月進度 的英文怎麼說

中文拼音 [yuèjìn]
月進度 英文
monthly progress
  • : Ⅰ名詞1 (月球; 月亮) the moon 2 (計時的單位) month 3 (姓氏) a surname Ⅱ形容詞1 (每月的) mo...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. The williams case, which stinks on ice, was back in the news in february because a friend of ted ' s was able to finagle a visit to the cryogenics lab in question, located in scottsdale, ariz., where baseball players who are still alive were gathering for spring training

    威廉斯這宗臭名遠播冰屍案2見報,因為他的一位朋友耍手段,到位於亞利桑那州斯科次達市(仍在世的棒球員正在該市行春訓)的低溫實驗室走了一遭。
  2. At that time, the at - grade crossing currently below the footbridge will be closed. in addition, the footbridge north of the tin wah roadtin shui road junction connecting tin yan estate and phase 2 of chung fu shopping centre was opened for public use on 1 september

    有關工程理想,預期該橋在九底可重新開放供居民使用,而現時位於該處橋底的臨時路面行人過路處,則將在南橋開放后停止使用。
  3. On feb. 14th, ittf president adham sharara visited peking university to inspect the construction work of the table tennis competition stadium for the 2008 olympic games

    2006年214日,國際乒聯主席沙拉拉一行來訪北京大學,了解2008奧運乒乓球比賽館施工,並參觀了北京大學方正乒乓球俱樂部。
  4. The test for 2000 - 01, which was conducted in august 2000, found that the air quality of a few offices exceeded the guideline levels in respect of carbon dioxide and the total viable count of microbial biological contaminants

    2000至01年的測試在2000年8行,結果發現有些辦公室,疑因翻新工程影響抽風系統的效能,以致二氧化碳和微生物/生物污染物總活菌素含量超標。
  5. Event and noted that there seems to be a six month delay before a new applicant is assigned an application manager which hinders the big - endian arm port

    活動並提到新開發者在等待分配application manager的漫長六個延遲了big - endian arm機器的移植
  6. Following the approval of the relevant manualsmaintenance scheduleflight test schedule and the conducting of inspections of its facilities and route proving flights to ensure its fulfillment of the department s requirements, an aoc was granted to cr airways on march 16

    民航處又審批有關的手冊維修作業表飛行試驗表,檢查其設施和監察其航線驗證試飛,確保該公司符合處方各項要求后,於三十六日簽發航空營運許可證予該公司。
  7. By analysis the test data, the law of temperature variation in day and temperature variation in month was got ; moreover, the probability statistics mode of day temperature difference with its statistic parameter was got too. at the same time, the year temperature difference data of walls and roofs were obtained. through the field tests, the law of thermal cracks, displacement and stress in cshbb was summarized

    對杭州市某一小砌塊試點建築行了為期近一年的現場跟蹤監測研究,給出了小砌塊建築的日溫變化規律和變化規律,並由此得到了小砌塊建築的日溫差概率統計分佈模式及相應的統計參數和小砌塊建築不同方位的墻體和屋面的年溫差數據;通過現場跟蹤監測,也得到了小砌塊建築的裂縫發展規律及位移和應力的變化規律。
  8. Our company is built in 2000, mainly design, produce and sell lcd and lcm with industrialishts more than one thousand. we provide tn htn stn fstn lcd and smt cob cog lcm that can be used in instrument, car, company, gps and so on. we have cooperated with haier delux galanz and son on these wellknown enterprises, provide good after service

    公司主營: skf ntn nsk iko nachi fag koyo ijk等口軸承,備有大量現貨,實行全天候配送貨,能在最短的時間內為用戶解決軸承的配套供應和提供個性化的優質服務,公司技術力量雄厚,擁有全國一流的專家顧問群,能為用戶提供儲備二個以上的用量庫存,大大減輕工廠的庫存壓力,並保證工廠的生產不會因缺少軸承而影響生產
  9. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電工程,於2005年1227日正式投產發電,工期提前了12 . 5個正式移交試生產,而應用p3有效控制工程是該重點工程提前並網投產的關鍵。
  10. The newspaper features 16 pages monday through friday and 12 pages on saturday. pages are designed with a focus on appearance, the importance of their content and readers needs. in - depth reports and features, news analyses and editorials as well as comment on hot issues are representative of the opinions that matter in china

    《中國日報》採用國際流行版式,於2004年1行大幅改擴版;現為平日兩疊16版,周末12版;強調版面的整體視覺沖擊力;突出新聞報道的權威性和讀者針對性,重視深報道和新聞特寫,力求提供解獨到的新聞分析;每日針對熱點問題,發表社論時評,反映和代表中國的權威之聲。
  11. Is there a line plan or production loading schedule for at least one month in advance

    有預先最少一個的生產線路圖或者生產表嗎?
  12. Ovary development stage of females in catches and radar observation indicated that l. sticticalis migrated to northeast in early june, to southwest in august and september, and locally - bred moths dispersed over shorter distances in july and august

    卵巢發育法和雷達觀測表明草地螟在6初向東北遷飛,在8和9向西南遷飛,當地繁殖的蛾子在7 、 8行短距離擴散。
  13. The tokyo metropolitan government became the first in the nation to introduce a new public accounting system that more clearly shows the state of public assets by adopting a double entry bookkeeping system in april this year

    2006年7一步簡明政府機關的會計制東京都廳從今年4開始,在全國第一家導入了採用復式簿記方式使公共資產狀況更加清晰明了的新的公家會計系統。
  14. The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4

    3 .通過溫控研究,簡化了溫控措施,加大了澆築尺寸,加快了施工,閘壩竣工比原計劃提前了6個
  15. Chain ' s trade surplus rose by nearly 50 per cent to a record $ 262bn in 2007, but import growth exceeded export growth in each of the final three months of the year, suggesting that the period of huge expansion of the controversial surplus might be drawing to a close

    2007年中國的貿易順次增長了近50 % ,達到262美元,但是2007年最後三個口增長率超過了出口增長率,表明這一頗具爭議的貿易順差過發展階段即將結束。
  16. In march 1997, the final report of the task force was published. it gave an account of the progress of work of the various government bodies with respect to the 14 leading service industries and the 8 - point framework, and provided a clear picture of the future policy directions

    一九九七年三,專責小組發表最後報告,就十四個主要服務行業和八個工作策略匯報了政府各部門的工作,並清楚勾劃了未來的政策路向。
  17. Make a written progress report at nine months

    在九個時撰寫報告
  18. Check up electrical material & equipment to be site & check up monthly quantity of construction progress

    檢查工地材料設備,核對月進度工程量。
  19. Check up mechanical material & equipment to be site & check up monthly quantity of construction progress

    檢查工地材料機械設備,核對月進度工程量。
  20. Preparation of contracts department monthly report for inclusion in client report and other reports as required

    準備合同部門的月進度報告,包括客戶報告和其他所需的報告。
分享友人