構造值 的英文怎麼說

中文拼音 [gòuzàozhí]
構造值 英文
structured value
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. For a class of quadratic finite element diseretization systems of an elliptic boundary problem with jump coefficients under the unstructured quadrilateral grids, we are concerned with two kinds of quadratic lagrangian finite element equations, by analyzing the relationship between the linear finite element and quadratic finite element basis functions, a hew amg method is designed

    摘要針對一類帶間斷系數的橢圓邊問題,在非結四邊形剖分下,討論了兩種二次拉格朗日有限元方程的代數多重網格法,通過利用雙線性元和二次元基函數之間的表示關系,給出了一種新的網格粗化演算法和提升運算元的代數途徑。
  2. By the polygonal approximation method, a global approximation solution is constructed for the initial - boundary value problem of nonconvex scalar conservation laws with two - side boundary effect, and its convergence to the global weak entropy solution of the corresponding problem is proved

    摘要使用折線逼近法,對具有兩條邊界影響的非凸單個守恆律初邊問題了整體近似解,並證明其收斂到初邊問題的整體弱熵解。
  3. On the basis of expound the theory of building exterior - protected construction energy consumption and the gene of influence the building energy, set up mathematics model, this article discuss the mechanism of dispelling the heat of the buildings " thermal bridge and the complication that influence it, and then synthetic analysis and calculate the influence range of building thermal bridge in exterior - protected construction column thermal bridge to the building outer wall get the conclusion that when the construction column can satisfy the building stress - area, in bulgy construction column dispel less heating than out bulgy construction column. but if the pole stuck out more than 100mm, in bulgy or out bulgy make no difference

    本文在闡述建築圍護結耗熱原理以及影響建築能耗因子的基礎上,採用數模擬方法,探討了建築熱橋傳熱的基本機理和影響建築熱橋傳熱的因素,進而對建築熱橋在圍護結傳熱中的影響范圍進行了綜合分析和計算,研究了柱熱橋型式對建築外墻能耗的影響,得出了柱在滿足建築受力面積要求的情況下,內凸柱較外凸柱略能減少散熱量的結論,但是凸出過大( 100mm )無論內凸還是外凸對建築耗熱都沒有大的差別。
  4. ( 3 ) distill the environmental geologic factors and analyzes their harmness and reasons mainly analyzes the status in quo, reason, distribution, harmness and defend for the falls, surface sink, mine suddenly water, landslip, castoff, etc. ( 4 ) evaluate the probability of the geology calamity take use of the method of factors and coverage union to evaluate the probability of the geology calamity, and then plot out the high, middle and low probabilit

    ( 3 )提取環境地質因素並進行分析其危害及成因利用提取的要素、數字地面模型和屬性數據庫及常規資料重點分析了、塌陷、礦坑突水、崩塌、廢棄物、地下水疏干區等要素的現狀、分佈、成因、危害及防治。 ( 4 )為金礦區地質災害易發性做出評價利用權重和圖層疊加的方法對金礦區地質災害易發性做出評價,把金礦區劃分為高易發地區、中易發地區和低易發地區,針對這些地區提出治理措施。
  5. Further research of lithofacies pvove : lode country output points belongs to tidal - flat facies. and the two sides belong to littoral facies - estuarine facies. ore area petrochemistry analyse also prove : intraclast congeries silica rock in basin have higher cu, ag abundance than circumference pena. the prominence inhomogeneity of the cu distribution indicates reconstruct of the late construction

    礦區內巖石化學測量也證明:盆地內發育的內碎屑堆積硅質巖比周圍巖石具有更高的cu 、 ag元素地球化學豐度, cu元素分佈的顯著不均一性,表明了後期的改作用。
  6. But stress and contexture of space structure are very complex. it is difficult that planners estimate practical internal force

    但是由於大跨結的受力和均較復雜,設計人員很難準確估計各桿件和節點的實際內力
  7. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的進行了詳細的歸納。
  8. Construct function by mid - value theorem of differential calculus

    由微分中定理函數
  9. The structure method of auxiliary function is very important in solving questions about middle value theorem in differential calculus

    摘要輔助函數法是解決有關微分中問題的一種重要數學方法。
  10. According to different features of conclusion about middle value questions in differential calculus, four kinds of methods about the auxiliary function structures will be concluded

    針對微分中問題的結論的不同特徵,本文歸納出了輔助函數的四種方法。
  11. Firstly, it introduced the import principium resolving thread and steps of analytic hierarchy process. secondly, it erected model of population modernization, which based on the steps of analytic hierarchy process. lastly, it got the maximal eigenvalue of dissymmetric matrix and corresponding eigenvector with sas, and normalized the eigenvector to get weight value

    本章分為兩部分,第一部介紹分析法的提出、原理以及解決問題的思路和步驟;第二部建立模型確定權重,根據層次分析法的原理和步驟,建立人口現代化指標體系的模型,運用sas求解所的非對稱判斷矩陣的最大特徵,從而得出所對應的特徵向量,變形后得到權重。
  12. ( 4 ) on the efficient method for the dynamical core of the new generation multi - scale forecasting model i ) we present a new multi - level sparse approximate inverse preconditnioner for the complicated 3 - d helmholtz equations in the new generation weather forecasting model. as a result, the new sparse approximate inverse preconditioned gcr and gmres algorithms are given and successfully applied in the dynamical core. numerical tests show that the new algorithms perform very efficiently, and can greatly improve the efficiency of numerical model

    對此,本文提出了一種基於逐層門限技術的近似逆矩陣稀疏模式預選方法,並了相應的稀疏近似逆預條件子,結合gcr演算法和g州[ r衛s演算法,首次將逐層門限稀疏近似逆預條件子應用於新一代多尺度預報模式動力內核的實際計算,數實驗表明這里給出的方法可以大大提高數模式的計算效率。
  13. The earth crust activity of different geotectonic elements could he estimated with the fracture fractal dimension

    利用斷裂尺度分佈的分形維數的大小,可以定性判斷不同大地單元的地殼穩定性。
  14. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數模擬、分析驗證的基礎上,對典型組合墻體在不同連接和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  15. Secondly, the mixed h2 / h control is formulated as a game problem of incomplete information, a suboptimal 2x2 non - zero game model is constructed, where two channels are chose as players and h2 and h control are pure strategies, and an algorithm for mixed h2 / h control, which is based on the nash ' s bargaining theory, is derived to achieve the nash equilibrium point. finally, handling stability, ride comfort and steering handiness are related with vehicle suspension system and electrical power steering

    其次,基於對策論把h _ 2 h _混合控制問題抽象為兩個對局者信息不完全情況下的非零和博弈模型,在以次優范數的2x2非零和博弈模型中把兩類通道作為參加博弈的兩方,以h _ 2和h _控制方案作為兩種純策略,基於納什談判解原理設計出求解h _ 2 h _混合控制問題納什均衡點的演算法。
  16. Based on the fromer study of mine tectonic, hydrology, tunnel deformation, etc., 3 - d numerical simulation of current tectonic stress field of lvjiatuo coal mine was done in this thesis, combining with local hypocenter mechanism solve and relational stress in - situ measuring value regression analysis has been done to the simulation result, and the reasonable results are gained those will offer dependence for disposing the tunnels more rational and making tunnel supporting more economical and safer

    摘要本文在前人對呂家坨礦進行礦井、水文地質、巷道變形等研究的基礎上,結合該地區的震源機制解及有關的應力實測,對礦區現今應力場進行了三維數模擬,並對模擬結果進行了線性回歸分析,得到了與現實較為符合的結論,為更合理的巷道布置和更經濟而安全的巷道支護提供依據。
  17. Henriksson and merton ( 1981 ) regard the timing ability as a free put option. goetzmann, ingersoll and ivkovic ( 2000 ) try to catch the accumulated value of a sequence of such options. we conclude that gii model may pay a more applicable role in the timing study from the theoretical point of view

    在對模型的進行深入的研究后,我們發現, tm模型假設時機選擇使組合的系統風險呈非線性特徵, hm模型將時機選擇視為一免費的看跌期權, g模型進一步捕捉看跌期權在整個評價期間內的價
  18. The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly

    研究認為該氣藏簡單,只在鳳凰山形成了一個小型的鼻狀;屬於三角洲前緣亞相沉積模式,水下分流河道和河口壩是有利的沉積微相;儲層物性差,儲層巖石的孔隙類型主要有粒間孔、粒間(內)溶孔及少量晶間微孔;影響蓬萊鎮組氣藏儲層孔隙結及儲集性的因素有巖相、巖性條件及成巖作用;所有測試井自然產能都極低,必須經加砂壓裂后才有工業開采價,且投產初期,油套壓下降較快,氣井產量下降迅速。
  19. The simulation of mesoproterozoic tectonic stress field forming mafic dyke swarms in the central north china craton

    華北克拉通中元古代巖墻群形成的應力場數模擬
  20. That is null using this format

    可以使用如下格式構造值為null的
分享友人