  1. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文試件的各組成構件為:非預邊梁預梁板框柱組合空間試件,各組成構件的構造參照了現行《 gb50010 - 2002混凝土結構計規范》及《 gb50011 - 2001抗震規范》的有關規定,以檢驗規范及計條例能否適用於該特殊結構形式。
  2. The article adopts theories such as stress - focus to calculate the structures stress ; the assembly stress and the product conditions are the keystones of production ; whether expediently replace glass in the field and damnify framework are considered in servicing ; the new lifesaving way the request which proposed to the cabin design mainly considers the access cabin overall rigidity

    分析主要採用集中等理論對結構進行計算;生產過程主要考慮裝配和生產條件;維護主要考慮是否利於外場更換玻璃和更換玻璃對框的損傷;新救生方式對艙蓋計提出的要求主要考慮艙蓋整體剛度。
  3. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎及節點的搭,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  4. At first, according to the concrete requirement of the servo control system, a collective scheme, which provide guarantee to meet the requirements of the global performance, is established. in this scheme, the structure of gimbal and the torque motor driven mode are adopted, and angle measurement is accomplished by inductosyn and velocity measurement is accomplished by dynamically tuned gyro respectively

    首先,根據目標真值測量備伺服系統的具體要求,確定了地平式常平結構,矩電機驅動,分別採用動調諧式速率陀螺儀及圓盤式感同步器作為速率及位置反饋元件這一總體方案,為伺服系統滿足整體性能指標要求提供了保證。
  5. Product introduction : " beifang neoplan " luxury coach series is designed and manufactured after introducing the whole set of technologies, key equipments and fixtures of the neoplan company of germany. with 12meters long prestressed envelope body, with monocoque and space frame, rear - mounted water - cooled engine, air spring suspension, elevating coach body, separate suspension fore axle, 2f power - assisted steering system, 11m3 luggage compartment, external swinging automatic door, warm and cool air conditioner, large complete rubber - laminated windshield, abs system

    產品簡介: 「北方-尼奧普蘭」系列豪華客車是我廠引進德國尼奧普蘭公司全部技術關鍵備,夾具計製造的具有世界先進水平的系列豪華客車,具有12米長預蒙皮車身,無大樑全承載式車,後置水冷發動機,空氣彈簧懸掛可升降式車身,獨立懸掛前橋, 2f助轉向系統, 11立方米行李倉,外擺式自動車門,冷暖氣空調,大型全幅夾膠前風擋玻璃, abs系統。
  6. This paper introduces the developing tendency of the space structure and the application of the pretensioned space lattice structure, summarize the analysis method and relation between lattice structure and pretensioned space lattice structure. dissertate the space pole - truss displacement method, tendon working principle, set forth the method of optimal design and whole process design. includes the use stage design and construction stage design of pretensioned space lattice structure

    本文首先介紹了空間結構的發展趨勢及拉索預空間網格結構的用情況,概述了網格結構與拉索預空間網格結構的分析方法及其相互關系,論述了空間桿系桁位移法,拉索作用機理,闡述了拉索預空間網格結構的優化計及全過程計的計方法,包括拉索預空間網格結構使用階段的計和施工階段的計。
  7. Meanwhile, according to the reduced theoretic of the open - web truss, the strength simplification computational method are proposed, and in comparison of the theoretical calculating value with the tested one and the behavior analysis of the tested beams during the process, the hypothesis and the theory of the beam are verified and the stress distribution of the circular hole castellated beam is also obtained

    通過費氏空腹桁簡化計算理論值與實測值的對比分析以及對試驗梁在試驗過程中的性態分析,驗證了理論計算及各項假的正確性,分析得出圓孔蜂窩梁圓孔周邊分佈特徵;並通過撓度分析,提出了實用的簡化計算式。
  8. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層結構中採用迭層空腹桁結構.首先分析了其受性能,得出了空腹桁各構件合理的截面剛度以及布局形式.然後結合一實際工程,進行了兩榀迭層空腹桁轉換結構模型( 1 : 8相似比)的豎向荷載下靜試驗以及擬動試驗.其中一榀為普通混凝土迭層空腹桁,另一榀配置了預和鋼骨混凝土,對比分析了兩模型的層間位移比、骨曲線以及等效粘質阻系數等抗震性能的比較,並進行了彈塑性動分析.試驗和分析結果表明,配置預和型鋼混凝土的迭層空腹桁轉換結構具有良好的抗震性能,可以成功地解決迭層空腹桁作為轉換層結構所產生的弊端問題,最後對這類轉換層結構提出了相計建議
  9. This thesis first comprehensively introduced the domestic and international present research state and the development trend of the fem ( finite element method ) in the city bus design and the stress analysis research. it elaborated the application of the fem in the strength and stress concentration analysis of the bus body frame. the domestic research started later than abroad lags behind now, so we need to expedite the research speed to catch up the level of the international research

    本文首先較全面地介紹了國內外客車計與分析中用有限元法進行研究的現狀和發展趨勢,論述了有限元法在客車車身骨強度和集中分析中的用,並闡明國內起步較晚所以與國外研究水平存在一定的差距,需要加快研究速度迎頭趕上。
  10. This article provides the reference for the application of partially prestressed concrete frames with unbonded tendons in earthquake area

    本文的研究為無粘結部分預混凝土框在地震防區域的用提供參考。
  11. Our main products have j53, j54, j93, j67, j69 series double - disc friction screw press, brick press, series j55 clutch type screw press, mp high speed forging press, as well as the product repair and the spare parts manufacture, and carry on the user special request of the press, the brick press non - standard design and the manufacture. the company strengthens to the new product technology development, fetch in the world most advanced company technology to transform the 630 tons above specifications heavy press. j53 - 1000c, j53 - 1600c, j53 - 2500c, j53 - 4000c, j53 - 6300c series press and j54 - 1000c, j54 - 1600c, j54 - 2500c series fine press, j93 - 1000c, j93 - 1600c brick press rapidly seizes the market by its reliable performance

    公司加強對新產品技術開發度,引進世界最先進的雙盤磨擦螺旋壓機製造企業德國哈森公司技術,對630噸以上規格的重型壓機進行改造計,計與製造的630型至6300型分段機身四拉桿予結構的壓機壓磚機,成為原整體機機的更新換代產品,其中j53 - 1000c型, j53 - 1600c型j53 - 2500型, j53 - 4000型, j53 - 6300型壓機, j54 - 1000c型, j54 - 1600c型, j54 - 2500c型精壓機, j93 - 1000c型, j93 - 1600c壓磚機以其可靠的性能迅速占領市場。
  12. Jiangyin bat metal product co., as a key enterprise of jiangsu bzt plastics group, is located in the beautiful and rich huashi town in yangtze delta area, enjoying aconvenient water and land transportation. the company, with total investment of rmb 300million, has modernized workshops and advanced equipments, including one 650 rolling unit and six 550 semi tandem finishing mill groups, the production lines, with high installation level and advanced techniques, have been ina leading position in china

    江陰蝙蝠金屬製品有限公司是江蘇蝙蝠塑料集團的骨幹企業,公司位於美麗富饒的長江三角洲江陰華士鎮,交通便利,水陸貫通。公司擁有現代化的廠房,備先進,總投資叄億人民幣,擁有650扎機一550半連軋精軋機組6,軋機採用高剛度的短線軋機。
  13. At last, formative process of teaching material could be established mainly through the training of chinese operation ability by manipulating setting constitution as frame and organizing definition of multiple outlines and essences

    最後,根據高職教育特點,認為教材建以語文操作能訓練為主線,以模塊組合為框,以多綱多本為特徵。
  14. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿拱支承結構的縱槽向地震效較小;吊桿式拱結構動特性取決于槽墩和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件連接和變截面處增梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  15. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    拱頂在核心土開挖后,在一定范圍內出現拉區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊工字鋼拱,使之與左右導洞拱頂工字鋼形成整體。
  16. Based on the results of experimental research, we can find that the construction method of joints zone are feasible and safe, the joints between concrete - filled steel tubular core columns and prestressed concrete beams have good ductility and good energy dissipation, and the concrete - filled steel tubular core columns can raise the shear strength of core area of joints and the bending strength of the column ends

    試驗研究發現,針對該節點所計的構造處理方式是可行的、安全的,鋼管混凝土核心柱與預混凝土梁框節點有著很好的延性和能量耗散能,由於柱為鋼管混凝土核心柱,大大提高了節點核心區的抗剪承載,同時也使柱端抗彎承載得到加強。
  17. In this paper, ansys, the software on finite element analysis, is made use of processing the static and modal analysis on the preliminary models and its " modified ones. by analyzing the results, we can conclude that the stresses on the components of the modified models are tended to equilibration and the location of the branches " brace can also influence stresses and translations on the branches. in addition, the values of the intrinsic frequencies on modified models " are larger than the ones on preliminary models, but the ranges of the frequencies on both models are almost same

    傳統的弧形閘門的支臂結構基本上都是三角式的,這主要是因為按平面體系進行計算的傳統計方法忽略了結構的整體性及弧形閘門的空間結構特點,計得比較保守,而實際上,將其改為a型結構也存在可行性,本文是利用有限元分析軟體? ? ansys對原模型及修改模型分別進行靜態和固有頻率的計算,通過分析比較其結果可知,支臂改為a型后會使閘門的整體受趨于均勻,即原模型受大的部件其變小,而原模型受小的部件其會變大;而且a型支臂的支桿在不同的放置位置對支臂的和位移變化也有一定的影響。
  18. The prestressed drainage aqueduct of through open - web truss arch structure is widely applied to cross the main canal of the mrp. it is important and significative to study the aqueduct ' s structure design and reliability thoroughly

    下承式空腹桁拱渡槽在總乾渠排水建築物中被廣泛採用,其結構計和安全可靠性是一個非常重要且值得深入研究的問題。
  19. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋計線形計算、吊索無長度計算、空纜線形與預偏量計算、絲股線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  20. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無長度控制、索鞍預偏量控制、錨跨張控制、絲股控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。