有襯砌的底拱 的英文怎麼說

中文拼音 [yǒuchèndedegǒng]
有襯砌的底拱 英文
pave invert
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 4次方是 The fourth power of 2 is direction
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及效應力理論分析相結合方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下土層液化情況進行分析得出:當隧道板坐落在5層且5層較厚時液化區出現在隧道板處;局部地段液化區出現在隧道頂部及腰;大部分地段液化區出現在隧道頂板上方。
  2. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析結果比非線性屈曲分析結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只初期支護時,隨著地應力增加,圍巖荷載分擔率增大,相應地,初期支護荷載分擔率就減小了;當初期支護和二次共同作用時,圍巖荷載分擔率在50以上,這一分擔率隨地應力增加其變化不大;支護和巖體整體分析表明,腳處應力集中嚴重,隧道巖體側墻及墻角圍巖應力集中也較大。
分享友人