梁布置 的英文怎麼說

中文拼音 [liángzhì]
梁布置 英文
arrangement of beams
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. These structures were usually skewed with the diaphragms placed perpendicular to the longitudinal girders.

    這些結構通常是斜交的,而橫隔板則垂直於縱梁布置
  2. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱架支承結構時,各部分構件應當均勻對稱。另外,還應注意頭道拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。
  3. After closure, continuity prestressing tendons would be provided in the bottom of the box.

    合攏以後,箱底部有連續的預應力筋。
  4. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、角鋼形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  5. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形式,研究並提出了電站鍋爐鋼結構改造加固研究方法,及動力分析的具體步驟:建立了鍋爐鋼結構動力分析模型、地震荷載分析方法、建立了鍋爐鋼結構型式、及整個鍋爐鋼構架抗側力體系模擬分析方法。具體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝確定、吊桿與大板簡化。
  6. The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering

    研究表明:本文研究的、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的承載力下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限應變的影響不明顯;受彎構件的裂縫間距受箍筋(鉤筋、分佈筋)的影響;文中所用的承載力和變形計算方法是可行的。化爆試驗表明,高強混凝土構件的動載抗彎性能能夠滿足防護結構的要求。
  7. The research in this paper is expected to provide helpful reference for the future design of pedestrian bridge with spacial double - layer cable system and abnormity steel box girder

    通過本文的研究,以期為今後空間的雙層索系以及異形鋼箱斜拉橋在人行景觀橋設計中的應用提供有益參考。
  8. Simulation results show that the vibration of the beam can be suppressed rapidly by applying voltage to the piezoelectric patches displaced in this way, and single mode vibration and multi - mode vibration can be controlled simultaneously

    通過算例進行數值模擬,結果表明,以此方法壓電片和輸人控制電壓,能迅速抑制懸臂的振動,可單獨或同時控制幾階模態振動。
  9. Then, the continuous beam bridge cad system is taken as a real example, to analyse the system structure including the layout, data requirements, procedure diagram of the sub - systems such as beam calculating and modeling, construction simulating, structure analysis, result output, pre - stressed tightwire layout, general tightwire layout, design graphic plotting

    然後,以「連續計算機輔助設計系統」為實例,詳細分析了該系統的整體結構,以及部計算模型生成子系統、施工過程模擬子系統、結構分析子系統、計算結果審核和文本輸齣子系統、預應力鋼束子系統、普通鋼束子系統、設計圖表子系統的層次結構、數據需求和處理流程。
  10. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該橋推薦方案的橋址、武漢理工大學碩士學位論文橋型及橋總體提出了合理化的建議;通過施工驗算,對施工預拱度及保險墩的設提出了要求,對交界平衡墩進行了優化設計;施工結構驗算表明,轉體勁性骨架強度、穩定性富餘系數較大,截面幾何尺寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了工程投資,加快了工程進度,增強了橋的美觀。
  11. This is due primarily to the ever - increasing emphasis on aesthetics coupled with transportation alignment restrictions. the use of curved beams in industrial buildings is also not uncommon

    曲線橋的設,不僅可以使交通線路的趨于合理和科學,而且能夠與周圍的環境協調一致,給人以美的享受。
  12. The coal unloading chute is a kind of the underground reinforced concrete box structure. the main beam of coal unloading chute being made skew, this kind of structure has been the first time in domestic

    進煤系統的主體建築物卸煤溝為地下式鋼筋混凝箱形結構,卸煤溝溝頂主採用斜向,這種結構形式在國內尚屬首次。
  13. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、,錨固區的設計及構造處理,裂縫問題,側向約束對軸向預壓應力及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  14. Experiment showes that the skew beam has the mechanical characteristic of coupling of bending and torsion. the skew beam has little influence on bottom slab and lateral slab

    試驗表明斜具有彎扭耦合的力學特性,主的斜向對側壁和底板的影響較小。
  15. In october and november 2005, leung chi wo made visits to 21 households in sapporo of japan and listened to the stories about their living spaces. afterwards, their recorded monologues were played separately with small speakers installed all round inside an ordinary apartment at street level open to public in sapporo. upon entering, it was a room of multiple whisperings until the audience moved toward each speaker to listen to each story

    這個創作計劃開屋香港版緣於家志和在2005年10月及11月間到日本札幌市駐留作藝術交流,拜訪了二十一戶人,問他們各種有關其居所的事情,如搬遷和找房子的故事,以及對居室的和使用等等,並將他們的話語錄為獨白,然後在我當時居住的細小公寓內分別以獨立的揚聲器播放出來。
  16. With the designing and building of yichang yangtse river highway bridge, a single - span suspension bridge with main span of 960m, some technical problems such as the layout of structural system of the suspension bridge, the type of cross section of stiffening steel box girder, the structural system of the anchor and the cracking - resistant techniques of the bulky concrete anchor have been studied in the present thesis. some valuable conclusions have been achieved that provided a substantial support for the successful completion of the bridge. the thesis contains five chapters

    本文以湖北宜昌長江公路大橋(主跨為960m的單跨懸索橋)的設計與施工為背景,對大跨懸索橋設計與施工中的若干問題如懸索橋結構的合理、加勁鋼箱斷面型式的合理選取、錨碇結構的合理確定以及錨碇大體積混凝土設計與施工的綜合防裂技術等進行了研究,取得了一批富於實用價值的研究成果,為宜昌長江公路大橋的順利建成提供了卓有成效的技術支持。
  17. From the lessons learned from the quality accidents of rubber bearing, problems in design and quality control, selection and installation, inspection and maintenance are discussed, and factors influencing the service lifetime of rubber bearings and countermeasures of application investigated

    本文根據近幾年發生的多起公路橋橡膠支座質量事故,從橡膠支座的產品質量、支座的設計和橡膠支座的選用、、安裝檢查與維護等方面進行了分析,並指出了影響橡膠支座使用壽命的諸多因素及應用對策。
  18. Based on the analysis of the current status of highway bridge security examination of native and abroad, combing with the construction plan and operation condition of the highway bridges in hubei, this paper discusses the principle and method of highway bridge security examination, especially analyzes the relation of the traffic security with the facts such as the width of lane, transverse arrangement, security devices, environment and the geometrical line type which is formed by the longitudinal transverse technical target of bridges, and then raises the principle, content and program of the highway bridge security examination, in addition, this paper applies the bridge security examination to plan, design, construction and operation

    本文以國內外公路橋安全審查現狀分析為基礎,結合湖北省公路橋規劃建設與運營狀況,對公路橋安全審查的原理和方法進行了探討,重點分析了橋平縱橫技術指標組合構成的幾何線形、行車道寬度及橫向、安全設施、環境及其他相關因素等與交通安全的關系,提出了公路橋安全審查的原則、內容及程序,並分別對規劃、設計、施工及運營中的橋安全審查進行了具體應用。
  19. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定性分析的基礎上,以邊坡穩定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固工程的具體時是否存在不穩定體從錨索或框架的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
  20. According to the result of the internal force calculation, this paper introduces detailedly the design of tied frame prestress reinforcement, the checking calculation of section stress and intensity of arch and tied frame, also it provides some result files > arrangement drawings and main structure design drawings

    利用內力計算結果,本文還詳細介紹了系預應力配筋設計,拱肋和系截面應力和強度驗算及橫設計計算,並提供了部分計算結果文件、總體圖和主要結構設計圖紙。
分享友人