未裝載 的英文怎麼說

中文拼音 [wèizhuāngzǎi]
未裝載 英文
uneq une quippedd
  • : Ⅰ副詞1 (沒) did not; have not 2 (不) not Ⅱ名詞1 (地支的第八位) the eighth of the twelve ear...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚解決,甚至不為人注意的考慮地基變形的地基承力問題進行了實用化的探討,提出了考慮地基變形的地基承力上程計算方法;對基於彈塑性理論分析的地基承力國內尚見報道的空間問題得到了圓形基礎(空間問題)的承力界限荷p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤荷試驗四方面進行了深入討論;本文作者根據多年現場荷試驗的工程實踐,對深井荷試驗置的核心部分? ?反力置,設計了側壁支撐反力加系統,該加系統具有實用、簡便、穩定及安個等優點。
  2. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚解決的一些問題,並對支盤樁的前景進行了展望。
  3. The unmounted image can then be optionally compressed

    然後, (未裝載的)映像可以進行壓縮。
  4. To open the file, pls instell adobe reader

    本簡介需以adobe reader開啟,如請按圖下
  5. Plug - in s classloader causing the log plug - in to be activated if not already

    插件的類器對其進行解析(可以激活尚激活的log插件) 。
  6. Future uavs will carry other weapons, such as air - to - air or anti - radar missiles

    來的無人機將其它武器,如空對空導彈或反雷達導彈。
  7. Road crews are loading trucks with sand and anti - freeze chemicals, which they will apply to icy roadways as needed in the hours ahead

    路障工作人員正用卡車沙子與防凍劑,並用此鋪設路面,保證來幾小時內重要路段的暢通。
  8. This paper sets up the concept of the proportion of unloading and the relative proportion of unloading, sets up a mathematical pattern for the using of the packing materials on the base of the relative proportion of unloading. meanwhile we can design the packing dimension of the compressive wood piece, and it points out that per unit loading of the track pattern packing plan is the largest. the proportion of per loading has increased by 116. 6 % over that not compressing, and 30. 64 % over cylinder packing

    本文建立了空率和相對空率的概念,並利用相對空率,對包物的材料利用程度建立了一種數學模型,提出了計算方法,同時據此設計木片壓實袋打包尺寸,指出跑道形包方案的單位量最大,與壓縮袋相比提高單位率116 . 62 ,與長方體袋相比提高單位率30 . 64 ,並可以充分利用c60火車的額定運能力。
  9. Uncompressed jar files can generally be loaded more quickly than compressed jar files, because the need to decompress the files during loading is eliminated, but download time over a network may be longer for uncompressed files

    壓縮的jar文件一般可以比壓縮過的jar文件更快地,因為在過程中要解壓縮文件,但是壓縮的文件在網路上的下時間可能更長。
  10. Higher order path supervisory unequipped temination

    高階通道監控未裝載終端
  11. Lower order path supervisory unequipped termination

    低階通道監控未裝載終端
  12. Lsut : low - order path supervision unequipped

    低階通道監控未裝載終端
  13. Higher order path unequipped hp - uneq

    高階通道未裝載
  14. Lower order path unequipped lp - uneq

    低階通道未裝載
  15. Supervisory unequipped signal

    監控的未裝載信號
  16. Visit the state capital, red rocks amphitheater and coors beer, where you can have free sample of the beer before it is capped ; continue the tour to the eisenhower johnson memorial tunnel, is the highest vehicular tunnel in the word

    上午游覽丹佛市區,參觀州政府金頂及紅巖露天搖滾樂劇場。中午前往世界上最大的啤酒廠coors beer ,參觀啤酒製造過程,並可免費嘗試一下瓶前的味道,真是千難逢的機會。
  17. A blacklist of stolen, unregistered, unpaid, illegally parked and traffic offenders are loaded before the patrol commences their shift

    他們在開始巡邏之前將被竊取的,登記,付,非法地停放的和交通違者黑名單在系統中。
  18. With grid computing, if the system housing the application is unusually busy, the application may run on an idle or underutilized system that is part of the grid

    如果了該應用程序的系統異常繁忙,那麼利用網格計算,應用程序可以在格網中空閑的或充分利用的系統上運行。
  19. The portal allows a single administrator to see how data is being loaded on these devices and to shift data from overutilized to underutilized devices without disrupting the way in which applications access the data

    這個門戶允許單個管理員看到數據到這些設備上的情況,並將數據從過度使用的設備上轉移到充分使用的設備上,同時不會干擾應用程序訪問數據的方式。
  20. Setup found existing uninstall files on your computer

    程序發現有的文件。
分享友人