最大裝載量 的英文怎麼說
中文拼音 [zuìdàzhuāngzǎiliáng]
最大裝載量
英文
maximum loading- 最 : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
-
The weight gain of powders could be slightly increased with the increasing ph value, formaldehyde dosage and powder loadage, but the most utilization ratio of silver was only 35. 2 percent. the composite powders with the silver content between 13 % ~ 70 % were produced
盡管提高ph值、甲醛量及粉體的裝載量能在一定程度上增加化學鍍后粉體增重即銀的析出量,但遠低於理論析出值,銀的最大利用率僅為35 . 2 。Through developing the comprehensive experiment device with large - scale drum strength and stability, the stress - measuring experiments of various wall thickness of the normal drums of the cranes were performed. the law that the stress of the drums along the circumference and along the axis changes with the load increase of the wire ropes was studies for the first time
通過研製全比尺大型捲筒強度、穩定性綜合試驗裝置,對起重機常用規格的捲筒進行了各種壁厚條件下的應力測量試驗,首次對捲筒體周向和軸向應力隨鋼絲繩逐步加載過程變化的規律進行了研究,發現最大應力產生在鋼絲繩繞過后3 ~ 5圈截面處,該現象與理論分析結果也是符合的。Small craft - maximum load capacity
小艇最大裝載量Weight of workpiece kg
最大裝載量kgMax load kg
最大裝載量kgWith globalization the performance of ocean ships served for international business is becoming larger. today the maximal volume of a container vessel has been even 8000teu and the loading capacity of a bulk cargo ship could be up to 400, 000 ton
隨著全球經濟一體化的不斷發展,服務于國際貿易的遠洋船舶單體載重能力也日益增大,目前最大的集裝箱船的載箱量已達8000teu ,最大的散貨船舶載重量已達40萬噸。Based on the analysis of designed cad graphics and the given parameters, computer can convert the cad graphics to a acdbpolyline which can simulate the routine of the conveyor chain. then by using the method of point - by - point strain calculation, computer could figure out each point ’ s strain of the chains under different load states, and get the results such as strain ’ s maximal and the minimal values and their positions, weight of the strain equipment and power of the drive electric - machinery that the conveyor need
通過對設計的cad圖形和給定參數的分析,將輸送鏈運行軌跡轉化為一條可模擬輸送鏈軌跡的多義線,然後用逐點張力計演算法動態地計算出各種加載狀態下輸送鏈上各點的受力,得出最大、最小受力點的力的大小和位置,拉緊裝置的重量,驅動電機所需的功率等結果。In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges
本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。A part can be located rapidly in a huge assembly tree by its attribute information, thus the part can be edited in design context. at last, author develops a set of tool with ug / open application programming interfaces and menu tools. using the tool, visible parts in a view can be selected automatically and invisible parts can be blanked or closed automatically according to user ' s requirement
快速操縱大裝配,利用組件過濾器和控制開關快速打開大裝配,減少大裝配的打開時間;利用組件的屬性信息操縱大裝配樹,快速定位查找裝配體中某一組件以便在裝配的上下文中編輯組件,修改組件的設計;最後利用ug的介面函數和菜單定義工具二次開發實現了大裝配體在某一視圖中可見組件的自動選取,自動隱藏或關閉不可見組件,減少了內存中加載組件的數量,能在某一視圖中快速操縱大裝配。This paper sets up the concept of the proportion of unloading and the relative proportion of unloading, sets up a mathematical pattern for the using of the packing materials on the base of the relative proportion of unloading. meanwhile we can design the packing dimension of the compressive wood piece, and it points out that per unit loading of the track pattern packing plan is the largest. the proportion of per loading has increased by 116. 6 % over that not compressing, and 30. 64 % over cylinder packing
本文建立了空裝率和相對空裝率的概念,並利用相對空裝率,對包裝物的材料利用程度建立了一種數學模型,提出了計算方法,同時據此設計木片壓實裝袋打包尺寸,指出跑道形包裝方案的單位裝載量最大,與未壓縮裝袋相比提高單位裝載率116 . 62 ,與長方體裝袋相比提高單位裝載率30 . 64 ,並可以充分利用c60火車的額定運載能力。Earth - moving machinery - loaders and backhoe loaders - test method for measuring breakout forces and lift capacity to maximum lift height
土方機械.裝載機和挖掘機.測量脫開力和達到最大提升高度的提升能力的試驗方法In accordance with new standards for cockpit security promulgated by the international civil aviation organisation, cad issued a flight operations notice in august 2002 requiring all hong kong registered passenger aircraft with a maximum certified take - off mass in excess of 45 500 kg or with a passenger seating capacity greater than 60 to be equipped with an approved flight - crew compartment door of a reinforced standard, including a surveillance system, by 1 november 2003
民航處於2002年8月根據國際民航組織新的駕駛艙保安標準發出了飛行運作通告,要求由2003年11月1日起,所有在香港登記的定翼飛機,如其最大審訂起飛質量超過45500千克或批準載客數量超過60人,必須裝備配有批準的監視系統及已加固的駕駛艙艙門。Earth - moving machinery - loaders and backhoe loaders - part 2 : test method for measuring breakout forces and lift capacity to maximum lift height
土方機械.裝載機和反向裝載機.第2部分:測量設備的斷開力和設備最大提升高度時提升能力的試驗方法Equip along with the weapon continuously creative, the sharp weapon also raises continuously in the quantity and the request on the quantities, processing to produce the mode and productions to process the production request that the equipments have already ca n ' t satisfy the long sail company originally possessed. through the common consultation of the company leadership and all employee, decide to throw in the capital, carry on to the company to reform completely, expand the scale, lead quantity and quantities that controls the production line to raise the production into the number, thus satisfy the competition ability that the productivity request combines to raise the business enterprise continuously. this thesis mainly what to study is the long spring aviation liquid to press to control the limited company number to control the degree of progress that the production line installs the item excellent turn, pass to use the item management of theories resolve the problem within actual application
長春航空液壓控制有限公司前身是中國航空第二集團下屬第133廠,是一個為飛機配套機載設備的軍工企業,成立於1998年,隨著我軍裝備事業的不斷發展,對武器裝備的需要也越來越迫切,大批量的高精尖武器裝備已經成為打贏高科技精裝備條件下局部戰爭的法寶,因此長春航空液壓控制有限公司針對這一嚴峻形勢,果斷地提出利用項目管理的知識體系,引進數控生產線項目,在保證企業正常生產和安裝質量的前提下,縮短工期,節約成本並通過項目管理知識體系的運用,用系統的管理知識,提高管理效率、管理水平,並運用到其他的項目中,從而最終提高企業的生產力和競爭力。Tray - type cable support systems are ideal cable laying devices most broadly applied in petrolum industry, chemical industry, power and light industries. television and telecommunication, it is featured by such advantages as small weight, great loading capacity. good - looking shape, simple structure. convenient erection. quick heat dissipation and fine permeability
托盤式橋架是石油、化工、電力、電視電訊等方面最廣泛應用的敷設裝置,它具有重量輕,載荷大、造型美觀、結構簡單、安裝方便、散熱透氣性好等優點,既適用於動力電纜的安裝,也適用於控制電纜的敷設。The quantity that a container or apparatus can hold
最大容量集裝箱或容器的裝載容量分享友人