, the upgade and transforming of centre district has one - sidedness, short - term quality and upgrade way have the problem that it is very big even

    目前,城市中心區的更新改造存在片面性、短期性,而且方式也存在很大的問題。
  20. The results of site measurements give evidence that the numerically - controlled processed pump blades satisfy the requirements of designed characteristics

    並介紹在江蘇省江都第一抽水站更新改造工程中成功應用的實例,現場實測結果表明數控加工的葉片能夠保證水泵設計性能。
分享友人