材料試驗機廠 的英文怎麼說

中文拼音 [cáiliàoshìyànchǎng]
材料試驗機廠 英文
material testing machine plant
  • : 名詞1 (木料) timber 2 (泛指可以直接製成成品的東西; 材料) material 3 (供寫作或參考的資料) ma...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : machineengine
  • : 廠同「庵」 (多用於人名)
  • 材料 : 1. (原料) material 2. (資料) data; material 3. (適于做某種事的人才) makings; stuff
  • 試驗 : trial; experiment; test
  1. Tera xtal s release of 4 - inch product is well timed to meet the higher market demand stemmed from the wide - adoption of cellular phones in the developed and developing countries. with guidance from prof. yu huang of national tsing hua university s crystal growth laboratory, the crystal growth team at tera xtal first gained invaluable experience over the past 8 months by using the garage - version of a crystal puller in countless test growth trials of 3 " lithium tantalate crystals

    透過清華大學科學中心單晶成長實室負責人黃瑜教授與日本、中國大陸兩地長晶專家的交流與指導;兆晶科技的長晶團隊採用自製的長晶實臺,經過無數次三英寸鉭酸鋰拉晶與設計改善,委由國外商改造制式量產臺費時六個月為兆晶科技製作出第一臺四英寸單晶爐。
  2. In this paper, taking one of the special processes - chromic acids anodizing for example, such administration methods as the key points control and the quality performance administration system for surface treatment process have been setup by process analysis and key points seeking. as for the complicacy of the quality control on metallurgical special processes and the huge statistic data, the quality information system of surface treatment have been established on the bases of computer database. this paper brings out the systematic evaluation way to setup reception test items by taking the reception test results as evaluation basis and sampling statistics as rules

    本文以鉻酸陽極氧化表面處理工藝為研究對象,通過工藝技術分析、尋找關鍵特性、建立對關鍵特性的控制等工作,研究建立了表面處理工藝動態質量管理系統;針對冶金特種工藝質量控制的復雜性及統計數據量大等特點,建立了以計算數據庫管理為基礎的表面處理信息及處理系統;為解決冶金特種工藝原任務重的困難,建立了以原結果為評價基礎,以抽樣統計方法為依據的原項目優選系統等。
  3. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 5 : dry bulk weighing dosing machine. substance weighing test

    道路建設及維護設備.生產連續配製設備的現場校正及檢.第5部分:干重計量.重量
  4. Manufactures leak detectors, load cells, pressure cells, lvdt, displacement transducers and torque transducers

    -生產拉力沖擊的專業家。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原和耐久性優化研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原和耐久性優化研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電組的科學研究。
  7. This paper presents an investigation on a new type of rubber damper, that is, a rubber damper with honeycomb structure. the honeycomb structure will enhance the energy dissipation of a rubber damper and as a result increase the damping of the damper. the performances of honeycomb dampers are experimentally tested by a test rig. the results show that the diameter and the density of holes of the honeycomb structure are important parameters in the design of the damper. for a damper of given size, there are optimum values of both parameters with which the damper provides highest damping. additionally the honeycomb structure does not change the correlation of damping to frequency. a practical honeycomb damper is designe d and applied to inlet pipe of a screw compressor in a petroleum factory for vibration reduction. the vibration of the pipe is obviously suppressed by the damper, at least 25 %

    本文採用理論分析和實相結合的方法,研究了蜂窩孔這種結構因素對橡膠阻尼阻尼性能的影響。在自行設計、製作的懸臂式阻尼測裝置上,對蜂窩式橡膠阻尼器的阻尼性能進行了大量的實,初步找出了蜂窩孔孔徑、孔數以及預壓縮量等因素與阻尼器阻尼性能的關系。本文利用實研究的結論,設計了一種專用的蜂窩式橡膠阻尼器,並應用於某螺桿壓縮進口管道的減振,取得了明顯的減振效果。
  8. In this paper, the state - of - the - art on the investigations is summarized and the theoretical system framework of the research contents on green design & green manufacturing is brought forward. and mechanism of pollution emerging in different processes is analysed on the basis of practical processes of production of ck7525 numerical controlled machine tool made in changzhou machine tool general works. applying the theoretical system framework of the research contents on green design & green manufacturing, the slide rail of machine tool is carried on design for disassembly and the lubricate oil way and packing are carried on design for recycling

    本文在總結國內外現有研究狀況的基礎上,建立了綠色設計與製造的研究內容理論體系;並依據常州床總ck7525數控床的實際生產過程,分析在不同加工過程中污染產生的理;應用綠色設計與製造的理論體系對床的導軌進行可拆卸設計、潤滑油路和包裝可回收性設計;對綠色鑄造粘結劑、綠色熱處理工藝、干切削刀具選用進行分析;應用泛環境函數和金屬環境負荷評價模型對床的主要進行生命周期評價。
  9. The paper introduced hardware configuration and software design idea of computer measurement and control system of the automatic punching test machine, described store structure, module structure, major function of system in detail and showed program flow chart of major function module

    摘要針對某生產家的系列沖擊設備配套,設計開發了「自動沖擊計算測控系統」 。
  10. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 4 : dry bulk weighing dosing machine. belt sampling test

    道路建設及維護設備.生產連續配製設備的現場校正及檢.第4部分:干重計量.傳動帶抽樣
  11. Manufactures conductivity, solution concentration, ph, redox and dissolved oxygen instrumentation for industrial applications

    -從事各種油漆塗塗裝等檢測儀器,生產的專業家。
分享友人