梯級控制 的英文怎麼說

中文拼音 [kòngzhì]
梯級控制 英文
control cascade
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Meanwhile, by analyzing the characteristics of hlsip ( including the newly - built and innovated projects ), it tries to explore suitable supervision model for the project and it mainly studies the quality, cost and time control of the project in different stages

    同時,在分析高揚程提水灌溉工程(包括新建項目和更新改造項目)建設特點的基礎上,論述了適宜於本項目建設和改造的監理模式,並著重研究了工程建設不同階段的質量、投資、進度理念及方法。
  2. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程提水灌溉工程質量的重點包括:設計階段好方案對比、設計優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重設計成果的長期效益;施工階段協助業主選擇好施工承包商,定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量製程序,使工程施工時時處于受狀態;同時要提高承包商的質量自能力,堅持施工質量的全過程、多方法、多體系
  3. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程提水灌溉工程的投資,在設計階段應逐步推行限額設計的作法;施工階段以優化施工方案,審簽施工圖紙,嚴格計量支付為重點,防止投資失,同時要謹慎對待工程變更,正確處理索賠事宜。
  4. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域水電開發有限公司結合流域水電開發實際,通過建立流域水雨情監測網,開展群庫水、電、網多環節的大系統綜合調度研究,流域電站模式研究、流域供電范圍及開發時序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子電站調度實踐,在流域電站統一調度研究方面已取得了初步的成果。
  5. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在開發河流上應實施從施工洪水到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  6. Escalator construction, driving machines, speed control, drive chains, rails, safety devices, steps, combs, guards, etc

    自動扶自動扶結構、驅動器、速度、驅動鏈、軌道、安全設備、踏、梳齒、保護裝置等
  7. A full mathematical model of optimal flow pattern design withengineering constraints was put forward, based on modern optimal control theory. an optimal flow pattern design was presented for optimizing meridional channel of axial flow turbine. according to integral optimization of turbine stages, a full physical model and mathematical expression were put forward for proposition of optimal flow pattern, including all performance parameters in turbine stages. this problem was further recast into a typical form control to maximize specific performance index such as work or efficiency of stage with given initial state, fixed terminal condition and constraints for part of state terminal variables. the program was also worked out according penalty function method and conjugate gradient method. the optimal distribution of c1ur1 ( r1 ) was obtained according to constraint conditions and maximized objective function

    把近代最優論方法引入軸流透平葉片的設計,在優化的軸流透平子午通道內,建立包括透平內所有性能參量的最優流型命題的完整的物理模型及其數學表達式,並歸化為一個在給定初始狀態、自變量終端固定、部分狀態變量終端受有約束的條件下,使的某一性能指標(如的功率)達到最優的最優問題,應用「代價函數法」及「共軛度法」編計算程序,計算得到符合給定約束條件、並使目標函數取極值的最優環量分佈,結果是令人滿意的。
  8. In the year of 2003, the prospect photoelectric production process passed the iso9001 : 2000 quality management system certificate and the prospect company was asserted as the new high technology enterprise in hebei province in 2004, nay, as well as the double - software authentication enterprise. and our production was asserted as the new high technology production in hebei province. in september of 2004, the prospect photoelectric digital elevator weight - load contronller was awarded the " science and technology achievement cetificate of hebei province " by the science technology office of hebei province and also was published on the list of " national unod new product promram project " by the science technology bureau of china in june of 2005

    2003年,公司產品生產過程通過了iso9001 : 2000國際質量體系認證。 2004年,前景光電公司被河北省科技廳及信息產業廳授予「河北省高新技術企業」及「雙軟認證企業」 ,產品被評為「河北省高新技術產品」 。 2004年9月,我公司生產的數字型電載荷儀通過國家一查新咨詢單位查新,技術屬于國際先進國內領先水平,被河北省科技廳授予「河北省科技成果證書」 ,並被國家科技部列入國家重點新產品計劃項目。
  9. The honbo adornment hardware material factory profession produces to operate the high class luxury holds hands, a factory for controling hardware, stairs hardware with glass kit engineering hardware house. the my plant ushers in forerunner in abroad produces the different from own the profession of the high character of the rich in experience the technical personnel, the product style is novel, the craft is consummate, the specification is well - found, the species is numerous, can be provided as customer to choose, can also according to customer need in equipments specification processes to order the system

    弘博裝飾五金材料廠專業生產經營高豪華拉手,門五金,樓五金和玻璃配套工程五金的廠家.本廠引進國外先進生產設備和擁有經驗豐富的高素質的專業技術人員,產品款式新穎,工藝精湛、規格齊全、品種繁多,可供客戶選擇,還可以根據客戶不同的需求規格加工訂
  10. According to the desire of no operator on duty operation mode and dispatching two hydropower plants and two dams by tgcdc, and focusing on how to connect the cscs of gehp to the cscs of tgcdc to meet the technical demand of cascade dispatching, advanced the frame and network configuration of sj - 600 lcu that is appropriate to the functional desire of no operator on duty operation mode, and fully compared with the import lcu on system structure, technology capability and configuration ; and advanced two reforming schemes of connecting the cscs of gehp to the cscs of tgcdc that meet the desire of tgcdc and are appropriate to the desire of no operator on duty operation mode

    根據無人值班和三峽調實行兩廠兩壩聯合調度的要求,圍繞著二江電廠計算機監系統如何接入三峽調監系統滿足調度的技術要求,提出了適應無人值班功能要求的sj - 600型現地單元( lcu )裝置的構成和網路結構,並就系統結構、技術性能和組態等方面同進口lcu進行了全面比較;提出了兩套滿足調要求、適應無人值班要求的二江電廠計算機監系統接入三峽調監系統的改造方案。
  11. Namely, setting a series of steppes in the slope channel and deflector plate and hanged - grid at the cure section, through the model test, the conclusion is very good

    即在上陡坡採用階,在彎道段採用舌壓板和導流消能柵的「消一導」結合方式來彎道急流,通過模型試驗驗證,取得了較好的效果。
分享友人