梁孔型 的英文怎麼說

中文拼音 [liángkǒngxíng]
梁孔型 英文
beam pass
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 孔型 : [冶金學] pass; roll pass
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖樁、承臺、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖樁施工採用鋼筋砼護壁確保挖樁的安全成,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺施工採用主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. The experimental study of twelve push - out specimens with different hole molds and different materials filled in holes and two composite steel - fdpcp ( full - depth precast concrete panels ) beams of a full shear connection and different hole mold, as well as a composite steel - fdpcp beams of a partial shear connection and square holes was conducted in this paper, the authors gain following results : three composite steel - fdpcp beams all have good composite action and perfect work behaviors as a whole and the composite steel - fdpcp beams is a new - style structure which should get further research and development

    摘要對12個不同預留形、內不同填充材料的推出試件及2根不同預留形的完全剪力連接與1根部分剪力連接的鋼混凝土預制板組合進行了試驗,結果表明,只要預留形設計合理,灌混凝土強度得當,鋼混凝土預制板組合就具有良好的組合效應和整體工作性能,是一種有發展前途和廣泛應用領域的新組合結構。
  3. Modeling the general solid web continuous box girder and opening - in - web ( open web ) continuous box girder by ansys finite element modeling tool, node stress of governing section and corresponding shear lag values are analyzed. the solution is validated by comparing with variational results and modeling test values. based on the model, the section shear lag induced by dead load, prestress tendons and car loads under the most unfavorable condition and lateral symmetry are also approached. the influence of shear lag effect in double - level continuous box girder is considered with opening - in - web and the web location. the analysis indicates that double - level - load arouses less shear lag effect than one - level - load. when self - weight and prestressed tendons act on together, the shear lag effect on box girder take on a evidently change

    基於所建立的有限元模,本文分別對實腹和腹板開兩種箱在恆載、車載、預應力荷載作用時,各主要截面的剪力滯效應進行分析,通過施加縱向最不利的和橫向對稱的車輛荷載,研究實腹連續箱和空腹連續箱在承受雙層荷載和單層荷載時引起的剪力滯效應,並考慮腹板開及開位置對于連續箱剪力滯效應的影響。分析表明,雙層車載對于箱引起的剪力滯系數比單層車載的影響要小,對于箱中存在引起的剪力滯后現象有一定的改善作用。
  4. Combing the linear seepage model with hydrogeology in the region of zhong - liang reservior, the analysis of the problem of positive and negative is emphasized. make use of with some observing information of boreholes in this region, adverse seeking the hydrogeology of the reservoir in the region with finite element method, the leakage quatity of karst water in the region of reservoir is forecasted.

    線性滲流模結合了中水庫庫區水文地質條件,重點進行正反問題的計算分析,利用研究區若干觀測資料,採用有限單元法反演庫區的水文地質參數,並預測了庫區巖溶水滲漏量。
  5. The machine can adopt positive and negative circulation and other deep drilling technique, adapts to various stratum, is the first selected equipment for foundation construction of river ' s bridge and dock, and also adapts to large diameter borehole construction such as tall building, coal mine vertical well and sewage well, it exerts great action many changjiang river large scale bridges foundation construction

    該機可採用正反循環等鉆進工藝施工,適合於各種地層,是江河橋、碼頭基礎施工的首選設備,也適用於高層建築、煤礦豎井和污水井等大口徑鉆施工,在多座長江大基礎施工中發揮了巨大作用。
  6. The construction technique in question is applicable to the river reach where water current directions and water levels are varying and to the construction of bored piles and elevated pile caps for deep water foundations of major bridges over river and sea in the offshore area

    本項新技術可運用於水流方向多變、水位變化大的河段及近海跨江跨海特大深水基礎鉆樁及高樁承臺施工。
  7. This is machine is special for producing round flat corrugated ducts used in expressway, bridge, train and large - span post - tension concrete project

    Sb - jg - 110卷管機,是用於卷製作為橋建築預應力施工中預留道的螺紋管的機器。
  8. As far as the hollow inclined column - wall transfer r. c joint is concerned, the paper introduced the truss model to calculate the internal forces of transfer beam, inclined column and square column

    在有斜柱轉換節點中引入了桁架模以確定轉換、斜柱及方柱的內力。
  9. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆樁施工、承載力3000kn斜拉式掛籃開發與研製、部施工、新橋面鋪裝層施工技術及動靜載試驗。
  10. The structure and characteristics of a new cnc punching line for the light, medium sized truck side - member and side panel of carriage have been introduced

    摘要介紹了輕、中卡車縱及車廂邊框加工新數控沖生產線的結構、性能特點。
  11. Abstract : through the practice of vertical pressers in long sp an continuous box - girder and the research of two - way prestress model test, the construction technology about unbonded vertical prestress is proposed and applie d in hanjiang bridge in hanchuan. for the first time, it ? s first adopted in long span concrete bridge in our country and a lot of economic benefits are created b ecause of its advantages such as little drill way, rapid and imple construction, h igh quality and so on

    文摘:通過漢川漢江公路大橋大跨徑連續箱豎向預應力施工實踐和雙向預應力模試驗研究,在該橋施工中提出並應用了無粘結豎向預應力技術.這在國內大跨徑砼橋樑上尚屬首次全面採用,它具有道直徑小,施工簡便快速,質量易於保證等優點,為全橋預應力施工創造了較為顯著的社會經濟效益
分享友人