桿應力 的英文怎麼說

中文拼音 [gǎnyīng]
桿應力 英文
member stress
  • : 桿名詞(桿子) pole; staff
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨與圍巖的相互作用機理進行研究,利用全長錨固錨的中性點理論,從等效均化的角度來考慮錨對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨支護結構的場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖、變形的影響。
  2. Destabilization style of an arcuated built - up system bridge, influence of nonconservative force of hanger rods, comparative between stress value in construction stage and stress value in finished bridge stage, stability coefficients in bridge code, these are discussed deep

    著重對失穩類型、橫撐在穩定中所起的作用、吊非保向的作用以及施工階段的和成橋階段的比較、規范中穩定安全系數的規定進行探討。
  3. With the help of the electronic computers, engineers employ it to figure out nearly all kinds of engineering problems ranging from astronavigation, construction, waterpower projects, ship - building and mechanical engineering etc. owing to the strong power of finite element method, one kind of software pack which based on the method is exploited and named algor feas to resolve problems on structure analysis for trusses and shells. this paper also employ algor feas software pack to analyze and compute the cableway towers, giving the accurate result on stress and displacement both in location and whole. finally, we also bring out some advice on structure improving

    在此分析過程中:首先將物理模型簡化為學模型,主要是將塔架結構按空間單元簡化為空間桁架結構,目的是將學模型變換為數學模型;這一過程主要是利用autocad2000建立塔架的計算模型;再者,利用algorfeas軟體包讀入autocad建立的塔架計算模型生成初始數據卡利用計算機進行編程進行風載計算,再將計算結論整合入algorfeas產生的初始數據卡中,生成計算數據卡;接著,利用algorfeas軟體包計算塔架在不同載荷情況下的圖,位移圖,並且求出在不同載荷條件下的最大位移和最大等;然後,對塔架的穩定性進行分析;最後;根據計算結果提出改進建議。
  4. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨在不同荷載作用下,錨的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨的模型實驗研究,根據實驗結果提出了剪與位移的彈塑性本構關系表達式,並根據錨的基本方程,求解得出了錨在不同工作狀態下從彈性到彈塑性滑移的全過程中錨的內分佈。
  5. To solve these problems they concocted hypotheses on how beams, rods and plates behaved under stresses, pressures, or loads.

    為了解決這些問題,他們關于梁、和板在、壓或負載下是怎樣變動的提出了假設。
  6. Shear stresses and shear strains in prismatic members may be caused by either torsional moments, or by shear forces associated with flexure.

    在等截面件中,剪和剪變可以由扭矩引起,或者由變曲相關的剪引起。
  7. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    格梁加固不良地質地段路塹邊坡
  8. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面系結構分析所得的端面內,另外,索和預加(梁縱向、橫隔梁橫向、斜腹板豎向)也施加在相的位置,分析了箱形主梁在自重、索和預作用下的空間
  9. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    框架預邊坡支護結構穩定性計算方法及其
  10. The condition of uniaxial stress is closely approximated in prismatic bars subjected to pure axial tensile.

    單軸的狀態跟稜柱承受單純軸向拉伸十分近似。
  11. Technology of pre - stressed bolt support for rock floor gateway in deep mine complicated conditions

    深井復雜條件下底板巖巷預支護技術
  12. This paper, on the basis of analyzing accurately guiding drilling rod receiving strength state, stresses are calculated, has put forward the computing technology of project

    本文在正確分析了導向鉆進中鉆的受狀態的基礎上,進行了鉆桿應力計算,提出了工程計算方法。
  13. Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope

    三峽永久船閘直立坡鎖口錨桿應力監測分析
  14. Analysis on stress transmission and deformation of bolt in soil

    土層錨桿應力傳遞及變形分析
  15. Testing study of rock mechanics in lab for shuibuya project underground plant

    百色水利樞紐地下廠房巖壁梁載荷試驗錨桿應力分析
  16. Application and analysis of bolt stress meters in abutment construction project in yunnan provice

    雲南某水電站壩肩邊坡的錨桿應力用與分析
  17. From the viewpoint of sucker rod stress changing, this paper has analyzed the influence of augmenting the pump diameter, depth of pump, pumping stroke length and speed to sucker rod breaking

    摘要從抽油桿應力變化的觀點分析了調大抽油泵泵徑、泵深和抽油機沖程、沖次對抽油斷裂的影響。
  18. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩定性安全監測措施,主要包括邊坡水平位移觀測及支護結構撓度觀測;沉降觀測;以及錨桿應力監測;助梁鋼筋監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  19. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔錨桿應力計檢測的結果進行綜合反演分析,提出了水下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  20. Adopt at present most advanced large - scale super sap finite element structure analyse procedure to go on numerical value calculation for model of drilling rod, drilling rod whole stress simulation of state that receive show and reflect drilling rod various kinds of stresses under different working states distribute the characteristic clearly, make stress state of drilling rod reach visual, make people able to understand informations of drilling rod of stress status in depth too at the same time, so that the design of the improvement drilling rod constantly is in order to meet the demands of actual project

    採用當前最先進的大型supersap有限元結構分析程序對鉆的模型進行了數值計算,得到的鉆整體狀態的模擬顯示清楚地反映了鉆在不同工作狀態下的各種分佈特徵,同時也使鉆狀態達到了可視化,使人們可以深入了解鉆桿應力狀態信息,以便不斷的改進鉆的設計以滿足實際工程的需要。
分享友人