有載線 的英文怎麼說
中文拼音 [yǒuzǎixiàn]
有載線
英文
terminated line-
Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports
首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。Again, if the analysis engine knows if loading coils are allowed, and, if so, how they may be present, algorithm complexity can be eased
再次地,如果分析引擎知道是否允許負載線圈,如果有的話,他們是如何安裝的,即能降低演算法復雜性。Electricity metering - data exchange for meter reading, tarif and load control - part 31 : use of local area networks on twisted pair with carrier signalling
電量計.抄表電費和負荷控制的數據交換.第31部分:帶有載波信號傳輸的雙絞線局域網的使用Electricity metering - data exchange for meter reading, tariff and load control - part 31 : use of local area networks on twisted pair with carrier signalling
電度表.計數器讀數稅控制和負載控制的數據交換.第31部分:帶有載波信令的雙扭線局域網的使用Specification of leadframes for plastic leaded chip carrier packages
塑料有引線片式載體封裝引線框架規范Because of the periodicity of the hub oscillatory load and the nonlinearity of the i / o relationship of the smart rotor, the neural control methods with both off - line and on - line modeling in frequency domain on the smart rotor and their realization procedures are presented
飛行中直升機的槳轂交變載荷以周期性的為主,而智能旋翼的輸入輸出關系具有非線性特徵。據此,本文提出離線建模的和在線建模的智能旋翼頻域神經控制方法,並給出實現的具體方案細節。Works on the bending roll system of four - roll rolling mill, the workroll shape variation caused by the force of bending roll and the contact stress between rolls was researched with the fem software ansys, the maximum deformation of the work roll was calculated, and the curve of the gap adopting the least - squares method was fitted, which set the base of the further calculation of load - gap shape
摘要以四輥軋機的彎輥系統為研究對象,利用有限元分析軟體ansys研究彎輥力和輥間接觸應力引起工作輥形狀的變化,計算工作輥彎曲的最大變形量,並用最小二乘法對輥縫曲線進行擬合,為進一步計算有載輥縫形狀提供可靠的理論依據。Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor
本研究通過分析所獲得的最優綜合控制組合曲線及電網潮流,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮流分佈合理、各變電站母線電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行水平及供電質量。This paper researches basic principle of microwave digital phase shifter deeply, reviews different theories of all kinds of microwave digital phase shifter circuit, analyzes loaded - line phase shifter in detail and draws design curves according to formulas. and this paper presents a novel method, which makes use of modeling simulation that software - ansoft serenade 8. 7 provides to evaluate parameter values of pin diodes through s parameter measurement. then, a kind of 6 - bit digital phase shifter circuit is designed and simulated through software - ansoft serenade 8. 7
本文對微波數字式移相器的基本理論進行了較深入的研究;綜述了各種微波數字式移相器電路的工作原理,著重對加載線式移相器電路進行了理論分析,並根據計算公式作出一系列相應設計曲線;提出利用軟體ansoftserenade8 . 7所提供的測量數據擬合功能,通過測量s參數來確定pin二極體等效電路參數的新穎實驗方法;利用微波電路設計軟體ansoftserenade8 . 7對6位數字式移相器電路進行模擬、優化設計,做出樣品,並對其性能測試分析,對研製微波數字式移相器具有重要的參考意義。With the consideration of most of our transformers " taps are changed manually and some fluctuate unnecessarily, this paper presents a supervision system of oltc based on plc control technique. then we combine this system with reactive power compensate device such as shunt capacitor to design a new supervision system of substation voltage and reactive power synthetic control based on plc fieldbus
針對國內變電站電壓調整大多依靠人工調節,且有載調壓變壓器( oltc )分接頭動作頻繁的特點,本文提出了基於plc控制技術的有載調壓監控系統的研製方法,並以此監控系統為基礎,結合併聯補償電容器組等無功補償設備,設計了一種基於plc現場總線的變電站電壓無功監控系統。When the system load over 0. 69, there are deadline dropping in the rma scheduling
實驗表明,系統負載大於0 . 69時, rma調度中開始有死線丟失。The study bases on the four operating conditions of which the longnan network will be implemented in the year of 2005 and 2010. first, this paper calculates the power flow distribution that including the line charging reactive power and input of the low - voltage shunt reactor in chengxian s / s. assumed that the bus voltage of tianshui s / s and bikou power plant to be constant, the study count the voltage level of the 330kv and 220kv bus - bar when the 330 / 220kv transformer in standard tap changer position. in order to set control rules
本文基於隴南電網在規劃發展水平年2005年及2010年的四種可能的運行方式下及潮流條件,計算出了計入線路充電無功及投入成縣變低壓並聯電抗器后的潮流分佈,在設定甘肅大網側及碧口電廠側母線電壓恆定條件下,計算了330kv及220kv主變在有載調壓標準分接頭變比下的330kv及220kv母線電壓水平。The devices have many merits. they can sensitively and reliably cut off all the faults occurring in the power system. even under the critical situation, faulting on the long heavy load transmission lines through high ground resistances, the criterion based on fault components still has considerable sensibility
此裝置的優點是:能夠靈敏、可靠的切除電力系統發生的各種故障,尤其是基於故障分量的差動判據與傳統差動判據相比,在重載線路上發生各種故障,即使是高阻接地時,也具有很好的靈敏性。Though standard cast resin dry - type transformers can meet the demands of most consumers. we still have to proceed special designing of transformers for special application field and operating conditions, such as single phase transformers, regulating transformers with onload tap changer, double voltage transformers, isolating transformers, rectifying transformers, earthing transformers and transformers with special tapping arrangement, which we are supplying to consumers all over the country
雖然標準的樹脂絕緣乾式變壓器已能滿足大多數用戶的要求,但是對于某些特殊的應用領域與使用條件仍需我們進行特殊設計。諸如單相有載調壓雙電壓變換隔離整流接地以及有特殊出線排列的變壓器,我公司在不斷地提供給各地的用戶。Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased
由於預先預測出無功負荷,提前了解了無功功率變化的趨勢,可以有助於判定低壓母線電壓變化是由無功負荷變化引起還是由高壓側電壓變化引起,從而適時決定是調有載調壓變壓器分接頭還是投切電容器,以此避免了盲目和不充分的調節,實現在保證無功基本平衡和電壓合格率的前提下,減少有載調壓變壓器分接頭的調節和並聯電容器組的投切次數。So the emergence of facts is just for the purpose of solving these problems of power system. as a branch of facts, active power filter ( apf ), a new power and electric equipment, its function is to eliminate load harmonic and compensate system line reactive power, damp system surge of node voltage, decrease power waste of system line
作為facts的一個重要分支- - - -有源濾波器( apf ) ,是為了解決系統線路無功功率因數過低以及負載線路諧波過多,從而出現線路損耗大、電源電壓的瞬態波動過陡等一系列相關問題而產生的一種新型電力電子裝置。To meet the needs of teledata transit, the digital transmitting techniques are applied to the system, the power line carrier wave tele - circuit with a bus transfer interface is supplied, and what ' s more, a detailed introduction is given to illustrate the operation
為了滿足遠距離數據傳輸的需要,將電力線載波數據傳輸技術應用於冷庫溫度檢測系統中,並設計了帶有總線轉換介面的電力線載波通信電路,闡述了其工作原理。The impact of load characteristics and on load tap changer on static voltage stability is analyzed with the methods based on v - q and v - p curves, and the phenomenon of voltage stability voltage instability and voltage collapse are studied with steady - state simulation. finally the thesis presents the essential explanations of both voltage stability and the mechanism of voltage collapse. xu yonghua ( electrical engineering ) directed by prof
通過電壓?功率曲線分析法定性分析了不同負荷特性和有載調壓變壓器對靜態電壓穩定性的影響,並通過靜態模擬法從物理現象上研究了電壓失穩和電壓崩潰現象,最後針對這些現象給出了關于電壓穩定、以及電壓崩潰的本質解釋。If download manager with multi - thread capability is being employed, make sure that you restrict the download into single thread only, or the download may fails
如用有多線程下載功能的下載管理軟體下載?請把系統限制在單一線程的情況下進行下載?否則檔案可能會下載失敗。Secondly, safety factor of a landslide body with a polygonal sliding surface is analyzed in this paper. the results demonstrate that this method can consider that the different material stiffness parameters in the landslide body have an effect on the safety factor. finally, the safety factor of a three - dimension landslide body with a spherical sliding surface is calculated with this method, and the applicability of this method for three - dimension slope is verified after comparing the result with theoretical answer
文中首先用具有理論解的算例? ?垂直坡受集中荷載的安全系數問題驗證了該方法的正確性,再通過對一個具有折線滑動面的滑坡體的安全系數的分析說明了該方法還可以考慮塌滑體內不同的材料剛度參數對安全系數的影響,之後用該方法對一個具有球形滑裂面的三維滑坡體進行了計算,通過與閉合解的比較驗證了該方法對三維邊坡問題的適用性。分享友人