最大張力 的英文怎麼說

中文拼音 [zuìzhāng]
最大張力 英文
maximal tension
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ動詞1 [書面語] (給弓或樂器上弦) fix (a bowstring); string (a musical instrument) 2 (分開;...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Mr. deng handed over the bill of exchange for initial beneficence of 3 million rmb to mr. fan, mutually, mr. fan presented mr. deng with a crystal dado charity on which theres two strong chinese characters of charity which was the copy of the handwriting of mr. zhaopuchu, the former president of buddhism association. at last, mr. zhangmeizhong presented mr. fan and mr. su with the handwriting and painting works of his own and mr. yangtaiyang, a man over 100 years old

    董事長向范會長遞交了「陽光專項資金」首期投入人民幣300萬元的匯票范會長向董事長回贈了一尊水晶臺座,水晶臺座上「慈善」兩個字遒勁有,出自佛學家趙樸初先生的手筆後,美中先生向范蘇兩位會長贈送了百歲老人陽太陽和他自己的書畫作品。
  2. The third part, the " ii " part of the dissertation - - - - - - the major historical challenges for the u. s. federal constitution, surveys the four major challenges that the constitution experienced : ( i ) the initial formation of the u. s. constitutional system ; ( ii ) the most dangerous constitutional crisis - - - - - - the civil war : ( iii ) the absorption the biggest new element in constitutional system - - - - - - party politics ; ( iv ) the modern challenge - - - - - - the expansion of the power of the federal government and the inflation of the presidential power

    第三部分即文章的「二、美國《聯邦憲法》所經歷的重歷史考驗」 ,對《聯邦憲法》在其歷史中所經受的四歷史考驗分別進行了考察: (一)美國憲政制度的初定形, (二)的憲政危機? ? 「內戰」 , (三)新的憲政要素的吸吶? ?政黨政治, (四)現代挑戰? ?聯邦政府權的擴和總統權的膨脹。
  3. I did my best, if with increasingly frayed nerves.

    我盡了的努,雖然神經越來越緊
  4. Ltd. ( jczc ) is one of jotun a / s 100 % subsidiary in china. it is established in 2004 april, has a 70000 square meters factory in zjg with the annual production capability more than 50 million liters, being the biggest and one of the most advanced coatings manufacturers in china

    其位於江蘇家港市的塗料生產基地總投資額超過3000萬美元,佔地面積達70000平方米,年生產能5000萬升並設有區域研發中心,是目前國內先進的塗料生產廠之一。
  5. Therefore, the prestress of the cable should make sure that the cable is in the tight state in the entire process. the largest wind load which the prestressed cable truss can undertake is studied emphatically in the article

    因此,索中初始預應應能保證索在工作的全過程中始終處于緊狀態,以此為條件,本文重點研究了預應索桁架所能承受的風荷載值。
  6. About feeding thick material flush ioint machine, usee five connecting rods to be possible to adjust about thickness the compound feeding, to swollens the wseam material and dives moves the natural big especially thick material and the thin material, can enable the lower level in the tailoring process the feeding quantity to achieve consistently ; uses turns on lathe the shuttle greatly, the raduction trades the agent number of times, most major characteristic thickness dual purpose, enhances the working efficiency, uses the completely automatic lubricating arrangement, enhances the machine service life

    0388系列上下送厚料平縫機使用五連桿可調整厚薄上下復合送料,對膨體類縫料和潛移性較特厚料和溥料,在縫紉過程中能使上下層的送料量達到一致;採用旋梭,減少換底線次數,特點針線小;縫紉厚度能,縫紉薄料性能優良。
  7. Then, it considers the staging of frank ' s trial, conviction, death penalty, commuted sentence and final lynching, each phase of the case presented as public spectacle

    本文認為,舞臺上的法蘭克案從裁決、定讞、死刑、減刑到後私刑,每一步驟都充滿吸引眾觀看的戲劇
  8. Based on the analysis of designed cad graphics and the given parameters, computer can convert the cad graphics to a acdbpolyline which can simulate the routine of the conveyor chain. then by using the method of point - by - point strain calculation, computer could figure out each point ’ s strain of the chains under different load states, and get the results such as strain ’ s maximal and the minimal values and their positions, weight of the strain equipment and power of the drive electric - machinery that the conveyor need

    通過對設計的cad圖形和給定參數的分析,將輸送鏈運行軌跡轉化為一條可模擬輸送鏈軌跡的多義線,然後用逐點計演算法動態地計算出各種加載狀態下輸送鏈上各點的受,得出小受點的小和位置,拉緊裝置的重量,驅動電機所需的功率等結果。
  9. The jiangkou hydropower station that is now under construction is the largest hydropower project on the main stream of the furong river. it ' s the most important electricity energe source of chongqing in the 21 century and it also be the main project of the big develop of western

    江口水電站是重慶21世紀重要電能源供應基地,是西部開發的一項骨幹工程,也是烏江支流之一的芙蓉江幹流上的在建水電工程,目前該工程正在緊的施工之中。
  10. It comes to a conclusion that the combined parabola acceleration is the optimum one to limit dynamic tension and elastic vibration of large belt conveyors during starting

    提出了採用拋物線組合加速度控制曲線起動是限制型帶式輸送機動和彈性振動的佳方案。
  11. When this happens, a surge of blood is pushed through the blood vessels, which lead from the heart to the rest of the body. the peak pressure as the heart contracts is called the systolic blood pressure, and the lower pressure when the heart relaxes is called the diastolic blood pressure

    當心臟收縮時,壓便會使血液沿著血管從心臟走向身體各部份。心臟收縮時的壓點稱為收縮期血壓,而當心臟肌肉鬆弛時,血壓會變得較低,稱為舒期血壓。
  12. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應量值明顯增高,同時左岸的區的范圍及量值明顯減小,主應的方向依然與模型的底邊界垂直;壩建成后逐漸蓄水階段以及同時考慮本區強地震的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區地震的共同作用,壩體將在滑坡體下滑推的作用下產生破壞;建壩后水平推對右岸古滑坡體穩定性的影響分析可以看出,在危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理學參數的降低而有可能導致壩體失穩破壞。
  13. Through the research of the tension in vivo, the immediate retraction rate and histology examination about the different ways and different maintaining, we get : the increase area of the rapid and conventional expansion has little difference with the expanded time ; however it has significant difference with the maintaining time. it shows that shortening the expanded time is feasible in clinic, but shortening the maintaining time is out of the question ; after the capsule is removed, immediate retraction rate of the expanded skin notably decreased, significantly different from those with intact capsule ; the collagen content of the rapid expansion is just the same as the conventional expansion, but the changes of the histology dependences on the maintaining time. comparison with conventional expansion, rapid expansion has no significant drawback ; maintaining a period after expansion can greatly increase the area of expanded skin and reduce immediate retraction

    通過對不同擴期、不同方式和不同維持期對擴皮膚的在體、即時回縮和皮膚組織學的研究,得到:快速擴和常規擴後獲取的皮瓣,面北京工業學工學博士學位論文一積增加差別不;擴皮膚的面積增加和下降與維持期的長短有關;而與擴期的長短關系不,說明在皮膚擴術中可以縮短注水時間,但是維持時間不能縮短;擴皮膚去除包膜后的即時回縮率下降,與未去除包膜的相比較有明顯差異;快速擴皮膚的膠原含量變化與常規擴的基本一致,擴皮膚的組織學變化與維持期的關系較為密切,與擴方式關系不;快速擴和常規擴相比,快速擴沒有明顯的破壞作用;擴結束后,維持一段時間,能有效的提高擴面積且能有效地減少回縮。
  14. The checking methods of prestressed concrete penstock during construction stage are suggested. the formula is proposed to calculate the maximum distance of two consecutive strands to be result in uniformly distribution of concrete prestressed along the penstock

    提出了相鄰環預應筋束的間距計算公式,確定了以混凝土抗裂為目標進行預應筋束分步拉施工與荷載控制的方法。
  15. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后預應隧洞.通過量的調研、試驗、分析論證,在施工前確定該預應方案選用無粘結預應系統,成為目前世界上規模的無粘結預應隧洞襯砌工程,在國內尚屬首例
  16. Maximum spreading force

  17. This paper covers key problems in design of the chain conveyor with trolleys being able to travel back automatically and vertically and their spacing adjustable, including chain tension calculation, trolley passing ability and interference when traveling back automatically and vertically, rail slope, etc

    摘要對臺車間距可調及自動垂直返回鏈式輸送機設計中的關鍵計算,如牽引鏈條最大張力計算、臺車垂直自動返回的通過性及干涉性、坡降曲線、前臺車滑塊裝置行程計算等作了細致分析並導出了公式。
  18. Lampo is an affirmation and inspiration in the strain of work. it brings self - confidence and hope. it can make us do the best, and experience the real meaning of success

    Lampo是緊工作中的肯定與激勵;它帶給人充滿自信與希望的感覺,喚出自己量,做到好,讓人體驗到「追求成功」的真正意義。
  19. The mechanical fastening of the pressure sensor does not require any additional strain relief as the construction of the cable is suitable to take a maximum tensile force of 1000 n. an additional weight can be screw - fitted to increase the actual weight of the sensor

    固定壓傳感器不需要任何額外的緩解,因為電纜的結構能夠承載最大張力達1000n 。通過螺栓可以固定額外重物來增加傳感器的重量。
  20. The mechanical fastening of the pressure sensor does not require any additional strain relief, as the construction of the cable is suitable to take a maximum tensile force of 1000 n. an additional weight can be screw - fitted to increase the actual weight of the sensor

    固定壓傳感器不需要任何額外的緩解,因為電纜的結構能夠承載最大張力達1000n 。通過螺栓可以固定額外重物來增加傳感器的重量。
分享友人