柱式管架 的英文怎麼說

中文拼音 [zhùshìguǎnjià]
柱式管架 英文
pole type support
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 管架 : pipe frame; pipe support
  1. With the application of concrete - filled steel tubular member to mega - frame structures, the connection forms of main beam - column can be classified as welded rigid connection, bolted gemel connection and semi - rigid connection

    摘要隨著鋼混凝土組合截面日愈增多地應用於巨型框中,主框的連接形分為焊接剛性連接、螺栓鉸接與半剛性連接。
  2. Based on the results of experimental research, we can find that the construction method of joints zone are feasible and safe, the joints between concrete - filled steel tubular core columns and prestressed concrete beams have good ductility and good energy dissipation, and the concrete - filled steel tubular core columns can raise the shear strength of core area of joints and the bending strength of the column ends

    試驗研究發現,針對該節點所設計的構造處理方是可行的、安全的,鋼混凝土核心與預應力混凝土梁框節點有著很好的延性和能量耗散能力,由於為鋼混凝土核心,大大提高了節點核心區的抗剪承載力,同時也使端抗彎承載力得到加強。
  3. The newly completed hall of national agricultural exhibition center has a length of 152. 5m, width of 86m, exhibition hall area of 13, 000m2 and highest point of 15. 6m

    剛剛新建的北京全國農業展覽館?新館採用大跨度獨立基張弦結構,長152 . 5米,寬86米,展廳面積13000平方米,最高處達15 . 6米。
  4. ( 2 ) the paper uses two methods to analyse the falsework structure and then get the basic data to guide the construction and installation of the falsework in sliding construction. these data play an important role in practice

    ( 2 )基於扣件腳手設計規范、鋼框格構兩種方法對胎結構受力進行分析,進而得出能指導滑移施工中胎的構造及搭設的基本數據,其結果對工程實踐有重要的指導作用。
  5. Analysis the force on the falsework by comparison to three calculation methods, referring the designing standard steel tube scaffold of buckling element, lattice column of steel frame and the computer program of sap2000. the result provides strong guidance for practicing it

    基於扣件腳手設計規范、鋼框格構及sap2000程序等三種方法對胎結構受力進行分析、比較,其結果對工程實踐有重要的指導作用。
  6. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的鋼,通過腹桿及平聯形成鋼混凝土空間桁,拱上立亦採用鋼混凝土排,造型新穎美觀。
  7. This tug is made of steel, fore raked stem, transom stern, single bottom, single deck, transverse framing, double engines and double rudder propellers

    本船為鋼質前傾首方尾單底單甲板橫骨雙機雙轉動導
  8. This vessel is a steel tug with fore raked stem, transom stern, single bottom, single continuous deck, transverse framing, double engines and double vectorable ducted propellers

    24 . 30m本船為鋼質前傾首方尾單底單連續甲板橫骨雙機雙轉動導拖船。
  9. Therefore, the light steel portal frame system is compared comprehensively to the bent frame system of solid - web steel column and solid - web steel plate beam, the bent frame system of solid - web steel column and open - web steel pipe truss, as well as the system of rc column and open - web steel pipe truss

    因此對中小型單層廠房中實腹加實腹鋼板梁排體系,實腹加空腹鋼體系以及鋼筋混凝土加空腹鋼體系與輕鋼門進行了綜合比較。
  10. A seismic shear capacity equation for ductility and non - ductility columns is proposed to amount for the reduced shear contribution of concrete as to the increasing of displacement ductility levels. 6. the behavior of columns * transverse displacement within yield hinge regions is also discussed based on truss - arch model. 7. the seismic shear capacity design equation of columns with various ductility levels is proposed in statistic method on the basis of test data collected from japan and china to simplify the equation resulted from truss - arch model

    對國內外試驗資料進行了統計分析,詳細分析了剪跨比、軸壓比及配箍特徵值對框構件抗剪承載力的影響,得到了反復荷載下框塑性鉸區域極限承載力計算的統計公;在理論推導公及統計公的基礎上,參考國內外規范,首次品武;鋼筋混凝土框塑性鉸區抗剪承載力試驗研究及機理分析提出了鋼筋混凝土框塑性鉸區域剪切承載力抗震延性設計實用公
  11. Based on experimental research and theoretical analysis, investigations on the new type of joint are made systematically, the main contents and results include the following items. 1 four specimens of new joints between cfrt columns and steel beams are designed. by low - cyclic reversed load test, skeleton curves of new joints and shearing deformation in joint core area are studied, the influence of parameters, such as concrete cores, length of stiffener, and relative dimensions of column and beam, is discussed

    本文在分析現有節點方案特點的基礎上,提出了角鋼加勁節點方案,並採用試驗和理論分析相結合的方法,對這種新型節點進行了系統研究,主要研究內容與成果如下: (一)設計了4個新型方鋼混凝土?鋼梁節點的試件,通過對新型節點的低周反復荷載試驗,研究了新型節點的骨曲線和節點核心區剪切變形等,探討了內填混凝土、加勁肋長度和樑相對尺寸等對節點抗震性能影響。
分享友人