最小型站 的英文怎麼說
中文拼音 [zuìxiǎoxíngzhàn]
最小型站
英文
minimum-sized station-
In the second place, based on the asu of buggenum igcc plant in netherlands, both static and dynamical model for distillation tower of the asu are created and some valuable conclusions are gained as well. finally, a compartmental simplified model is created for distillation tower of the asu, in order to reduce the simulation time and increase the simulation efficiency. the new model will be helpful to the further simulation and on - line optimal control for the asu of the igcc plant
其次,本文以荷蘭buggenum電站的空分系統為原型,基於matlab建立了空分系統精餾塔的半圖形化動、靜態數學模型,並通過模擬,得出了一些有價值的結論:當空分系統的壓力變化時,氧氣產品濃度的響應時間常數為兩小時左右,說明空分系統是igcc電站最大延遲環節;而且雖然氧氣濃度最後會穩定在igcc電站所要求的范圍之內,但在過渡過程中會超出限制,這些都為igcc電站的安全運行及控制系統設計提供了有價值的信息。This thesis brings forward that it is necessary to develop image - building by planning and design of small towns mainly for tourism from the height of region aiming at some phenomena of desultorily constructions, monotone and simple view, buildings with no design and culture happened and happening in some of this type of towns. the author analyses the system, structure, elements of these small towns through the theory of city identity system and " the image of city " with five elements. on the basis of it, the author studies the structure of sights and the embodiment of characteristic sights and advances the emphases of image - building by planning and design at three different aspects : the region or aero as a whole, the town as a whole and the part of the town
論文針對當前重慶市許多旅遊型小城鎮形象建設雜亂無章,城鎮建設面貌單調乏味,建築缺乏設計和文化內涵,城鎮旅遊接待環境條件差,提出有必要站在區域的高度,對這類小城鎮進行形象規劃和設計,運用城市識別系統cis ( cityidentitysystem )和「城市意象」五要素的原理來分析小城鎮系統結構和要素,以便能夠清楚地認識研究對象,在此基礎上分析旅遊型小城鎮的景觀構成及特色體現,提出了旅遊型小城鎮形象在宏觀、中觀和微觀三個層次上規劃設計的重點,並從理論上分析從實踐中總結出旅遊型小城鎮形象規劃設計的一般原則、方法表達方式及手段等,最後本文運用前面的理論和方法分析了重慶市的兩個典型的旅遊型小城鎮,並進一步得出結論,即旅遊型小城鎮形象建設是一個系統工程,要從規劃和設計兩個角度,結合旅遊的優勢,結合地方,結合自然,既有整體又有重點地對旅遊型小城鎮形象進行塑造,使得旅遊與小城鎮的建設和發展互相融合,協調發展,相得益彰。Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running
本設計針對國產中、小型電站鍋爐燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變量協調控制方案,解決了系統可控性差,難以實現穩定自動運行的問題;在此基礎上,改變以往以煙氣含氧量控制送風的傳統模式,針對國產電站鍋爐設備主體及一、二次送風迴路泄露嚴重,煤種混雜、成分不穩定、燃燒發熱值低、燃燒效率不高等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,設計了一種模糊自尋優控制器,應用在電站鍋爐送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風煤配比,實現最佳經濟燃燒,切實保障了鍋爐的經濟運行。This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed
論文分析了配電變壓器的負載特點;提出採用周期自回歸模型預測配電站用電日負荷,根據負荷預測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝置的研製。In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value
第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向水推力與模型試驗值大小相當;同時論證了對于下機架承重的混流式水輪發電機組可採用其推力軸承負荷作為水電站廠房振動的最大垂直激振荷載。In light of the limitation of fast fourier transform ( fft ) for the method of traditional spectrum analysis to analyze the unsteady signal, wavelet and wavelet analysis are made for the typical unsteady process signal of starting up and shut down with the good characteristic of simultaneous localization in both the time and the frequency domains based on the field test on the vibration of two - row placed units in lijiaxia hydropower station, in which the signal is decomposed into different frequency band, and then the weak signal is caught and the dominant frequency is picked up for the analysis of the vibration source
摘要基於李家峽水電站雙排機組振動的現場試驗研究,並且針對傳統頻譜分析方法傅立葉變換( fft )對于非平穩信號已力不從心這一缺陷,利用小波分析方法在時域和頻域上同時具有良好的局部化性質,通過對開停機這一典型非平穩過程信號進行小波及小波包分析,將其分解到不同頻帶內,獲取微弱信息和提取優勢頻率,並對其作振源分析,得出開停機初始時刻因水流不穩均出現強烈的振動現象,且低頻段信號能量最大,開停機過程水流脈動壓力和尾水渦帶擺動是引起定子基礎振動的主要原因。When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function
在動態規劃方法中把水庫的整個調度期,按句劃分為t個時段,以水庫的蓄水量s或蓄水位z和入庫水量q作為狀態變量,以水庫放水量q或電站出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺水量d最小作為目標函數建立多階段確定性動態規劃數學模型。5 at the nautical school sampling station ( 24 hour monitoring station ), the highest average density of microzooplankton was recorded at sunset ( 154. 91 ind. / l ), successively, at sunrise ( 146. 63 ind. / l ) and noon ( 93. 09 ind. / l ), the lowest was at midnight ( 77. 31 ind. / l )
5 、在航校晝夜監測站,小型浮遊動物的平均豐度以傍晚最高,其次是黎明和正午,午夜時密度最低,分別為154 . 91個升、 146 . 63個升、 93 . 09個升和77 . 31個升。3 abundance of microzooplankton hi jiaozhou bay varied significantly among sampling stations during the survey period. in general, high densities of microzooplankton appeared in water bodies of the inner bay, low densities were recorded at estuary and outer part of the bay. the highest annual average densities was recorded at station 3 ( 346. 45 ind. / l ), the lowest at station 10 ( 55. 54 ind. / l )
3 、在不同采樣站,小型浮遊動物豐度差異明顯,灣內較高,灣口和灣外較低,年平均最高和最低密度出現於3號站和10號站,分別為346 . 45個升和55 . 54個升不同水層,小型浮遊動物豐度差異不明顯。Using minimum water supply cost as objective function, the secondary series of optimal dispatch model was set up. the optimal combination of fixed - speed pump and the optimal range of rate and flow in varied - speed pump station were elaborated. applying these methods for water supply system in yuci city, the result show it can save energy, which illustrate this optimal dispatch model was successful
以供水費用最小為目標函數,建立了給水系統的一級優化調度和二級優化調度的宏觀模型;詳細闡述了泵站中只有恆速泵時恆速泵的最優組合方法,含有調速泵時,給出了確定調速泵最佳臺數、最佳調速范圍和調流范圍的計算方法。An operation decision method for multi - stage pumping station system with adjustable - blade propeller pump is presented. it includes optimal water level of individual stage of pumping station and optimal operation method of every pump. the paper describes some mathematical models and decision making technique of multi - stage pumping station
本文針對大型引水工程整個系統在進入穩態運行后,在各站的抽水流量或首級站進口水位發生變化的情況下及時做出運行決策,調整各梯級站間的水位,達到整個系統總能耗最小的目的。For the medium and small sized hydropower stations equipped with through - flow turbines under the condition of higher fluctuation range of the tail - water levels, the internal space of the auxiliary powerhouse under the maximum tail - water level is almost closed with poor ventilating and lighting condition
摘要高變幅尾水位的中小型貫流式水電站,副廠房最高尾水位以下內部空間近乎封閉,廠房自然通風與採光條件較差。Nevertheless, they can be divided into several categories on the basis of cost and performance : the personal computer or microcomputer, a relatively low - cost machine, usually of desktop size ( though “ laptops ” are small enough to fit in a briefcase, and “ palmtops ” can fit into a pocket ) ; the workstation, a microcomputer with enhanced graphics and communications capabilities that make it especially useful for office work ; the minicomputer, generally too expensive for personal use, with capabilities suited to a business, school, or laboratory ; and the mainframe computer, a large, expensive machine with the capability of serving the needs of major business enterprises, government departments, scientific research establishments, or the like ( the largest and fastest of these are called supercomputers )
然而,根據成本與性能,它們可分為幾類:個人計算機或微型計算機,一種成本相當低的機器,通常只有桌面大小(盡管「膝上型計算機」小到能夠放入公文包,而「掌上型計算機」能夠放入口袋) ;工作站,一種具有增強的圖形與通信能力、從而使其對于辦公室工作特別有用的微型計算機;小型計算機,一般就個人使用而言太昂貴,其性能適合於工商企業、學校或實驗室;以及大型機,一種大型的昂貴機器,具有滿足大規模工商企業、政府部門、科研機構或者諸如此類機構需要的能力(其中體積最大、速度最快的稱為巨型計算機) 。Firstly, having analyzed the present research situation on agricultural climate resources by gis at home and abroad, this thesis illustrates the importance of establishing agricultural climate resources information system. secondly, basing on developmental and integrative environment of arc view gis software, as well as developmental languages ( avenue and vb ), we design agricultural climate resources information system in fujian province with friendly and practical graphic user interface, together with comparatively perfect functions. finally, supported by fjacris, based on fujian province fundamental geographic data and agricultural climate resources database on 71 weather stations, relied on mathematic analysis techniques ( such as multiple statistical analysis, fuzzy mathematics etc ), a group of models are established to reckon the agricultural climate resources on small grids 41 indexes of agricultural climate resources are reckoned to the small grids that are 0. 004 longitude multiplied by 0. 004 latitude
本文首先通過對國內外運用gis進行農業氣候資源研究的現狀的分析,闡明了建立農業氣候資源信息系統的重要意義:接著以arcviewgis為軟體開發集成環境,並以avenue和vb為開發語言,進行了福建省農業氣候資源信息系統的設計和開發,設計出友好、實用的用戶界面,開發出較為完善的系統功能;最後在該系統的支持下,以福建省基礎地理數據和71個氣象臺站的農業氣候資源數據庫為數據源,應用多元統計、模糊數學等數學分析技術,構建了農業氣候資源的小網格推算模型,將福建省農業氣候資源的41個有關指標推算至0 . 004經度0 . 004緯度的地表網格單元上,全面地揭示了全省農業氣候資源的空間分佈規律,並在此基礎上完成了比較細致、精確和可靠的農業氣候系統功能的模糊綜合評價,以及綜合農業氣候區劃和專題農業氣候區劃。According to deeply studying on common information model ( cim ), the article summarized the idea and method of cim, and put forward a set of easy data model named cim _ lanzhou, which is apt to be experimented. the minimal realization is realized by the way of rup. then the article finished the experiment of leading - in
通過深入研究cim模型,總結cim模型的建模思想和方法,提出了一套簡單的,易於實驗的數據模型cim _ lanzhou ,並通過採用統一軟體開發過程實現了電網故障信息主站系統的構架基線? ?完成了系統最小實現,即數據導入功能、數據查詢功能和網上瀏覽功能,並對基於cim _ lanzhou的xml文件進行了導入實驗。First, suppose a source point and a sink point. second, draw a unilateral line from source point to every substation node. the line ' s capacity is set as corresponding substation ' s allowable load value and the line cost is set as the substation ' s unit load cost
本文通過線性化處理后將網架優化模型描述為一個最小費用最大流問題,虛擬一個源點和一個匯點,從源點到各變電站節點各引一條單向弧,弧容量為變電站允許的負荷值,弧費用為變電站單位負荷的費用。Many small firms hate google because they relied on exploiting its search formulas to win prime positions in its rankings, but dropped to the internet ' s equivalent of hades after google tweaked these algorithms
許多小型企業痛恨谷歌,因為他們為了在網站評級中爭得最佳位次而紛紛採用該公司的搜索規則,但這些演算法的調整卻讓他們陷入了網路的深淵。Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station
雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。The rbf network has a better performance, and better forecasting accuracy. then mathematical model of substation voltage / var control is constructed, the squares minimization of voltage differences as target, also considering requirement of voltage and power balance, taking it into consideration that the magnitude constraint of transformer ratio and compensating capacitor, also that constraint of operation times of one day transformer tap and capacitor switch
因此提高了學習性能,具有較好的預測精度。然後,建立變電站電壓無功控制的數學模型,考慮電壓的調壓要求和無功功率平衡,計及變壓器變比和並聯補償電容的上下限約束,變壓器分接頭和電容器允許的日調節次數的限制,以電壓偏差的平方和最小為目標函數。分享友人