槽床 的英文怎麼說

中文拼音 [cáochuáng]
槽床 英文
(安放槽子的架子或臺子) manger [trough; groove; slot] bed [stand]
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  1. Particle electrode potential of bipolar packed electrolytic cell was investigated experimentally

    摘要對復極性固定電解中粒子電極感應電位進行了研究。
  2. Bearing sleeves for milling machine arbors, for milling cutters with longitudinal keyway

    第1部分:銑心軸用和帶縱向鍵的銑刀用軸承座套
  3. Applying imported raw material and advanced manufacturing technology, together with modern scientific management system, it is specialized in manufacturing and selling machined bolts, selftapping screw bolts and nuts of stainless steel, copper oriron and hollow rivets of stainless steel, copper, iron or aluminiun in accordance with the standards of china gb, american ansi, japan jis, german din or england bs ; and non - standardized hardware such as cross slots, inner hexagon fastening bolts, expansion bolts, and toy vehicle axles, its products are sold widely in domestic and foreign markets, earning quite high credit among customers

    公司引進國外先進的冷鐓和搓絲設備,採用進口原材料及先進生產技術,並運用現代科學管理體制,專業生產和銷售中國gb 、美國ansi 、日本jis 、德國din 、英國bs標準的不銹鋼、銅、鐵機制螺釘、自攻螺釘、螺母;不銹鋼、銅、鐵、鋁空心鉚釘;十字、內六角緊定螺釘、膨脹螺栓、精密自動車件等非標準五金製品,產品遠銷國內外市場,在廣大用戶中享有較高的信譽。
  4. Turning tools with speed steel inserts. parting off turning tools

    高速鋼合金車刀具.切
  5. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河以及杭州灣北岸深的影響
  6. Tooling machine processing pistol ring ? semi - automatic multiple - cut machine, mainly it is applied in oil grove processing, with only relevant ratchet wheels being fitted

    加工活塞環?油環的多刀半自動化專用機,主要用於活塞環上的油加工,油環上的不同油數只須配以相應的棘輪即可進行加工。
  7. Sulfide further accumulates where depressions in the bottom of the sill interfere with the flow system and act as natural riffles.

    底上如有陷穴,就起到天然溜的作用,干擾了巖流體系,使硫化進一步堆積。
  8. The hongqiling cu - ni ore deposit is located to the northern flank of a contacting zone ( the huifahe fault systems ) between the north china platform and the jilin - heilongjiang syncline system

    摘要紅旗嶺銅鎳礦地處華北地臺與吉黑地系接觸帶輝發河斷裂北側。
  9. Self - centring chucks for machine tools with two - piece jaws tongue and groove type - sizes for interchangeability and acceptance test specifications

    用雙爪自定心卡盤榫接合式.互換性尺寸和驗收試驗規范
  10. Then river width increased and the intensity of deep point lowing and bed material coarsening decreased and water level lowed continuously. so the bed form changed toward to u type. the bed regulation is realized through sediment silting in different parts in cross section during silting period and the deformation of bed form changed from broad u type channel to narrow and deep v type channel

    研究表明,河道在持續沖刷前期深泓點及水位下降與河粗化同步發展,河向v型發展;沖刷後期深泓點下降、河粗化減弱,河道展寬增大,水位繼續下降,河向u型發展;在以淤積為主時期的調整,是通過斷面不同部位的淤積來實現的,但都是由u型較大河向v型窄深小發展。
  11. By the analysis and study, it is showed that : 1 ) the lower weihe river main channel was at a balanceable state between aggradation and degradation and floodplain of the lower weihe river is a tiny aggradation state before the construction of the sanmenxia dam ; 2 ) the severe aggradation of the lower weihe river bed is mainly caused by the increasing riverbed elevation at tongguan after the construction of the sanmenxia dam ; 3 ) the main reason leading to the increasing riverbed elevation at tongguan is the unreasonable operation of the sanmenxia reservoir ; 4 ) the rate of the riverbed aggradation at tongguan reach and the lower weihe river reach are speeded by adverse condition of incoming water and sediment recently

    然後以實測資料為基礎分析研究了三門峽建庫前後潼關高程的變化規律以及渭河下遊河道的沖淤演變規律,分析研究表明:建庫前渭河下游主處于動態沖淤平衡狀態,灘地處于微淤狀態;建庫后,渭河下遊河道發生嚴重淤積主要是由於潼關高程的抬升造成的;潼關高程的抬升主要是由於三門峽水庫的不合理運用造成的,近期不利的水沙條件加劇了潼關河的抬升速度和渭河下游的淤積。
  12. The parts and units of jigs and fixtures. slot bolt

    夾具零件及部件.用螺栓
  13. Groove cutters for woodworking machines

    木工機用切口刀
  14. Machine tools ; slotted profiles and spacing of slots ; dimensions

    .形和距.尺寸
  15. Because the yili river belongs to plain broad and shallow moving river, the main channel changes greatly and swings to a large range, which leads to river crooked branching river type and s curved, many fork rivers, the river continent and the river beach in river center, alluvial shoal and beach. the width in some section of the river is up to about 3800m. in flood season it causes serious harm to farmland, factories, residents along two sides

    由於伊犁河屬于平原游蕩性寬淺河流,主變化不定,擺動幅度極大,河道多呈彎曲分叉河型和s型彎道、多叉河、河心洲,河心灘和沖擊淺灘及邊灘,部分河段河寬度達3800m ,洪水季節對河道兩岸的田地,工廠,居民等造成極大的危害,素有「三十年河東,三十年河西」之稱。
  16. The economic success of jiangmen huoli group co., ltd. is coined / shaped by products and service services such as boiler, heater, heater in addition to heater, homepage and water heater. one can even receive offers on boiler, stove, smoke and boiler as well as on gas water heater with jiangmen huoli group co., ltd. in outstanding quality

    不僅在以主頁、鍋爐、汽鍋、蒸餾鍋、釜、水、容器和加熱體以及重沸器、加熱氣和加熱器領域內著稱,而且以其它產品馳名,如地坑、爐、煙、煙氣和水加熱器、氣水供熱裝置以及發熱器。
  17. Machine tools ; internal tab washers for slotted round nuts for hook spanner according to din 1804

    .按din 1804鉤形扳手用開圓螺母的內舌墊圈
  18. Machine tool tables - t - slots and corresponding bolts

    工作臺t形和相應螺栓
  19. Study of u shaped girder with pre - cast main beam and cast in - situ slab

    預制主梁現澆道板的形梁研究
  20. 5. based on the physical model, summarized the general mode of river development in excavated segment with its up and lower influence reach after dredging, it means that gradually deposit in dredging segment while wash out in up reach, and the change intensities are weakening as the time goes on

    概括總結出了河段疏浚挖后,疏浚挖河段及其上下影響河段的河演變及水面線變化的模式,即挖段逐漸回淤,挖上游段逐漸沖刷,並且其回淤及沖刷的強度隨時間的推移由大變小。
分享友人