最後確定 的英文怎麼說

中文拼音 [zuìhòuquèdìng]
最後確定 英文
finalize
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 形容詞1. (符合事實; 真實) true; reliable; authentic 2. (堅固; 堅定) firm
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 最後 : last; final; ultimate
  • 確定 : 1. (明確地定下) define; fix; determine; ascertain 2. (明確而肯定) definite; certain; for sure
  1. In this thesis, used thermocouple to sense the temperature in the space of the hearth, attributed the thermocouple based on calorifics and scientific arithmetic, acquired data by data acquiring card, processed data according to the demand of setting up temperature model and drawing graphics and then caculated the coordinates of isothermal points and normals of isothermal facets, ascertained the order of connecting points and the model of construct, drawed the isothermal facet of temperature field with opengl at last

    通過數據採集板卡進行數據採集並與計算機介面進行數據處理。然,將處理后特殊點的溫度數據依據marchingcubes演算法建立數學模型求取等溫面上的點的坐標及各點的法向量等。計算的三維坐標點的連接順序和拓撲模型,利用opengl進行等溫面的繪制、消隱和模式變換等工作。
  2. We need to finalize the next product launch

    我們需要最後確定新產品的推出。
  3. A lot of experiments have been done in the process of exploiture soft packaging li - ion battery about how to choice the rational arts and crafts. the content include : how to deal with the collector, add how much pvdf in the material, how long the material need to stirring and the right viscidity, how much condubtivity agent the electrode need, what theckness is best, choice different collectors, the degree of dryness of the electrode, theckness of pressed model, how much electrolyte will be added, placement how long after added the electrolyte, system of formation how to influnce the battery, in formation the battery need or not need preesure from outside, how to vacuumize and the optimize matching positive pole and negative pole. with these practice make sure the parameter of the positive pole should less than 90 m ; according to different vacuumize order the conduc - tivity agent in anode will be 5mass % and 9mass %, respectively, and in cathode the data is 2mass % ; every 100mah added to 0. 4 ml electrolyte ; before formation the battery should be placement 8 hours and the system of formation must be less than 0. 01c before the voltage reach to 3. 0v ; should press in outside when battery in formation ; to these batteries which capacity more than 350mah the vacuum time not excess 15s ; the optimize matching positive pole and negative pole between 2. 10 : 1 and 2. 15 : 1. finally make out the battery which cycling performance and security are all very well

    液態軟包裝鋰離子電池的研究主要是對關鍵工藝進行了優化設計,具體包括:集流體的處理、 pvdf的加入量、漿料攪拌時間和粘度、導電劑的加入量、電極膜的厚度、不同集流體的選擇、電極膜的乾燥程度、壓型的厚度、電解液的加入量、注入電解液后靜置時間的長短、化成制度的影響、化成時電池所具有的壓力影響、抽真空的處理、正負極活性物質的匹配。最後確定出液態軟包裝鋰離子電池佳工藝參數:正極膜的厚度小於90 m ;根據化成時不同抽真空順序,正極膜中的導電劑的加入量分別為5mass %和9mass % ;負極膜中導電劑的加入量為2mass % ;電解液的加入量為每100mah添加0 . 4ml ;化成前電池的靜置時間應當大於8h ;電池在3 . 0v之前採用小於0 . 01c的化成制度;在化成過程中應當施加一的外部壓力;對於350mah的電池抽真空的延時不應大於15s ;而正負極活性物質的質量比應當在2 . 1 : 1 2 . 15 : 1之間。
  4. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  5. The company said details of the project, including which rail sections would go to which companies, had yet to be decided

    他們還說項目的細節,包括哪個公司承擔哪個路段,還沒有最後確定
  6. The most urgent and important thing for the kodak health imaging in china is that how to make a channel - design decisions to maintain the growth of analog product at 20 % and meet the target of the digital product in 2003. in the analysis, base on the analysis of the background of the company, the market forecast, the needs of the distributors, the customers, the author put forward several channel proposals. and then the author analyses the proposals and decide the best channel to achieve the goal : the equipment distributors and the film distributors to develop the big and middle hospitals together, the equipment distributors and the medicine company or other small hospitals distributors to develop small hospitals together

    在案例分析中,作者對柯達公司的背景及現狀進行了分析,對市場前景進行了預測,並對分銷商、醫院的需求以及醫院病人的終需求進行分析,再對各個中間商進行優劣分析,出幾個分銷渠道備選方案,並對其逐一進行分析,最後確定佳的分銷渠道方案:即由設備分銷商與膠片分銷商共同開發大中型醫院,設備分銷商與當地醫藥公司或醫院固分銷商共同開發偏遠地區小型醫院市場。
  7. At first, the finite element formulation is presented to determine the flutter characteristics of laminated panels at elevated temperature. then both the linear and nonlinear panel flutter characteristics are analyzed. the panel flutter boundaries are finally determined and the effect of temperature, airflow speed, etc, on the panel flutter characteristics is analyzed

    為此,本文首先建立了復合材料壁板熱顫振的有限元模型並對受熱壁板的線性和非線性顫振特性進行了研究;最後確定了壁板的顫振邊界,分析了溫度、來流速度等因素對壁板顫振特性的影響規律。
  8. Finally, fix the fact error limit, think that such ought to consist of three kinds of forms : target error, strike error and the causation error. be living on this base, get off a definition to the fact error, namely, fact error in the criminal law is that action man is living to implement in the process willfully committed a crime, constitute to committing a crime that the fact that does not need the statue rating happens correctly not understanding in the important document, the criminal fact that the criminal fact that action man who arouses anticipates against practice happens not unanimously

    了事實認識錯誤的范圍,認為其應包括三種類型:對象錯誤、打擊錯誤和因果關系錯誤。在此基礎上,給事實認識錯誤下了一個義,即刑法中的事實認識錯誤是指行為人在實施故意犯罪過程中,對犯罪構成要件中不需要法律評價的事實發生不正認識,引起的行為人預想的犯罪事實與實際發生的犯罪事實之間的不一致。第三部分:事實認識錯誤的處理原則。
  9. Based - w on uml, we use uml extend mechanism to process specific property develop about workflow : customize stereotype such as contract, port, collaborate, etc. and set up contract hierarchical system structure. for strict mathematical analysis and simulation, we also provide a convertible mechanism from uml model to object petri nets and a object petri nets ? formal analysis method. analyze the complicated dynamic relation among wofld7low ( work item ) in distributed workflow system by object petri nets ? strong analysis and simulation capability

    我們以uml為基礎,利用uml的擴展機制進行了有關工作流特性的擴展:製了合同、埠、通訊協議塊等版類,建立了合同化的層次體系結構;為了對建立的模型進行嚴密的數學分析和模擬,我們又提供了從uml模型到對象petri網的轉換機制和對象petri網的形式化分析方法,利用對象petri網強勁的分析模擬能力來分析分散式工作流系統中工作流(工作任務)之間的復雜的動態關系;根據分析結果可以對模型進行有效地改進,最後確定的模型容易實現到程序代碼的轉換。
  10. When the student applied for the declaration for examination, the exam scheduled had not been finalised yet

    當學生申請考試證明書時,考試時間表仍未最後確定
  11. Arnd hoeveler, of the european commission ( ec ), says, " the clinical trial sites are the result of an ec funded consortium of ten european and african institutions ( the oflotub consortium ) that are in the process of finalizing the terms of a proposed collaboration with the who to develop a new short course treatment regimen

    歐洲委員會的arndhoeveler說: 「臨床試驗地點是一個由歐洲委員會資助的聯合會( oflotub聯合會)選的,該聯合會包括10個歐洲和非洲機構,它們正在最後確定一項與世衛組織合作的條件,以便制一種新的短程治療方案。
  12. The author analyses supply water quantity of groundwater, the yellow river water and the dirty water that can be reuse, and predicts society and economy factors. then the water flexibility coefficient method and gray theories method, trend method etc are made use of in order to program the needs of water and these methods was evaluated to make sure the reasonable estimate value finally

    通過對規劃區內地下水可供水量、黃河水可引進水量與污水回用之和構成規劃區內可供水總量的分析和對社會經濟發展指標分析和預測,利用曲水彈性系數法、用水積水增長率法、灰色理論法、趨勢法等多種方法對規劃區內的需水量進行預測,並對不同的方法預測成果評價,最後確定較優的預測值。
  13. In the part of the design of hydraulic loading system, constituting project of the hydraulic loading system of current test bench through comparing and analysing international and national current hydraulic loading projects and working out the pressure and flux of which according to the load and velocity and structure dimension of hydraulic executor - actuator. thus, choosing the power and hydraulic component and designing hydraulic loop

    在液壓加載系統設計部分,通過對國內外常用的幾種液壓加載方案的對比研究,最後確定了本試驗臺的液壓加載方案。根據液壓執行元件? ?油缸的外載荷、運動速度和結構尺寸我們便可以液壓加載系統的壓力和流量。
  14. This paper set up a geological model of sliding mass by geological condition analysis and selection cross section of character representation of guishan sliding mass. the stability of sliding mass is calculated and evaluation under bench stoping and deck excavation in terms of six excavation schemes with limit equilibrium method. there dimensional finite element method is applied to study the stability of sliding mass to the deck excavation schemes by means of computer simulation and calculation

    通過對滑坡體工程地質條件的分析,選取滑坡體的代表性剖面建立了滑坡體的地質模型,選取極限平衡方法就滑坡體在臺階式開挖和整體開挖兩種不同開挖方式共6種具體開挖方案條件下,對滑坡體的穩性進行了量計算評價,提出臺階式開挖和整體開挖兩種不同開挖方式的的各開挖方案的比較結果,然的具體開挖方案開展三維有限元數值計算,並進行評價,以達到相互校核、相互驗證的目的,出工程應用的開挖施工方案。
  15. At last, we design the logical structure of the system

    最後確定整個系統的邏輯結構。
  16. In this thesis, a design scheme is introduced about whole early - warning system ’ s structure according to the optical needs. the focus is placed on the pointing speculum ’ s light - weighting design. through comparison, sic is selected as the speculum ’ s material which has features of high strength, low density, well comprehensive performance and being adaptable for space environment

    本文首先根據光學需要對導彈預警系統總體結構進行了設計,重點對其中的關鍵部件指向反射鏡進行了輕量化設計,通過比較選擇了合適空間環境且具有高強度、低密度、綜合性能好的sic作為反射鏡的材料,運用有限元分析軟體ansys對幾種輕量化結構分別進行優化,通過比較最後確定指向反射鏡輕量化結構及尺寸。
  17. A good guideline for it and software development projects is to pay no more than 20 % to 30 % of the total project price up front, with the rest of the payments awarded based on the completion of 3 or 4 milestones

    It與軟體開發工程的預付金不會超過工程價格的20 % - 30 % ,其它傭金需要根據目標完成情況,最後確定
  18. Finally, he built up the new salary principles

    最後確定了新的薪酬制度。
  19. First of all, this thesis expounds author ’ s view about the actuality of transportation network and freight terminal in changchun, and introduces the basic case of changchun yuanda freight terminal as well, and then construe the primary problem of the highway major hinge of the freight terminal, which represents faultiness in six functions, which represent transport administration, transshipment 、 changing to load, loading and unloading 、 storage and transportation, communication information, assistant service for producing and life, and so on 、 without formed system and the disaccording with the require of large market, large circulation, big development which carried out by ministry of transportation

    首先,對長春市運輸網及貨運場站現狀進行介紹,對長春市遠達貨運站的基本情況介紹,同時對長春遠達貨運站面臨的戰略與策略選擇問題進行了闡述。其次,通過對第三方物流戰略合作關系和對遠達貨運站合作夥伴關系體現的闡述,對第三方物流業務的發展現狀進行了分析,從而了長春遠達貨運站戰略位。,通過對長春市第三方物流市場進行了綜合性分析與預測,對遠達貨運站和現有的競爭對手優劣勢分析,最後確定了長春遠達貨運站經營戰略實施的總體規劃。
  20. Simulation and experimental results in that the novel converter is feasible. through the comparison of three schemes, the novel zvs isolated boost converter is the best dc link topology of the modulariation aviation static converter

    通過對三種電路方案的比較,最後確定新型隔離型zvsboost電路是模板化航空靜止變流器直流環節的佳拓撲方案。
分享友人