桿端應力 的英文怎麼說
中文拼音 [gǎnduānyīnglì]
桿端應力
英文
end stress of menber-
In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered
考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(梁縱向、橫隔梁橫向、斜腹板豎向)也施加在相應的位置,分析了箱形主梁在自重、索力和預應力作用下的空間應力效應。Moreover, popularizing such system is expected. the following works have been fulfilled within this thesis : first of all, based on the general principle of virtual displacement of nonlinear continuum mechanics, the geometric and material stiffness matrices is presented, several examples show that both of them can give out accurate result
本論文主要完成了以下工作:首先,根據連續介質力學理論構造出的交錯桁架結構空間單元的幾何剛度矩陣和彈塑性剛度矩陣,算例分析表明這些矩陣能準確地計算出結構的空間二階效應和空間單元彈塑性桿端力增量,計算結果具有良好的精度。The dynamic force - displacement relation curve is of crucial important to the design and operation of mechanical impact devices. using one - dimensional wave mechanics and characteristic line theory, this paper presents a testing method for determination of dynamic force - displacement relation curve from one - point strain measurement on an elastic rod endface. the principle of measurement, data processing method and experimental results for penetration into granite are discussed. 4figs., 5refs
沖擊載荷下彈性桿端的作用力-位移關系曲線是沖擊機械繫統研究的重要內容.基於一維波動力學方程,應用特徵線方法,探討了已知一點應變求取彈性桿端的作用力-位移曲線的測試原理與數據處理方法,以及在花崗巖上沖擊鑿巖機具的測試結果,對一點應變測試法的可行性進行了論證.圖4 ,參5Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price
我們公司是專門供應各種終端塊,交換機測試雙重座,地面座,保險絲座,三層傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,松解錨索關系自鎖式電纜接頭,光纜標記關系,軟管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,自粘配合摩,螺旋帶包,導線連接器,線纜配合固定座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,預終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍索腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,自粘配合固定座,擴大釘,螺旋帶包螺桿導線連接器,銅接線端子,預絕緣電工工具,電線接頭,電纜接頭固定座,尼龍拉鏈,尼龍關系,電纜終端,預終端絕緣,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越的產品和最好的服務,具有競爭力的價格The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized
它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改善了連續梁橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱梁混凝土和預應力鋼筋各自的特點,經濟效益顯著。When analyzing skew support continuous curved box girder bridge, curved grid girder analyzing method considering warping effect is applied. matrix displacement method is applied in analyzing skew support continuous curved thin - walled box girder bridge with restrained bearing. in order to convert original rigidity equations to structural rigidi ty equations that can be solved, bearing nodal displacement matrix can be introduced, then unknown quantities at the edge of beams can be consistent with the restrained directions of skew bearings, unit rigidity matrix and unit nodal forces can be gained. structural rigidity matrix can be composed according to matrix displacement method, so nodal displacements and inner forces on the end of the rod that are unknown can be gained calculating equations of inner forces on any cross - section can be solved
分析斜支承連續曲線箱梁橋時,採用考慮翹曲作用的曲線格子梁分析方法,應用矩陣位移法對具有約束支承形式的斜支承連續曲線薄壁箱梁橋進行分析,考慮到支座的約束條件並不與梁端彎曲角位移和扭轉角位移的方向一致,引入支座節點坐標矩陣,使得梁端的位移未知量與斜支座約束方向一致,來計算單元剛度矩陣和單元節點力,然後按照矩陣位移法組集總剛並建立結構剛度方程,根據結構剛度方程即可求解未知的節點位移及桿端力,推導出任意截面處的內力計算公式。Refer to the impacting - echo technology, we impacted the apex of the steel bar and incepted the reflecting stress ave through the resonator that fixed on the apex of the steel bar, and the value of the consolidating wave speed was calculated based on the time of stress wave transmitted and the length of the steel bar, so, identifying the reflecting signal is the key of the consolidating wave speed method
借鑒于沖擊回波技術,固結波速的測定方法是在鋼筋測桿的出露端施加瞬態沖擊載荷,由安設在測桿頂端的傳感器接收反射應力波信號,根據應力波的走時和測桿的長度折算固結波速的大小,因此反射信號的識別是固結波速法檢測混凝土強度的技術關鍵。In order to proof the program ' s effectiveness, we made some experiments on ly - 12a1 by shpb. in addition, based on the pochhammer - chree ' s theoretical solution about the stress wave propagation in infinite cylindrical bar, a numerical approach for analyzing dispersion in shpb experiments is developed
由於應力波在桿中傳播時存在彌散效應,在hopkinson桿實驗中,採用桿中某處的應變來代替桿與試件接觸端面處的應變,這必然會因為應力波的彌散效應給實驗結果帶來偏差。Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile
錨桿靜壓樁樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把壓樁過程樁周土體的本構關系看作是水平面的平面應變小孔擴張問題,利用小孔擴張原理,結合彈性力學以及塑性力學的知識,對壓樁後土體的性狀作出分析,得出樁對土的擠擴作用力、樁周土體塑性半徑、彈性區的位移,壓樁完成瞬時樁周土體彈性區和塑性區的超孔隙水壓力以及樁端球形孔擴張的擴張力。Bar - end rotation stiffness of continuous beam and its application in moment distribution method
連續梁的桿端轉動剛度及其在力矩分配法中的應用For a precision torque tester, the test device will be calibrated against the torque generated by weights hanging at the end of a beam. calibration is made by applying torque of known values to the test device in sufficient number of steps ( normally about 7 ) distributed throughout its usable range, from lower test values to full scale capacity
由吊在杠桿尾端的砝碼而產生的扭力,將會用作校正精密扭力檢測儀。校正過程是對測試儀器加以已知的扭力。加以的扭力,在儀器的應用范圍內,逐級(通常為七級)由最低測試數值加至其最高扭量。Adopting relatively simple mechanical model and predigested boundary condition and taking a straight bar applied one end with an semi - sine impulse to simulate the rigid target impacted by a projectile as an example, the relation between the stress wave propagation and acceleration of projectile has been analyzed by theoretical deduction and computer simulation
摘要採用較為簡單的力學模型和簡化的邊界條件,以直桿一端施加一半正弦載荷脈沖和模擬彈體沖擊剛性靶為例,用理論推導和計算機模擬的方法分析應力波傳播和彈體加速度的關系。分享友人