有功負荷 的英文怎麼說

中文拼音 [yǒugōng]
有功負荷 英文
active load
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : 名詞1 (功勞) exploit; merit; meritorious service [deed]: 戰功 military exploits; 立功 render me...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 有功 : have rendered great service; have performed meritorious service
  • 負荷 : [電學] load; charge; weight
  1. With distributed control system, mscis possesses the characteristics of centralization of it " management, distribution of it " functions, burthen and malfunctions

    Mscis介面系統採用分散式體系結構,具管理集中、能分散、分散、故障分散和易於擴展的特點。
  2. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用壓水堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態率變化時,冷卻劑平均溫度與蒸汽壓都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,效地改善了核動力裝置的總體運行性能,特別是在低運行時,可以提高裝置經濟性、降低主泵運行噪聲、改善二迴路系統的設計、運行和控制條件,這對于提高船用核動力裝置的運行可靠性和安全性具實際意義
  3. Heart failure gratified the function is not complete, it is to show the case that has circumfluence of blood of right amount vein falls, because the heart is long - term bear is overweight or heart myapathies caustic makes force of cardiac muscle systole drops, heart cannot enough blood satisfies eduction constituent metabolization need so that all round constituent perfusion inadequacy and pulmonary circulation or blood of systematic circulation yu, a series of clinical symptoms that appear thereby and body are asked for, say for heart failure

    心力衰竭又稱心能不全,是指適量靜脈血迴流的情況下,由於心臟長期過重或心肌病損使心肌收縮力下降,心臟不能排出足夠血液滿足組織代謝需要以至於四周組織灌注不足和肺循環或體循環瘀血,從而出現的一系列臨床癥狀和體征,稱之為心力衰竭。
  4. First from system aspect, this paper uses voltage sensitivity, pv curves method, equivalent reactive compensation method, back - up generation method to evaluate the reactive value of the generators in seven buses system and ieee 14 buses system. the vs and pv methods can evaluate the source ' s ability of tracking the load ' s variation. the erc and back - up methods can evaluate the availability of replacing other generators. the value determines the cost

    從對系統貢獻角度,採用電壓靈敏度方法( vs法) 、 pv曲線法、等效無補償法( erc ) 、無備用方法來確定一個七節點系統中的發電機的無價值和ieee14節點系統的發電機的無價值,電壓靈敏度法和pv曲線法可比較出不同電源跟蹤變化的靈敏度大小,而等效無補償法和無備用方法可比較出不同電源替換其它發電機是否是最效率的。
  5. To prepare international standards for electrical energy measuring and electrical load control equipment ( such as watt - hour meters, var - hour meters, maximum demand indicators, telemetering for consumption and demand, equipment for remote meter reading, time switches, equipment for the control of loads and tarifs and consumer services ) including the equivalent electronic forms of these devices and their accessories

    責制定電能測量和控制設備(如:、無電度表、最大需量指示器、損耗和需量的遙測、遠程抄表設備、時間開關、和費率控制設備及用戶服務等)的國際標準,包括能相近的運用電子技術實現的設備及其附件。
  6. Baf has many advantages, such as small volume, little covering earth and hydraulic retention time ( hrt ), high treatment efficiency and effluent water quality, low investment and running cost etc. baf has been used widely for many years in the world and been used to treat several wastewater in our country. in this paper, baf was studied on guanting reservoir water source treatment with pilot scale and homemade expanded clay as filtration media

    曝氣生物濾池( biologicalaeratedfilter ,簡稱baf ,或biologicalfiltrationoxidizationreactor ,簡稱biofor )工藝具體積小、容積高、水力大、水力停留時間短、所需基建投資少、處理出水水質好等特點,國外已廣泛應用,國內也在多個行業的水處理中成應用。
  7. The fuzzy algorithm of bi - object active power economic load distribution

    雙目標日經濟分配的模糊演算法
  8. Taking load uncertainties, infeasibility problem and multiple objection of the reactive power optimization in the radial distribution system into consideration, loads are modeled as fuzzy interval numbers. fuzzy power flow is proposed based on fuzzy interval load for the more practical membership function of line losses rate and maximal voltages offset. this thesis presents multiple objection model of the reactive power optimization considering uncertainties using the fuzzy set theory

    對配電網電壓無優化問題中的非概率性的不確定性問題、多目標問題、約束不可行性問題進行了研究,用模糊區間來描述實際的情況,並用的模糊區間值計算配電網的潮流,得到率損耗和電壓的模糊區間值,使網損率和節點電壓最大偏移量的隸屬函數更接近實際情況;將改進遺傳演算法與模糊集理論相結合,通過求解多目標函數和約束條件的模糊集合的交集,得出網損率和節點電壓最大偏移量最小的最優運行狀態。
  9. Many protective and monitoring functions are integrated in the system, such as earth - fault monitoring, short circuit protection, over - load protection, phase symm etry and phase loss monitoring, over voltage protection, under voltage protection, motor thermal monitoring and so on

    該系統能自動轉換控制方式,具漏電、短路、過載、斷相、欠壓、過壓等保護能,並且能通過漢字顯示終端顯示各路的工作狀態和工作參數。
  10. On the base of widely investigating and researching, author deems that the conventional reactive power compensation devices used by consumer had many defects with among others : lower response time, remaining residual voltage on the compensation capacitors, and so on. because of existing improper trigging time, it is impossible to realizing balance compensation for 3 - phrase unbalance loads

    本文在充分調研的基礎上,認為目前採用的傳統的無率補償裝置存在響應速度慢、觸發時刻不合適、補償電容器上殘壓、不能實行三相平衡補償、對電網產生污染、不能消除本身產生的高次諧波等弊病。
  11. When there is active power deficiency or line overloaded, linear programming method with multi dispatching strategies is applied to adjust generator output or shed load

    當潮流計算結果出現線路過載或缺額時,採用線性規劃方法,建立電力系統發電再調度演算法,加入了各種優化目標策略,尋找調整發電機出力或者切措施。
  12. Section iii proposes a possible organization of a reactive power market, a regional reactive power market established according to the distribution of the load and the reactive supply. the regional reactive power market is composed of a reactive energy market based on marginal pricing and a reactive capacity market based on a reactive regulating capacity payment. the cases in section iv, based on the market organization proposals and the reactive bid structure previously presented, performed on a five - bus system and the ieee 14 bus system, are used to analysis the effects of active bid, voltage control and power factor on the reactive marginal price

    本文首先回顧了電力市場發展的歷史和現狀;然後對市場中的定價方法和無輔助服務的內容及特點進行了總結,並介紹了一些國家的無輔助服務市場模式和交易方法;接著立足我國國情,提出了單邊開放電力市場下的無市場框架:即根據和無源的分佈特點建立區域無市場,各區域無市場又由相應的無電量市場和無容量市場組成;並提出了該無市場模式下的機組報價模型和基於報價的以系統總購電費用最小為目標的無電價計算方法;最後用一個5節點系統和ieee14節點系統進行了實例分析,初步研究了發電機報價、系統電壓控制以及率因數對無電價的影響,得出了一些借鑒意義的結論。
  13. It is built using graphical technology of geographic information system and can be used as the graphical plate for power system software, making the operation and the management of the devices easy and intuitionist, and the analysis of network topology more automatic and accurate. in the aspect of the calculation of loss, this system calculates the loss of the active power and reactive power, forms the result in the database considering the differences of load - curves at every node, and allows the property or queries loss of the devices using graphic interface

    它以地理信息系統( gis )的圖形化技術為基礎,為電力系統軟體架設圖形化平臺,使設備的操作、管理更加直觀,使電力系統的網路拓撲分析程序更加自動化、準確;在線損計算方面,考慮了各節點曲線的不同,可以從計算結果中分別統計損耗和無損耗,也可以方便的在配網圖上對各種元件進行屬性查詢,損耗查詢等。
  14. Based on the theory of branch complex power, accurate formulas are derived to determine complex loss and flow components in power elements. to overcome the deficiencies of the traditional methods which transmission cost is allocated to users only based on active power flow and the existed using portion definitions which fail to take it into account that the interaction of active and reactive power, a new definition of the using portion of a power element by a particular generator or load is addressed

    針對當前輸電費用只按潮流進行分配,無法計及無潮流交叉影響的缺陷和基於傳統的電路理論無法結合潮流來定義元件使用份額的問題,本文又在復率電源的支路率分量理論基礎之上,基於發電機和的復率在支路上引起的損耗分量,給出了發電機和對元件使用份額的新定義。
  15. Thus the reactive compensator can be located in the center of the distributed load in the area and make the best user of the compensator ' s capacity. the distance flowed by the reactive current is efficiently reduced and the active loss of power net goes down. two - stage control model is adopted in the optimized control technique of the system

    該系統採用了測量點與補償點與分開的方式,實現了區域性無監視,使無補償點可以安置在區域性分散的中心部位,最大程度地利用了補償容量,效地縮短了無電流傳輸的距離,降低了電網的損耗。
  16. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰變電站是豫北一座樞紐變電站,2臺120mva的主變, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引變電站供電的110kv線路。由於電力機車屬于大率的非線性,且三相不對稱,在其運行過程中必然會產生較大的高次諧波和序電流。
  17. The pertinence of actualizing the measures is particular, which requires the status of remaining heating and cooling load, building utility, meteorological data, etc. should synthetically be taken into consideration

    但節能技術措施的實施具較強的針對性,需要綜合無余熱(冷) 、建築能、氣象參數等多方面的因素進行綜合考慮。
  18. Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased

    由於預先預測出無,提前了解了無率變化的趨勢,可以助於判定低壓母線電壓變化是由無變化引起還是由高壓側電壓變化引起,從而適時決定是調載調壓變壓器分接頭還是投切電容器,以此避免了盲目和不充分的調節,實現在保證無基本平衡和電壓合格率的前提下,減少載調壓變壓器分接頭的調節和並聯電容器組的投切次數。
  19. This paper mainly discusses a control method of substation voltage and reactive power. in order to get suitable decision for one day 24 hours tap - transformer ' s step switch and shunt capacitor switch, an approach of substation voltage and reactive power control on the basis of the combination of artificial neural network ( ann ) reactive power forecasting and evolutionary programming optimal decision - making is put forward

    論文主要研究變電站的電壓/無控制決策問題,為了確定一天24小時內合適的載調壓變壓器分接頭位置和並聯電容器投切狀態,提出一種基於人工神經網路的無預測和進化規劃優化決策相結合的變電站電壓和無的綜合控制決策。
  20. Rated power load switch - off current 1250

    額定有功負荷開斷電流a 1250
分享友人