最大工作負荷 的英文怎麼說

中文拼音 [zuìgōngzuò]
最大工作負荷 英文
maximum working load
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 負荷 : [電學] load; charge; weight
  1. Actually, just in short time can refrigeration systems work in the biggest burthen

    實際上,製冷系統只是短時間
  2. Notice that performance is typically best at moderate workload levels, and worst at both very low and very high levels of workload

    總之,中等下的管制質量高,在低和時,質量差。
  3. On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully

    高壓斷路器所造成的事故無論是在次數,還是在事故所造成的停電時間上都占據總量60以上。因此,及時了解斷路器的狀態對提高供電可靠性有決定性意義;並可以減少盲目定期檢修帶來的資金浪費。本文論述了斷路器機械特性參數監測方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性監視和二次迴路保護結合起來,給出具有完整性監視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器額定短路電流分斷次數,計算每次分閘對應的觸頭電壽命損耗,預測觸頭電壽命;提出根據斷路器殼體溫度和斷路器周圍空氣溫度結合斷路器熱阻來計算斷路器主觸頭穩態溫升的方法,並根據此時的電流間接計算主觸頭迴路的電阻;在硬體電路設計上,採用美國ti公司新推出的一種功能強的單片機msp430 ,並充分考慮該晶元的適用電壓范圍給設計帶來的特殊問題;在通信模塊的設計中,解決了不同電壓晶元之間的介面問題,並給出了直接聯接的接線方案。
  4. Now if we suppose that the rated temperature limit of any chip were identical, confining the highest temperature in the rated limit is the most important, for this purpose i apply the principle of annealing algorithm to the optimization of place distribution design. under the unvaried condition of thermal dispersion, we can get the least temperature of the maximum value in some kind of chip array

    為了使得電子元件溫度在特定散熱狀態下達到低(低於額定的高溫度值) ,我們將模擬退火演算法的優化設計思想應用到電子元件陣列的布局優化中,使得在不改變外部散熱條件的情況下,僅僅通過電子元件位置分佈的改變就取得降低其溫度的效果。
  5. Maximum working load

    最大工作負荷kg
  6. The scale, facility, setup mode and the topper application are increasing, but the network management system still adopts a centralizing structure based on manager / agent model. in the centralizing structure, the network management system can ’ t change with the scale and complexity, which made the system bigger and bigger. all management logic is computing in one workstation, that will occupy too many bandwidth, depress performance and made the workstation become the weakest part, if the workstation overrun or dead, agent can ’ t come back because it must wait manager ’ s command

    目前,我國電信網路正處于高速發展中,網路的規模越來越,設備種類越來越多,組網方式越來越多樣化,應用越來越復雜,但是網路管理系統仍然普遍採用管理員/代理的集中式管理方法,在集中式網路管理模式中,網管系統不能隨著網路規模和復雜度的變化而變化,致使網管系統越來越龐;網路管理邏輯全部集中在一個管理站中計算,需要佔用量的帶寬來傳輸設備數據,有效性差,同時管理站是系統中脆弱的部分,一旦管理方超或死機,代理方因為必須等待管理方的指令而無法恢復系統,導致系統崩潰。
  7. 3 days prior before any heavy ( 75 % of the max. allowed working load ), duel, or long radius lift or a lift in close proximity to power lines a detailed job safety analysis ( jsa ) must be submitted to the construction manager or his nominee

    在進行重物(提升的75 % ) 、採用2臺起重機同時進行起重提升,或在起重機距離貨物較遠,或距離動力線較近的地方進行提升時,必須提前3天向現場施經理或其指定人遞交一份詳細業安全分析報告。
分享友人