栓接的 的英文怎麼說
中文拼音 [shuānjiēde]
栓接的
英文
bolted-
The main scopes of this paper includes : ( 1 ) the species almost have good ductility, the major factors with gabled frames are same as steel structure
( 4 )單獨改變螺栓直徑來提高承載能力,使樑柱連接的延性降低,塑性轉角減小,而承載能力並沒有大的提高。With regard to the protection system of inorganic zinc - rich primer + epoxy micaceous iron oxide intermediate + polysiloxane finish having been used for major bridges for the first time and the anti - rust and anti - slip inorganic zinc - rich coating used for the bolted and welded surfaces of the bridges, the paper describes the protection system and coating workmanship in considerable details from aspects of the material properties, construction methods and coating inspection
針對在大型橋樑上首次應用的「無機富鋅底漆環氧雲鐵中間漆聚硅氧烷面漆」的防腐體系和栓接面採用的無機富鋅防銹防滑塗料,從材料特性、施工方法及塗層檢驗等幾方面做了較詳細的論述。Specification for manhole cover assembly, bolted, hinged, semi - flush, oiltight and watertight
半埋入式防油防水螺栓連接的人孔蓋組件規范A 77 - year - old man, who had undergone tace and hepatic surgery for hepatocellular carcinoma twice, was admitted due to biliptysis and dyspnea
一位因肝癌而曾經接受過兩次局部肝切除手術和動脈導管化學栓塞的七十七歲男性病人,因為氣促以及咳嗽中帶有膽汁而住院接受治療。The main popular theoretical method adopted to study end - plate connection is finite element technique under monotonic loading at present. this paper applies nonlinear ( material, geometry and contact ) finite element method to analyze the behaviors of connections under cyclic load at fist time. contact elements are set between end plate and column flange, screw cap and neighborhood plane, bolt bar and hole
對于端板連接的理論分析,目前國內外的研究主要局限在單向加載有限元分析范疇,本文首次採用三維非線性(包括材料、幾何與狀態非線性)有限元對端板連接進行了循環加載分析,端板與柱翼緣間、螺栓頭(帽)與相鄰板件間、螺栓桿與孔壁間都設置了反映邊界狀態的接觸單元。Plastics piping systems. glas - reinforced thermosetting plastics components. test methods to prove the design of bolted flange joints
塑料管道系統.玻璃纖維增強式熱固性塑料元件.檢驗栓接式法蘭接頭的設計試驗方法The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it
重點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的布置等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。But results from studis of r. hansan and n. kishi have shown that only when the initial stiffness of connection is more than 105. 05 kn - m / rad, the joint is considered as rigid connection, otherwise it should be dealt with semi - rigid connction
但根據r . hansan和n . kishi等人的研究表明,當螺栓端板連接的初始連接剛度大於10 ~ ( 5 . 05 ) kn - m rad時,這種連接才可以看作是剛性連接,否則就應將其視作半剛性連接。The modularized and interchangeable accessories reduce not only the variety of accessory, but also the trouble of user, because the same accessory can be applied to mccb with different rated current and the installation can be implemented without bolt just by the particular connective manner. easy range launched by schneider - electric enriched the family of merlin gerin, brought the customers much more variety of choices, consolidated the leader s position of merlin gerin in the area of electric solutions
附件的模塊化設計減少了附件的種類,而通用性則大大減少了使用者的煩惱,同一種附件可適用於多種不同電流規格的塑殼斷路器,電氣附件獨特的卡接安裝方式可以使附件在不需用螺栓連接的情況下可實現快速的裝配。Abstract : based on the fuzzy mathematics, it establishes the rules of the fuzzy reliability design for the bolt - joint set, discusses the effect of pre - tighten force and the axial changing load on the set, and shows an example
文摘:將模糊數學理論引入可靠性設計中,考慮預緊力和軸向變載荷狀態的影響因素,建立螺栓聯接的模糊可靠性設計準則,並給出了設計實例。Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad
然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連接形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼接的樑柱連接節點與無拼接的樑柱連接及翼緣對接焊接腹板拼接的連接節點的對比,各種設計方法之間的對比,以及翼緣拼接和腹板拼接的螺栓間距、直徑和數量,拼接點與梁端之間的距離,梁和柱的翼緣、腹板厚度,柱的軸力,接觸面的摩擦系數,翼緣和腹板拼接板的厚度等因素的影響。Specification for steel single tier bolted shelving angle upright type
鋼制螺栓連接的單層擱板Standard specification for interchangeable taper - ground stopcocks and stoppers
可互換的圓錐接地旋塞閥和栓塞的標準規范Calcualtion of bolt connection supported by eccentric sheal force with ultimatic strength method
偏心抗剪普通螺栓連接的極限強度計演算法Practical design method for bolt end plate joints of light steel structure
輕鋼結構螺栓端板連接的實用設計方法For the high tensile bolt connection between girders and carriages of double girder overhead traveling crane with electric hoist, this paper analyzes the forces exerted on the bolts and gives their strength check procedures
摘要介紹了葫蘆雙梁主梁與端梁連接的高強度螺栓的校核過程,通過分析高強度螺栓的受力特點,建立校核模式,總結校核步驟及方法。Standard specification for corrugated aluminum alloy structural plate for field - bolted pipe, pipe - arches, and arches
現場栓接管管拱和拱用波紋鋁合金結構板的標準規范Standard specification for corrugated steel structural plate, zinc - coated, for field - bolted pipe, pipe - arches, and arches
現場栓接管管拱和拱用鍍鋅波紋鋼結構板材的標準規范Step irons for staggered manhole steps - part 3 : bolted - on step irons
錯列人孔階梯腳扣.第3部分:螺栓連接的階梯腳扣Step irons with upstand for staggered manhole steps - part 3 : bolted - on step irons
錯列人孔直立式階梯腳扣.第3部分:螺栓連接的階梯腳扣分享友人