查勘費用 的英文怎麼說

中文拼音 [zhākānyòng]
查勘費用 英文
check fee
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 查勘 : survey; prospect; explore
  • 費用 : cost; expenses; outlay
  1. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的探手段(如高精度淺層地震探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程近5000萬元。
  2. Be in order to become independent the identity of the tripartite besides the insurance contract between insurance company and insurant, depend on professional technology and knowledge, act on mix objectively just manner, be its insurance mark to underwriter or insurant collection charge the person that caustic of survey, appraisal, appraise and reparations computation, palaver gives a proof

    是以獨立於保險公司與被保險人之間的保險合同之外的第三方的身份,憑借專業的技術和知識,本著客觀和公正的態度,向保險人或被保險人收取而為其保險標的的、鑒定、估損及賠款計算、洽商給予證實的人。
  3. Fc approved a commitment to upgrade part of 6gb to category a at an estimated cost of $ 104. 1 million in mod prices for the employment of consultants to carry out site investigation, schematic proposal, detailed design, contract documentation, environmental impact assessment and drainage impact assessment for the proposed expansion of kiosks and other facilities at lmc boundary crossing

    財務委員會批準開立承擔額,把6gb號工程計劃的一部分提升為甲級;按付款當日價格計算,估計為1億410萬元,以委聘顧問就建議擴建落馬洲跨界通道檢亭及其他設施的計劃進行地盤測工作、制訂建議計劃大綱、進行詳細設計、擬備合約文件,以及進行環境影響評估和排水影響評估。
  4. Pwsc endorsed a commitment to upgrade part of 6gb to category a at an estimated cost of $ 104. 1 million in money - of - the - day ( mod ) prices for the employment of consultants to carry out site investigation, schematic proposal, detailed design, contract documentation, environmental impact assessment and drainage impact assessment for the proposed expansion of kiosks and other facilities at lok ma chau ( lmc ) boundary crossing

    工務小組委員會通過開立承擔額,把6gb號工程計劃的一部分提升為甲級;按付款當日價格計算,估計為1億410萬元,以委聘顧問就建議擴建落馬洲跨界通道檢亭及其他設施的計劃進行地盤測工作、制訂建議計劃大綱、進行詳細設計、擬備合約文件,以及進行環境影響評估和排水影響評估。
  5. In the thirteenth year under the reign of the yongle emperor, after investigation and reconnaissance, chen xuan dug a 20 li - long river from the west of huai an city. the river channels off the water of guanjia lake into the huai rver. the river was named as qingjiangpu. along the river such four watergates as yifeng gate, qingjiang gate, fuxing gate and xingzhun gate were built to control the water level

    永樂十三年,陳?通過實地走訪,淮安城西鑿渠20里,導管家湖堤水至鴨陳口入淮,此河命名為清江浦,河上遞建移風清江福興新莊四閘,以便調節水位,此後,漕船可直入黃河,節省了大量
  6. Firstly, seismic exploring databases are the base of the management, so a detail description is provided which some databases achieved in the past ninth five - year plan must be imported and surface layer database are built newly instead of traditional mode of recording and storing the data. secondly, according to the idea of gis ( geographic information system ), some query and display techniques are discussed, for example, the technique of visualizing user interface, the technique of controlling the order of a map, and the technique of searching for the database based on a seismic line

    從技術發展的角度看,盡管通過技術革新和技術改造,地震探野外採集採取了許多技術措施,例如,新的施工工藝,高性能的採集儀器,現場處理控制等,但目前的野外生產管理仍有沿幾十年來傳統的管理方式的現象,採傳統的文檔、圖紙,手工錄入這種管理方式,主觀性、隨意性較強,信息化程度低,管理水平不高,大量的時間被浪在數據、資料的管理和找上,由於沒有較好的技術手段,缺乏科學性。
  7. Article 18 prospecting, mining and various construction projects shall not occupy or occupy as little as possible woodlands ; in case of necessary occupancy or expropriation of woodlands, upon examination and approval of the competent forestry authorities under the people ' s government above the county level, the examination and approval formalities for land needed for construction shall be gone through in line with relevant land administration laws and administrative regulations ; and the land - use organization shall pay forest vegetation recovery expenses in line with the relevant provisions of the state council

    第十八條進行、開采礦藏和各項建設工程,應當不佔或者少佔林地;必須佔或者徵林地的,經縣級以上人民政府林業主管部門審核同意后,依照有關土地管理的法律、行政法規辦理建設地審批手續,並由地單位依照國務院有關規定繳納森林植被恢復
  8. With the development of embedded technology, all kinds of portable devices have being widely used in scientific research, consumer electronic, engineering, etc. in this paper, 3d laser distance meter based on embedded chip at91rm9200 is been devised and implemented to meet the application needs of traffic - accident investigation system and other engineering measurement in locale

    隨著嵌入式技術的發展,手持或便攜式設備越來越多的應於科學研究、消類電子、工程設計與實施等方面。為適應交通事故現場及其它工程現場測距的應需求,本文提出並實現了基於嵌入式arm晶元at91rm9200的三維激光測距系統,該系統具有便攜性、易升級、易擴展等性能。
  9. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有探手段難於事先明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
分享友人