樁箍 的英文怎麼說

中文拼音 [zhuāng]
樁箍 英文
pile band
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ名詞(緊緊套在物體外面的圈) hoop; ferrule; band Ⅱ動詞(用竹篾或金屬條捆緊; 用帶子之類勒住) bin...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用鋼筋砼護壁確保挖孔的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. Repairing technical requirement for special equipment of cutter suction dredgers part 5 : spud keeper

    絞吸挖泥船專用設備修理技術要求第5部分:鋼
  3. It has been proposed that the use of a ferrule as part of the core or artificial crown may be of benefit in reinforcing the endodontically treated teeth restored with post - and - core systems

    核修復時,在殘冠殘根的斷面設計結構,使其成為核或冠修復體的一部分,由此產生的效應可以增強修復后牙體組織的機械強度,從而受到越來越多的重視。
  4. The denizens were all enjoying the usual afternoon nap of an hour or so which the exceedingly early hours kept in summer - time rendered a necessity. at the door the wood - hooped pails, sodden and bleached by infinite scrubbings, hung like hats on a stand upon the forked and peeled limb of an oak fixed there for that purpose ; all of them ready and dry for the evening milking. angel entered, and went through the silent passages of the house to the back quarters, where he listened for a moment

    奶牛場里的居民,都在像平常一樣享受午後一個小時左右的小睡,夏天起床非常早,中午小睡一會兒是不可缺少的門前有一棵用來掛牛奶桶的剝了樹皮的橡樹固定在地上,樹權上掛著帶的木桶,木桶經過不斷的擦洗,已經讓水泡透了,洗白了,掛在那兒就像一頂頂帽子所有的木桶都洗靜了,曬幹了,準備晚上擠牛奶使用。
  5. The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method

    本文提出的優化設計方法,以單位長度的總造價為目標函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為約束條件,以截面高度,抗彎縱筋面積,抗剪筋數量等為設計變量,來建立優化模型,並用0 . 618法進行求解。
分享友人