板面設計 的英文怎麼說

中文拼音 [bǎnmiànshè]
板面設計 英文
panel design
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道路資料為主,從實際出發,結合理論算,對重載標準進行了詳細的討論,分別給出了水泥混凝土路與瀝青混凝土路的重載標準了;同時,通過大量的水泥混凝土底應力算,推導出了混凝土荷載與底應力水平的關系式;給出了水泥混凝土路與瀝青混凝土路的交通分級;通過對試驗路各結構層進行承載測試,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有水泥路中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模量的修正公式。
  2. An aptrix tag is replaced by an equivalent connect tag in a presentational template page design for the component to be cached or dynamically rendered un - cached

    在為緩存的或動態表示(不緩存)的組件顯示的模(頁)中,使用等價的connect標記替代了aptrix標記。
  3. Again we take an imported 500 kw engine unit as the example. in this case baffle boards are stuck on walls inside the engine room, meanwhile baffle boards are also used as suspended ceilings. by doing so not only the amount of insulated sound of the fender structure is increased, but the reverberant sound in the engine room is also depressed ( normally by 3 to 5db )

    我們仍以一臺500kw進口機組為例,油機房室內墻為貼吸音,同時用吸音吊頂,經過這樣的吸聲處理后既增加了圍護結構的隔聲量,又可降低油機房內的混響聲,一般可有3 ~ 5db ( a )的效果。
  4. The first part : to summarize the significance and importance of the chinese multimedia writing ' s design

    第一部分:從四個方概括了語文多媒體對語文教學的意義和作用。
  5. With the material dynamic constitutive equation including damage and the effect of stain rate the predictable formula about ballistic limit velocity of fiber composite target. secondly based on the damage feature about ceramic / fiber composite target caused by impact load, analysis model about defense performance of ceramic / composite material target is formed and the predictable formula about ballistic limit velocity is also given. lastly using the reflection and projectile theory of stress wave the paper discusses the design of ceramic / composite material target, optimizes the design of double layer ceramic / composite targets, gains optimal coefficient under certain area density and discusses the variety relationship of area density and thickness with optimal coefficient u nder some ballistic limit velocity 3

    首先,分析了纖維類正交鋪層復合靶在沖擊載荷作用下的損傷破壞機理,結合包含損傷和應變率效應的材料動態本構方程,建立了纖維復合材料彈道極限速度的預測公式;其次,根據陶瓷/纖維材料復合靶在沖擊載荷下的破壞特點,建立了陶瓷/復合材料靶抗彈性能分析模型,給出了彈道極限速度預測公式;最後,利用應力波反射和透射理論討論了陶瓷/復合材料靶問題,對雙層陶瓷復合靶的優化進行了分析,給出了在一定密度下的最佳優化系數,討論了一定彈道極限速度下的密度和厚度隨優化系數的變化關系。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Calculation of temperature stress coefficient on board thickness design of cement concrete pavement

    水泥混凝土路的溫度應力系數
  8. Standard test method for nonrepetitive static plate load tests of soils and flexible pavement components, for use in evaluation and design of airport and highway pavements

    用於公路和機場路和評定的土壤與韌性路成份的非往復靜立平荷載的標準試驗方法
  9. Design of control angle measure on interface equipment of real - time simulation system for the excitation regulator

    實時勵磁模擬系統介裝置中控制角測量模
  10. According to the new concrete code, the calculation formula are put forward concerning the load - carrying capacity during construction, the load - carrying capacity of cross - section bending, longitudinal shearing, the inclined - section shearing and part shearing during the application of the continuous composite floor slab, which provide the design proofs for the continuous composite floor slab

    摘要根據新混凝土規范,給出了連續跨壓型鋼與混凝土組合施工階段的承載力算公式及使用階段的正截抗彎承載力、縱向水平抗剪承載力、斜截抗剪承載力和局部抗沖切承載力算公式,為連續組合樓提供了依據。
  11. In the design of this project, the author has participated in the following works : the system design, chips selected, and making schematic circuit diagram of the interface hardware, and pcb design 、 debug, and the fpga control - program design, system testing and debugging, and some drivers of wince. this paper will introduce the principle of the dvb - t series standards firstly, then the sketchy design of the system will be stated

    本人主要從事系統,接收硬體原理圖及印製電路( pcb )製作並調試, fpga控製程序, wince部分驅動程序開發和系統聯調等工作。本文在介紹數字地電視廣播( dvb - t )相關標準的基礎上,闡述了系統總體,軟硬體實現具體方案與原理
  12. In the thesis, based on design and implementation of the two signal processing system of different requirement, multi - dsp processor structure, dsp - pci interface, system control logic, pci device driver program, user application program are researched. the main content is list as follows : 1 ) according to the lfmcw radar signal processing algorithm, a signal processing system based on pc104 - plus bus is developed

    本文通過對以上兩種雷達信號處理機的開發過程,研究了採用多片dsp信號處理器組建并行處理模塊實現信號處理演算法的方法,利用pci總線實現處理機數據傳輸介備驅動程序和控制界軟體開發,實現信號處理機數據傳輸控制等幾個方的內容,主要工作如下: 1 )針對線性調頻連續波雷達信號處理演算法,完成了基於pc104 - plus總線的嵌入式信號處理、製作以及調試。
  13. Nlidb is thespecificapplicationofnaturallanguageprocessingtechniqueindatabasefield. the traditional methods of nli designing include pattern - matching, syntax analysis, semantic grammar, and intermediate representation languages

    自然語言介的傳統方法包括模匹配、句法分析、語義語法和中間表述語言等。
  14. It consists of two part, the one is hardware : integrating the system of the arc welding robot ' s hardwares and its working principles, separating and extracting the original system ' s control signals, designing the control system openly and its working principles, constructing the structure and principle of the motion card based on dsp, designing the telecontroling teaching box or control panel of touching screen based on usb interface, applying for some software and hardware measures on control system ' s anti - jamming ; the other is software : putting forward the three levels opening software structure model of arc welding, comparing the opening of software structure model between osaca and ours, putting forward the solutions of the pri and communication among the threads of software system ' s modules, using the dll ' s techniques to solve software ' s module design and putting forward the frame codes, bringing forward the path planning software ' s realization by cp + ptp mode, discussing the real time of windows2000 operating system and advancing its solution

    具體包括,硬體部分:弧焊機器人硬體整體系統集成及其工作原理,原系統控制信號的分離和提取,控制系統的開放式及組成原理,基於dsp的運動控制卡結構和原理,基於usb介的觸摸屏式遙控示教盒控制,系統抗干擾的軟、硬體措施;軟體部分:提出了弧焊機器人的三層開放式軟體結構模型,軟體結構模型與osaca的模型進行開放性比較,給出軟體系統各模塊線程間優先級和通訊的解決方案,使用動態鏈接庫技術實現軟體模塊化並給出了框架代碼,給出了cp + ptp方式的軌跡規劃軟體實現過程, windows2000操作系統實時性問題的討論及解決方案。
  15. Nonlinear constitutive relations are discussed for analyzing the stress distribution, the appearance and development of the cracks, as well as the behavior of the boundary conditions of the two way slabs respectively. in the light of the experimental research on r. c. two way slabs under static loading, the behavior of yield line, the load deformation curves and the crack yield, plastic limit loads of slabs with different supporting conditions are studied

    根據反映雙向混凝土材料非勻質性的本構關系,分析了雙向在荷載作用下的變形、屈服、裂縫和破壞的形態特性,並對鋼筋混凝土雙向在不同支承條件下的塑性極限荷載、正常使用撓度(曲線)和截作了進一步研究。
  16. The 8 small tall buildings and 4 flat panel style residential buildings are combined together naturally and freely ; the erect outside face design is vogue and simple ; the building qualities are clear and quick ; the household design is good for light reception, and appropriate for actions and calmness

    小區8棟小高層和4棟低層式住宅自然流暢組合,時尚簡約的外立,明快的建築氣質,戶型採光通透,動靜皆宜。
  17. Outer dimension : w600 d420 h1004, including 6 drawers, there is drawer divider at its top, also its panel with mirror surface

    外形尺寸: w600 d420 h1004由六個抽屜組成,最頂一個抽屜里帶格子架,附帶鏡
  18. Abundant drafting tools point, line, plane, simulating the manual pattern making to accomplish the patter faster

    豐富的打樣工具點線,模擬手工打方式,快速完成
  19. Responsible for design resources integration, project positioning, design management and construction management and coordination for pre - decorated properties

    負責公司全裝修項目的資源整合,項目定位,全裝修樣和施工管理,全裝修項目大積施工過程配合和協調。
  20. This book mainly presents in a shop the facade design and approach, entrance design ; wall design, transparent partition design ; light wall and luminous ceiling design ; small garden, container garden design, display design, water design, tool shed and gadget design in japan

    這本書主要展示了日本店的正和方法、入口;墻壁、透明的分區;亮墻壁和天花;小花園及室內花園、展品、水源、工具舍和小器具
分享友人