松軟地層 的英文怎麼說

中文拼音 [sōngruǎndecéng]
松軟地層 英文
broken groundloose ground
  • : Ⅰ名詞1 (松樹) pine 2 (絨狀或碎末狀食品) dried meat floss; dried minced meat 3 (姓氏) a surn...
  • : Ⅰ形容詞1 (質地不硬) soft; flexible; supple; pliable 2 (柔和) soft; mild; gentle 3 (軟弱) we...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. Touke sandstone and shale stratum. this stratum has a very soft, loose structure, and this is why the badlands terrain is especially well developed here

    左鎮鄉的主要為頭?山之砂巖與頁巖所構成,由於質特別,惡形也特別發達。
  2. Luckily, the soil was dry and crumbly. " i wanted to live ; the instinct was strong. i was about a metre deep

    由於土乾燥,加上頑強的求生本能,他從下一米處為自己扒出了一條生路。
  3. Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price

    我們公司是專門供應各種終端塊,交換機測試雙重座,面座,保險絲座,三傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,解錨索關系自鎖式電纜接頭,光纜標記關系,管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,自粘配合摩,螺旋帶包,導線連接器,線纜配合固定座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,預終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍索腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,自粘配合固定座,擴大釘,螺旋帶包螺桿導線連接器,銅接線端子,預絕緣電工工具,電線接頭,電纜接頭固定座,尼龍拉鏈,尼龍關系,電纜終端,預終端絕緣,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越的產品和最好的服務,具有競爭力的價格
  4. Casing damage mechanism analysis in soft formations

    松軟地層套管損壞機理分析
  5. Application of compound soil - nailed wall to foundation pit in soft soil

    松軟地層中基坑工程的復合型土釘支護
  6. Moist dark chocolate sponge filled with layers of real coffee whipped into cream

    濕潤的黑巧克力填充在咖啡里。
  7. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、質情況復雜,表淤泥質土及粘土較厚,基巖頂面起伏較大,且存在斷裂構造,土具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形下連續墻結構,並獲得成功。
  8. To improve the bearing capacity in varying ground conditions, soft spots are usually filled with consolidated hardcore or a weak concrete, before the foundation is laid

    為了在不同的基條件下提高基礎的承載力,在澆注基礎前,通常用碎石墊加固或用強度低的混凝土來填充土質方。
  9. Hard strata transmit shock waves more efficiently than loose earth

    堅硬的巖傳播震波的效率比的土壤高。
  10. The data from xinbi high - slope shows that it ' s a stable slope. 3. the result of elasto - plastic finite element analysis shows that : ( 1 ) excavated - slope face would induce loose belt in rock ; ( 2 ) horizontal ground stress, joined rockmass and weak sandwich would make great unfavorable influence on slope stabilization and axial force of rock bolt

    有限元數值分析結果表明:邊坡的開挖會使坡面巖體產生動帶;構造水平應力、結構面、弱夾對坡體穩定及支護在坡體上的錨桿的受力情況有較大的不利影響。
  11. Clock tower was built in 1173, designed for vertical construction, but the project is due to start soon after the foundation and the soil soft and uneven toward 1372 completion, minus its tilt to the southeast

    鐘樓始建於1173年,設計為垂直建造,但是在工程開始后不久便由於基不均勻和土而傾斜, 1372年完工,塔身傾斜向東南。
分享友人