板橋區 的英文怎麼說
中文拼音 [bǎnqiáoqū]
板橋區
英文
itabashi, tokyo-
Wherethe long bridge deck within 0. 5 l amidships is regarded as strengthdeck, the midship section modulus and minimum thickness of the deckplating comply with the requirements of 2. 2. 1 and 2. 4. 2. l of this ischapter
例1 :在船中部0 . 5l區域內的長橋樓甲板作為強力甲板時,其船中剖面模數及最小厚度應滿足本章2 . 2 . 1及2 . 4 . 2 . 1的要求。Based on the destructive test of certain old pre - stressed concrete hollow slab after structural strengthening by cfs, the destructive mechanism and ultimate bearing capacity of old pre - stressed hollow slab after structural strengthening is being researched, which is useful for the strengthening design of old bridge and solvating of single slab problem
摘要通過某已使用10年的舊橋預應力混凝土空心板受拉區碳纖維布加固后的破壞荷載試驗研究,對受拉區加固后的舊橋預應力混凝土空心板的破壞機理、變形性能及極限承載能力等進行了研究,為舊橋預應力混凝土空心板的加固設計及單板受力問題的分析解決提供了試驗依據。After eight years of construction, the banga to banggio ( panchiao ) underground railway replaced the original above - ground railway and made its first run today, in an attempt to revitalize the banga business community and tourism
施工八冬了后,艋?到板橋耶火車改做地下鐵路了后今阿日開始運作,倘好載卡儕郎客來艋?舊社區交關及去龍山寺燒香。The mass of the slab have diseases in varying degrees by investigation, so the problem faced us is to strengthen and remake the slab. in addition, the slab will be used in underdeveloped region of our country. therefore, it is very important to evaluate the load bearing capacity of slab with slightly curved bottom
微彎板在橋梁中使用已有三十多年,在調查中發現大多微彎板都存有不同程度的病害,也就面臨著對舊橋微彎板的加固改造的問題;另外,在我國某些經濟尚不發達地區的橋梁建設中仍在採用,因此,對微彎板的承載力的正確評定也顯得十分重要。Establishing in 1999, chongqing yixin composite material ware limited corporation is located in banqiao industrial area of chongqing city, specialized in researching, development, and producing of smc products, and providing after - sale services as well
重慶益鑫復合材料製品有限責任公司成立於1999年,位於重慶板橋工業園區,專業從事smc片狀模塑料產品的科研、開發、生產及售後服務。Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc
完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。Works by 55 japanese artists beyond the historical periods are exhibited at random
,在這樣主題的基礎上,板橋區立美術館將展示所收藏的數件豐富藏品。A ceremony was held on the day before the opening at a specially arranged venue in itabashi ward that was attended by a large number of local residents despite the rainy weather
開通的前一天在板橋區特設的會場舉行了典禮,盡管是雨天,有很多當地居民參加。Fatigue test of tensile anchor plates in cable - beam anchorage zones for zhanjiang gulf bridge
湛江海灣大橋錨拉板式索梁錨固區疲勞試驗Consequently time and cost can be saved greatly. ( 3 ) design method for controlling cracks in the negative moment zone of the continuous composite girder the crack mechanism of the concrete deck in the negative moment zone of the coniinuous composite girder, the relationship between the crack and the int
分析認為,採用中間支點升降法與調整混凝土板施工順序相結合的施工方法,不僅可以避免負彎矩區混凝土裂紋,還可以合理調整鋼梁和混凝土板的內力,並使端支點與中間支點反力更均勻,使組合梁橋的結構更加經濟合理。As soon as the tunnel boring machine advances 1m forward, 6 pieces of pre - cast concrete segment are fabricated and forming a ring with internal diameter of 5. 6m to support soil outside, while simultaneous back - filling and 32 - hole chemical grouting injector equipment installed with tunnel boring machine consolidating soil instantaneously to enhance the soil strength. the tunnel boring machine is also equipped with guided top gyroscope and true circularity retaining device for construction accuracy
其中值得一提者,板橋土城線所採用之潛盾機系新型之土壓平衡式機種,具同步背填灌漿之功能,對地表沉陷之控製成效優良,目前已貫通並通過民房及商業區下方之下行隧道其初期沉陷均控制在5mm之內,二次沉陷及最終沉陷平均總量最大亦僅18mm ,遠優于初始設計的警戒值30mm 。Hongqiao new town is one of the top - grade district of the most mature communities, with garden of bridish style, all the house - club facilities available ! !
虹橋新城為長寧板塊最成熟和高檔的社區之一,英式風格的園林設計,泳池會所應有盡有! !Draw some valuable conclusions by the calculation analysis of the anchorage zones of cable support tower and beam, and the steel mix joint part of of the road bridge surface, which will have some instruction meaning and reference value to the design and construction of the anchorage zone of the similar bridge
通過對天興洲大橋的索塔錨固區、索梁錨固區以及公路橋面板的鋼混結合段的計算分析,得出一些有價值的結論,對今後同類橋型錨固區的設計、施工具有一定的指導意義和參考價值。The emphases of the research works of this thesis are laid on the mechanical performance of the shear connector of the continuous composite bridge, the crack status and design method for crack control of the concrete deck in the negative moment zone of the continuous composite bridge, the influence of the connecting rigidity and the construction method over the structural mechanical characteristics of the continuous composite bridge, and the force transmission mechanism and the stress distribution of the rigid node connecting the girder and the pier in the mixed bridge and so on
其中重點研究了組合結構橋梁中剪力鍵性能,負彎矩區混凝土板裂紋狀態及控制裂紋的設計方法,鋼與混凝土的接合剛度和施工方法對結構受力特性的影響,以及混合結構橋梁中梁墩剛性連接的傳力途徑及應力分佈等。The a / d and cap circuits on dsp sample the voltage and current signals coming from the signal sampling circuit and the speed signal of the motor respectively. the " dead time " register of the dsp prevent directive - through of the igbts on the up and the down bridge arms
利用dsp上的死區寄存器設置ipm驅動信號的死區時間防止上下橋臂igbt的直通;利用板上集成的a / d轉換器採集經過板級外圍電路處理的電路信號;利用板上的捕獲單元cap採集通過轉速計的輸出從而得到電機的轉速。分享友人