最完完成日期 的英文怎麼說
中文拼音 [zuìwánwánchéngrìqī]
最完完成日期
英文
late finish date-lf- 最 : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
- 成 : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
- 日 : Ⅰ名詞1 (太陽) sun 2 (白天) daytime; day 3 (一晝夜; 天) day 4 (泛指某一段時間) time 5 (日...
- 期 : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
- 日期 : date
-
After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and supervision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seven ) days in advance and thereafter commissioning shall be carried out as soon as possible
在成功完成按本章節中的第74條所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附件三中的時間表對設備進行初次運作,而上述時間表(所規定的日期)應經雙方調整並提前7天確定.而其後的試產應盡快執行This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed
論文分析了配電變壓器的負載特點;提出採用周期自回歸模型預測配電站用電日負荷,根據負荷預測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝置的研製。After pasting marbles, it is better to wipe seam on that day to avoid fine sands and filths filled up the seam because of delayed time, and you could not deal well
地坪及車道施工時機最好能在打底完后隔日或短期內貼好,貼完后最好當日抹縫,以免時間拖長造成細沙穢物填入細縫,不好處理。The survey should be completed on the same day or at most within a couple of days. it is important that a comprehensive and accurate survey is conducted to prevent and deter " imposters " from taking up residence in the project area afterwards and abusing the rehousing scheme
市建局會在項目的開始實施日期進行凍結人口調查,以確定受影響人士領取特惠津貼和獲得安置的資格。這項調查應于當日或最多數日內完成,並必須全面而準確,以免有假冒居民魚目混珠,入住重建區,濫用安置資源。Applications to drop courses must be completed no later than december 31st during the first semester or may 31st during the second semester
二、學生申請停修課程,最遲應于上學期十二月三十一日前、下學期五月三十一日前完成申請之手續。The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project
兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ( ssds ) stage i and expressed concern on the consequential delay in completion of the project
兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。Article 6 as to a equity - settled share - based payment in return for employee services, if the right cannot be exercised until the vesting period comes to an end or until the prescribed performance conditions are met, then on each balance sheet date within the vesting period, the services obtained in the current period shall, based on the best estimate of the number of vested equity instruments, be included in the relevant costs or expenses and the capital reserves at the fair value of the equities instruments on the date of the grant
第六條完成等待期內的服務或達到規定業績條件才可行權的換取職工服務的以權益結算的股份支付,在等待期內的每個資產負債表日,應當以對可行權權益工具數量的最佳估計為基礎,按照權益工具授予日的公允價值,將當期取得的服務計入相關成本或費用和資本公積。Of the respective completion dates for these two projects according to the latest estimates, as well as the respective periods of early completion and slippage as compared to the original scheduled completion dates
上述兩項工程的最新預計完成日期為何,分別較原來預算完成日期提前及延誤了多久提前完成及延誤落成的原因分別為何及Displays scheduling information, including start and finish dates, late start and finish dates, free slack, and total slack
顯示日程排定信息,包括開始日期、完成日期、最遲開始日期、最遲完成日期、可用時差和總時差。Article 12 as to a cash - settled share - based payment, if the right may not be exercised until the vesting period comes to an end or until the specified performance conditions are met, on each balance sheet date within the vesting period, the services obtained in the current period shall, based on the best estimate of the information about the exercisable right, be included in the relevant costs or expenses and the corresponding liabilities at the fair value of the liability undertaken by the enterprise
第十二條完成等待期內的服務或達到規定業績條件以後才可行權的以現金結算的股份支付,在等待期內的每個資產負債表日,應當以對可行權情況的最佳估計為基礎,按照企業承擔負債的公允價值金額,將當期取得的服務計入成本或費用和相應的負債。Earliest due date
最早訂單完成日期Used in conjunction with microsoft project ' s other pert analysis features to evaluate the best - case duration, start date, and finish date of a task
與microsoftproject的pert分析功能聯合使用,可以估計某項任務在最佳狀況下的工期、開始日期和完成日期。Used in conjunction with microsoft project ' s other pert analysis features to evaluate the worst - case duration, start date, and finish date of a task
與microsoftproject的pert分析功能聯合使用,可以估計某項任務在最壞狀況下的工期、開始日期和完成日期。After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and superision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seen ) days in adance and thereafter commissioning shall be carried out as soon as possible
在成功完成按本章節中的第74條所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附件三中的時間表對設備進行初次運作,而上述時間表(所規定的日期)應經雙方調整並提前7天確定.而其後的試產應盡快執行If the condition is not satisfied before the long stop date of the first tranche completion, the subscription agreement will terminate
倘若此項條件未能在第一期完成之最後完成日期前達成,認購協議將告終止。The public human genome project, funded mainly by the us government and britain ' s wellcome trust, the world ' s richest research charity, was then still aiming for the original completion date of 2005, set when the programme had started 10 years earlier
而在10年前啟動的公共人類基因組項目- -主要由美國政府與英國維爾考姆信託基金(世界上最富有的研究贊助機構)出資贊助,當時仍然將他們的計劃完成日期定在2005年。Ef early finish date
最早完成日期The project plan ' s critical path is the sequence of tasks that ends on the latest finish date
項目規劃的「關鍵路徑」是指在最後完成日期結束的任務間的順序。* * * * your project ' s finish date is determined by the latest finish dates of its tasks
因為項目的完成日期由其任務的最後完成日期決定,而這些完成日期又受完成任務所需時間的影響。分享友人