板層砂巖 的英文怎麼說

中文拼音 [bǎncéngshāyán]
板層砂巖 英文
flags
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 名詞(沙子) sand; grit
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地為三疊系雜谷腦組二段大理和三疊系雜谷腦組三段的。在勘探過程中,發現左岸壩肩大理體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地,為此壩基的防滲成為重要問題。
  2. Based on the bedding features of weak intercalations in sandstone plates near the top of underground cavity, the probable failure scale of bedding sliding, the probable settlement, the folding places and the critical length of sandstone beams are computed seperately, then the stability of underground cavity is analysed

    針對地下工程頂部中存在順發育軟弱夾的情況,分別對開挖后可能出現的間滑動破壞范圍、的沉降、折斷和臨界長度進行計算,並分析其穩定性。
  3. Main factors and mechanics influencing water inrush from roof snadstone

    影響徐州礦區煤涌水的主要因素及機理
  4. In the thesis, sand packed glass plate model was applied to physical simulation of the macroscopic throats forming mechanism, studied effects of these factors as sedimental characteristics, petrophysical property, production process etc. on the forming of macroscopic throats

    摘要動用填玻璃模型對疏鬆大孔道形成機理進行物理模擬,探討了沉積特徵、油物性、開發過程等因素對大孔道形成的影響,歸納了大孔道形成的因素模型及大孔道形成過程中的產量壓力特徵。
  5. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面堆石壩壩基處理和防滲的原則及設計要點.趾基礎和堆石體各區礫石基礎開挖,除趾與其下游1 / 9底寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基外,其餘部分均予以保留.斷破碎帶處理,趾部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面堆石壩的設計和研究提供參考與借鑒
  6. In order to optimize the parameters of running top coal under different coal and gangue fragmental size, on the basis of measuring and analyzing the distribution character of top - coal fragmental size, running top coal was studied for the coal seam with dead - unconsolidated thin sandstone roof by loose medium model experiment

    摘要為了優化不同煤矸塊度條件下的放煤工藝參數,在實測分析頂煤破斷塊度分佈特點的基礎上,採用散體模型試驗的方法對煤為極鬆散細條件下的放煤工藝進行了研究。
  7. Experimental study on mechanical character of sandstone of the upper plank of coal bed under high temperature

    高溫狀態下力學特徵試驗研究
  8. The porosity of slate is better than silty sandstone because interformational pores, fractures and micro - fractures are developed in the slates

    相對粉的孔隙度高,究其原因,主要是間孔隙、裂隙及微裂隙發育。
  9. Analysis and prevention measures of mine roof sandstone flood in panji - xieqiao mining area

    潘謝礦區煤水害分析與防治措施
  10. Mechanical characteristics and cracking mechanism of coal roof sandstone under high temperature

    在高溫下的力學特性及破壞機理