梯段步高 的英文怎麼說

中文拼音 [duàngāo]
梯段步高 英文
flight raise
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (步度; 腳步) pace; step 2 (階段) stage; step 3 (地步; 境地) condition; situation; st...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  1. This article puts forward a solution named divide - assemble by deducing the size of bp neural network to overcome entering the local best point, the dividing process is that a big bp neural network is divided into several small bp neural networks, every small bp neural network can study alone, after all small bp neural networks finish their study, we can assemble all these small bp neural networks into the quondam big bp neural networks ; on the basis of divide - assemble solution, this article discusses the preprocessing of input species and how to deduce the size of bp neural network further to make it easy to overcome entering the local best point ; for the study of every small bp neural network, this article adopts a solution named gdr - ga algorithm, which includes two algorithms. gdr ? a algorithm makes the merits of the two algorithms makeup each other to increase searching speed. finally, this article discusses the processing of atm band - width distribution dynamically

    本文從bp網的結構出發,以減小bp神經網路的規模為手來克服陷入局部極小點,提出了bp神經網路的拆分組裝方法,即將一個大的bp網有機地拆分為幾個小的子bp網,每個子網的權值單獨訓練,訓練好以後,再將每個子網的單元和權值有機地組裝成原先的bp網,從理論和實驗上證明了該方法在解決局部極小值這一問題時是有效的;在拆分組裝方法基礎上,本文詳細闡述了輸入樣本的預處理過程,更進一地減小了bp網路的規模,使子網的學習更加容易了;對于子網的學習,本文採用了最速度? ?遺傳混合演算法(即gdr ? ? ga演算法) ,使gdr演算法和ga演算法的優點互為補充,提了收斂速度;最後本文闡述了用以上方法進行atm帶寬動態分配的過程。
  2. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    揚程級提水灌溉工程的投資控制,在設計階應逐推行限額設計的作法;施工階以優化施工方案,審簽施工圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待工程變更,正確處理索賠事宜。
  3. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;壩大庫工程的初期、中期、後期三個時的施工洪水設計標準應根據庫容等指標逐
  4. Knowing well her part, she ascended a flight of wooden steps, and was thus displayed to the surrounding multitude, at about the height of a man s shoulders above the street

    她深知自己此時的角色的意義,舉登上一,站到肩的臺上,展示在圍觀人群的眾目睽睽之前。
  5. Not only proactive maintenance - timely solution to fault ; even more proactive maintenance - as much as possible through the day - to - day maintenance and scientific norms to fault eliminate hidden dangers stage, avoid breakdowns and accidents from taking place, and every time all the repairs and maintenance of detailed records of failures occurred and the reasons for the law, through targeted technical transformation to avoid the recurrence of similar failures ; the fault components, always with a higher technological content of similar components to replace, thus ensuring the elevator control and drive technology has advanced technology and the same industry simultaneously

    不僅主動維修- -及時地解決故障;更是主動維護- -盡可能地通過日常規范和科學的保養讓故障消除在隱患階,避免故障和事故的發生,並對每次的維修和保養都詳細記錄,分析故障發生的規律和原因,通過有針對性的技術改造避免同類故障再次發生;對于故障部件,總是用更技術含量的同類元件來代替,保證了電的控制和拖動技術始終和同行業先進技術同
分享友人