最大坡度 的英文怎麼說

中文拼音 [zuì]
最大坡度 英文
limiting grade
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. The results showed that the density and coverage of shrubs growing in the intervale of sand fixing region were biggest, but those of herbs were smallest. in contrast, the density and coverage of shrubs growing in the lee slope of dune were smallest, but those of herbs were biggest

    不同地形條件下,丘間低地灌木植物密、蓋,草本植物的密和蓋小;背風灌木植物密、蓋小,而草本植物的密、蓋
  2. Chemical fume hoods shall be of air foil design with 45 degree sloped sections on the sides and top of the hood opening to insure maximum containment and minimum eddying of air currents

    化學通風櫃應採用風道設計,側面成45,罩頂開口,以確保抽氣量、空氣渦流小。
  3. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆破整地工程的地穩定性與降水、地形等因子的相互關系,應用數量化理論,對在有充分降水條件下的低山丘陵區的爆破整地工程損失程與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降水和日降雨量是引起爆破整地工程損失的激發因素;影響爆破整地工程穩定性的主要地形因子是地面,其次為位、向,實施爆破整地工程的地面以不超過25為宜。
  4. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工難的「爛洞子」 。
  5. 3. the great bustard is big - sized bird that build nest on the ground and the nests distribute in sparse group. most of their nests locate on the middle slope of hillocks, especially on the southern middle slopes towards to the sun, the biggest gradient is not more than 8 ?, the most important 3 factors that determine nest - site selection are height of plant. density and thickness of hay. 4

    鴇是營地面鬆散型群巢的型鳥類,多將巢築在海拔190 230m的草原崗腰上,且以偏南向的朝陽緩腰上為多,最大坡度不超過8 ,植被高、密和枯草厚是決定其巢位選擇的3個重要的因素。
  6. On basis of fractal theory and the principle of fractional brownian motion, this paper puts emphasis on the following parts : firstly, the determination of fractal non - scale range on calculate fractional dimension is discussed, which adopts method associated artificial cognition with track decision. secondly, primeval data are segmented into blocks to evaluate their sub - fractional dimensions. in this process, the maximal value of sub - fractional dimensions in different directions is prioritized

    本文利用分形幾何理論與分形布朗運動原理,重點研究和分析了以下的幾個問題:分形維數計算時無標區的確定,使用了人工法與軌跡法相結合的方法;對原始數據進行分塊分別計算其子分形維數,考慮了實際地形特徵的方向性,計算得到的子維數為局部的最大坡度方向上的方向維數;改進了傳統的隨機中點移位( rmd )內插技術,使用不同的插值比系數進行插值。
  7. The structures and dynamic changes of the artifical sand - fixing vegetation were studied based on the follow views : components of vegetation community, plant diversity, life - forms of vegetation, trends of plant growth, characteristics of the vertical and horizontal structure of vegetation, relationship between the vegetation community and environment ( including soil moisture temperature etc. ), relationship between the vegetation community and characteristics of plant physiological activities. some results were showed as follow : 1. components, diversity and life style of artificial vegetation in shapotou region the marked changes of artificial vegetation have taken place during more than 40 years, since the establishment of sand - fixing vegetation

    本文以騰格里沙漠東南緣寧夏中衛縣沙頭地區人工固沙植被作為研究對象,採用傳統生態學的野外調查方法,從植被群落的組成、多樣性、生活型、群落生長動態、垂直結構特徵、水平結構特徵、群落結構與周圍環境(土壤含水量、溫)相互關系及其與植物自身生理生態適應特徵關系等多個角研究了人工植被群落的結構及其動態變化,取得了如下研究結果: 1 、植被群落組成、多樣性及生活型:沙頭地區人工植被經過近50年的演變,從流動沙丘到固定沙地,沙地植被的動態變化經歷了從人工植被到人工?自然植被的轉變,從人工植被建立初期的少數幾種引種植物到現有30多種植物,隨著固定沙地時間的延長,植物種類日趨豐富,並且人工植被在15 25年、 40 50年兩個階段,物種的周轉速率,即群落結構變化
  8. The synchronous rectifying and low power sampling technology is used to reduce the power consumption, flexible external loop compensation, error amplifier output clamp are adopted for better system large signal response. the piecewise slope compensation technology is employed to minimize the consequence of over compensation. the sensor resistor is externally connected, which realize output voltage programmable. the overheat protection and under voltage protection modules are integrated in the die to allow the reliable operation of the system

    同時,電路設計採用同步整流技術、低功耗電流采樣技術降低功耗,提高轉換效率;採用靈活的外部環路補償技術、誤差放器輸出嵌位技術以實現良好信號特性;採用分段斜補償技術,消除不穩定因素,並地減小過補償帶來的問題;採用外接輸出采樣電阻的方式,實現輸出電壓的可編程。
  9. The thought of slope safety and landslide prevention based on risk management processes is discussed from the risk factors identification, risk assessment, risk control, and risk prevention measures of the landslide in this paper, and it is pointed out that the risk management technique is a efficient method, which helps manager to cope with the possible risk preparedly and rationally and to adopt measures to reduce the risk in a maximum limit and finally to avoid and reduce the loss of property finally

    從滑的風險因素識別、風險評價、風險控制、滑風險防範措施等風險管理流程入手,對基於風險管理技術的邊安全與滑預防思想進行了論述,指出應用風險管理技術是幫助管理者有準備地、理性地面對所可能遇見的風險,並採取措施地減少風險,終減少或避免財產損失和人員傷亡的預防手段。
  10. Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt

    通過本文的研究成果,根據區域性地貌的演化特徵,我們可以致地對現今地應力場進行判斷:在分級卸荷條件下,巖體中彈性變形的恢復具有明顯的規律性,這種規律對于研究地應力場的演變是有幫助的;地應力場中主應力方向與區域構造形跡在近的構造運動中所受區域性擠壓應力的方向無明顯的對應性;區域性地貌形態的演化程對現今地應力場的特徵具明顯的影響,隨著區域性地貌侵蝕程由峽谷區、丘陵區、平原區的變化,現今地應力場特徵由自重應力場、水平應力場為主含少量自重應力場特徵向水平應力場的規律變化;在峽谷區,山體中具有兩個應力帶:自重應力帶和卸荷應力帶,主應力方向在卸荷應力帶中近平行於面並傾向于河谷、在自重應力帶中近於直立;根據原始地面遭剝蝕的程,可以致地估算主應力和中間主應力的量值和方向;在丘陵區和平原區,主應力的方向近於水平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程,可以致估算其主應力的量值;根據區域性地貌形態的特徵來分析工程區的現今地應力場特徵,並進而致了解巖石的應力環境,這種分析方法得出的結論與許多實際的地應力測試成果基本一致,對于型水電工程地下廠房和壓力隧洞的設計是有所幫助的。
  11. In order to develop a new ev fast, low cost, high technology and according with the acquirement of the market, choose advanced vehicle simulation by computer is a good way. in this dissertation, advisor as a simulator, be used to simulate a new kind ev - xl2000. in this dissertation, the author analyzed the technology of the ev, and founded the mathematics models of xl2000 with the battery, motor and the automobile, to simulate the dynamic property of xl2000

    本文在對電動汽車相關技術進行了綜合分析的基礎上,根據xl2000純電動汽車的特點,對動力電池、異步電機和整車受力情況建立了數學模型,主要對整車的動力性進行模擬,設定以下幾項計算任務:工況行駛和續駛里程計算、高車速、計算和加速性能等,在學習advisor軟體的基礎上進行了開發,建立了xl2000型電動汽車的模型,並進行了動力性的計算。
  12. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行邊的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,面頂部水平向加速峰值;綜合考慮,可認為該邊的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放作用,研究剖面的面,水平向加速及位移在地形相對高差45米左右,而後隨相對高差的增高而減小,相對高差為100米時,水平向位移及加速絕對值均腳; ( 3 )強迫振動段,水平向加速值隨時間變化的規律為:頂節點總的變化趨勢是越來越,而體中部節點的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為頂表面滑塌型。
  13. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土隨著角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長方向上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘橫向抗剪抗彎作用的發揮程和土釘釘頭的連接方式有關,但作用不,實際設計時可以忽略其影響; ( 5 )隨著體的開挖,第一排土釘的軸力變化不,其它土釘的軸力都穩步增加。
  14. The article generalizes the successful factors of yuanrong limited company in the last few years. on the basis of analyzing the shipping market and quantitative prediction, the paper discusses container ship ' s chartering and company ' s operation and management. the article also shows light on how to promote container ship ' s business in the future and comes up with some reasonable strategies

    本文結合連航運集團新加遠榮控股有限公司幾年來的成功經驗,在分析公司所處的市場環境及集裝箱運量預測的基礎上,著重從公司集裝箱船舶期租和集裝箱船舶運輸的經營和管理兩方面入手,探討了公司今後的在集裝箱船舶業務方面的發展戰略,為作為投資集裝箱船舶進行期租經營或運輸經營的中國船公司或航運企業如何降低運作成本追求的利潤回報以及如何從戰略的角從事集裝箱船舶經營提供參考。
  15. Then, taking into account the effect of the compression of the approach roadway and the differential slope of the bridge slab, the author analyzes the dynamic response of man - vehicle - road system when the vehicle approaches and leaves the bridge by means of laplace transform, the curve of man ' s acceleration versus time, the vertical force between the vehicle and road versus time, the man ' s maximum transient vibration value and the maximum force between the vehicle and road are got, and the program about the calculating progress above are edited. based on the analysis above, the influence on the maximum transient vibration value of some parameters about the vehicle and road such as the movement direction and speed and weight of the vehicle, the differential slope of the bridge slab and the length of the approach slab, are studied, and some conclusion are given

    分上橋和下橋兩種情況,考慮車路耦合和橋面沉降差的影響,對車輛通過設和不設搭板的路橋過渡段時「人?車?路」系統的相互作用用拉普拉斯變換法進行了動力響應分析,得到了人的加速及路面對車的垂直作用力隨時間的變化曲線、人的加速瞬態振動值和路面對車的作用力,分析了車輛的行進方向、速和載重,橋面沉降差和搭板長等車和路各參數對計算結果的影響,並編制了相應的計算程序。
  16. On the other hand for four main vegetation typies, which are picea crassifolia, forests sabina przewalskii forests, bushes and pastureland, whose soil permeability function was analyzed from angle of its physics, capacity of water, storing water in it. the results show as follow : permeability function of soil is controlled by quality of soil hole. the quality and quantity of soil hole under picea crassifolia forests are the best, and the permeability also is the best

    另外,從土壤物理性質、蓄水量、貯水量等角對祁連山苔蘚雲杉林、祁連圓柏林、亞高山灌叢林、牧草地4種主要植被類型的土壤滲透功能進行分析,結果表明:土壤的滲透功能主要由土壤非毛管孔隙的質和量決定的,苔蘚雲杉林土壤非毛管孔隙的質和量好,它的滲透也好;雖然亞高山灌叢林的滲透功能次之,但由於它所處的位置和面積,現實貯水量在祁連山四種主要植被類型中
  17. Through analyzing bed ' s response to wave, in the condition that super - stratum is more hard and second - stratum is more soft in region of interest, super static interstitial hydraulic pressure amplitude die away rapidly between stratums, before in sight of boundary between hard and soft stratum, plane effective pressure increase to max. shear stress reach peak value when bed thickness is approximately 2. 7 meters, then it will decrease to the minimum on the place where the flexible soil has a common boundary with the rigidity, so the boundary is the most destroy plane on engineering. on the basis of reconnaissance in situ, in normal situation of sea, the structure slides to the basin along the boundary

    通過對底床在波浪下的響應分析,對于研究區底床上層較硬而第二層較軟的情況,超靜孔隙水壓力幅值在層間交界處迅速衰減,在臨近硬、軟地層交界處前,水平有效應力增至,剪切應力在底床厚約2 . 7米左右達到峰值,然後減小,到硬、軟層土交界位置,達到小,因此這個界面就是容易發生破壞的工程軟弱面,現場勘查證明,即使在正常海況下,構築物也會沿以此交界面為滑動面,緩慢向「盆」底滑動。
  18. The optimal furrow pit direction and the optimal slope configuration fit to the little north open mining was obtained

    優化設計所取得的邊形狀為金堆城露天礦的減少廢石剝離量,指導采區安全生產提供了幫助。
  19. Each suite has independent flower balcony, good line of sight and sunshine corridors, and all of them are tropical garden design. the whole building emphasizes the detailed treatment, and makes the design classically. using natural materials and making the best use of the grass, trees, mountain and water scenery, etc, you must be intoxicated with happiness

    整個酒店強調細部的處理,使設計意圖趨向經典取材以天然材質為主在新加設計師的精心雕琢下,成功將花草樹木山色水景陽光雨霞引入室內,室內外游泳池酒吧健身房桑拿按摩購物茶吧等一應俱全,可全方位體驗假休閑旅遊的時尚生活。
  20. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑體長550 800m ,寬260 350m ,210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。
分享友人