residual distance-
The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1
林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。Ranked no. 1 in the world last year, italian cycling star bettini, won a gold medal in the men ? cycling road race, fulfilling a long held ambition and topping off a great two years
去年排名世界第一的義大利自行車明星貝蒂尼在男子自行車公路賽上贏得一枚金牌,從而了卻了一樁宿願並為他這成績斐然的兩年畫上了一個圓滿的句號。Piling load test for bridge str 17 near the wsd catchwater
鄰近於長沙引水道為橋編號17進行樁柱的承重測試In combination with the construction practice of abutment no. 2 great bridge and no. 1 medium - scaled bridge, the paper introduces the construction technology of rock - socketed piles in highway engineering
摘要通過邊墩2號大橋和羊山1號中橋的施工實踐,介紹嵌巖樁在公路工程中的施工工藝。Pile foundation drilling construction plan of kekexili 2 large bridge in qiangzang railway
青藏鐵路可可西里2號特大橋樁基鉆孔施工方案In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel
本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。General view - deep water region pier 2 - raised pile cap construction
深水區2號橋墩-外露樁帽建造The experiential formula between kc and base resistance q from cpt and, the relationship between ke and c # ( strength of concrete ) are also created by fitting 94 pressed pile testing date. based on analyzing the compacting effects caused by driving pile in loess and it ' s influence on bearing capacity and settlement, another two disturbance parameters, c and e, are proposed for multiplying respectively the parameters of soil cohesive c and deformation modulus es to reflect this effect. by fitting 51 driven pile testing date, we created an experiential formula between the e and r ( the modulus ratio between pile and surrounding soil ), also an experiential formula between the c and base friction resistance fs / pa from cpt of pile surrounding soil
在本文中分析了靜壓樁的沉樁擠土效應對其承載力與沉降特性的影響,在計算模型中引入了樁周土粘聚力c的修正系數k _ c和樁周土變形模量e _ s的修正系數k _ e來體現這種影響,通過對94根靜壓樁試樁資料進行擬合,建立了k _ c與樁端土靜力觸探的端阻q _ c之間經驗公式以及k _ e與c # (混凝土標號)之間的對應關系。By then, our joint inspection team had already finished the inspection of boundary markers no. 47 - 51
當時,我們組已完成了對47 - 51號界樁的聯檢。Fixed railway equipment. material for telecommunication and signalling overhead lines. caps for posts and small pillars
鐵路固定設備.通信和信號裝置架空線路器材.立柱和標樁用罩Pier 3 - extension of steel casing for bored piles construction
3號橋墩-建造鉆樁中的鋼套接駁工序Fixed railway installations. signalling. wire transmissions. reinforced concrete pickets
鐵路固定裝置.信號裝置.鋼索傳動.鋼筋混凝土尖樁Borehole completion process of rock socketed piles for the piers of yongding river no. 2 bridge
永定河2號大橋橋墩嵌巖樁成孔工藝Soil nailing near wsd catchwater has been completed and grouting for piling at the central pier of bridge no. str17 will commence
鄰近於長沙引水道的泥釘工程經已完成,與及將會為橋編號str17的中間橋墩展開樁柱灌漿的工程In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging
摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。Pile ng examination of the system based on the latest promulgated by the ministry of public security, " motor vehicle drivers license application and management " ( decree 71 ), the two examination subjects ( zhuangkao ), computer images using real - time detection technology and electronic infrared optical interface detection technology, i combine the companies creating two - dimensional moving object identification and tracking software through acquisition of vehicles running state examination pile pole, the signal line, after computer processing, analysis and judgment, the actual realization of the computer monitor screen on the basis of the examination process real - time simulation, tracking examination candidates track and record car line, is set admission, examination results published combines the real modernization zhuangkao tools
本系統依據公安部最新頒布的《機動車駕駛證申領及管理規定》 ( 71號令)中有關科目二考試(樁考)的規定,採用微機圖象實時檢測處理技術及電子紅外線光界面檢測技術,結合我公司獨創的二維移動物體識別跟蹤軟體,通過採集考試車輛運行狀態、樁桿、庫線等信號,經過微機處理、分析判斷,真正實現了在微機監視屏上根據考試過程實時模擬、跟蹤考生考車軌跡並記錄路線,是集錄取、考試、發表成績為一體的真正的現代化樁考工具。This paper presents analysis on the engineering geologic features, cause of revival and prediction of the developing trend of the captioned landslide in zigui county, together with the proposed treatment measures, which will be of reference value for other landslide treatment practices
摘要在論述三峽庫區秭歸縣歸州四號滑坡工程地質特徵、復活原因、後期變化趨勢的基礎上,提出滑坡治理方案,進行預應力錨索抗滑樁、樁間檔土板、植被護坡、地面排水等分項工程設計,總結本滑坡治理工程的設計經驗,供其它滑坡治理工程參考。Through the practice of deep foundation top - down for youyou international square, some key construction techniques were introduced, including structure of bored and double stirring piles, down - top construction in high - rise buildings, top - down in low - rise buildings, protection of railways, methods for excavation
摘要通過由由國際廣場深基坑逆作施工實踐,著重介紹了灌注樁加雙排攪拌樁止水帷幕圍護體系、主樓順作裙房逆作、電纜翻交、軌道交通四號線保護、挖土施工等關鍵施工技術。In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope
摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。Through the analysis of the status of huangbizhuang reservoir and other problems, such as its destruction caused by water seeping, and with the reference to the internal successful application, the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no. 0 + 840 and stake no. 5 + 740
通過分析黃壁莊水庫現狀及存在的滲透破壞等問題,類比國內成功的工程實例,本工程副壩在樁號0 + 840至5 + 700採用在壩體和壩基建混凝土防滲墻處理措施。分享友人