樁載重試驗 的英文怎麼說

中文拼音 [zhuāngzǎizhòngshìyàn]
樁載重試驗 英文
pile loading test
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 載重 : load; carrying capacity
  • 試驗 : trial; experiment; test
  1. Nowadays, the ways to detect the piles are various, and all of them are limited in some aspects. for instance, coring test do large scathe on the piles, and static load test will waste much time, money and energy, while some ways are hard to operate as the limitation of the length and the diameter of the piles, and the special condition on the spots, such as high - strain, low - strain, and so on. furthermore, the result can only be gained under the complex analysis of the collected wave, and under the validation of the coring test

    目前,工程中常用的基檢測方法很多,但都存在著一些弊端:有的對破壞性嚴,例如抽芯檢測;有的耗時、耗財、耗力,例如靜;還有的如低應變、高應變等檢測技術由於受到長、徑以及現場一些特殊情況的限制,操作很不方便,而且採集到的波形要經過比較復雜的處理分析方能得出結論,而這個結論卻還要輔助取芯手段加以證。
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次施工工藝的檢測和身質量及承力的檢,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基表明了荷與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注的荷傳遞和破壞機理、承力特性,進行了富有成果的現場測工作;數據表明側摩阻和支盤端阻起很要的作用,端阻力所佔比例甚少。這與設計基時的計算模式相差很大,承力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  3. In combination with the work of < the design and technical construction rules of flexible dolphin pier in port engineering > of designing institute of water transport of transport, the data of some typical experiments of domestic and international pile foundation were analysed emphatically. through comparion of the relation of p - y curves between single pile and pile group under lateral loading and lateral reciprocating loading, the experience formula of p - y curve of single pile under reciprocating loading role is put forward

    本文結合中交水運規劃設計院《港口工程柔性靠船墩設計與施工技術規程》的編制工作,著分析了國內外幾組典型的資料,通過對比水平靜、群和往復荷p ? y曲線的關系,提出了往復荷作用下的單p ? y曲線的經公式。
  4. Abstract : artifical intelligence methods are implemented to simulate thebehaviors of axially and laterally loaded piles using the field observation tests data obtain ed f rom the drilled shafts and driven piles. the optimal neural network model is deve loped using only simple input data of spt - n values and piles ' geometrical featu r es etc. the analysis for r. c piles of some projects is performed adopting the bp n n and grnn models respectively, and the obtained predicated results are compared w ith the data from conventional design method. it demonstrated the obvious advanta ges of neural networks in the design of pile foundations over the traditional me thods. this paper has an important practical significance and a referential worth iness in the design of pile foundations

    文摘:根據鉆孔和打擊的原型觀測的數據,運用人工智慧方法對橫向承和軸向承的工作特性進行模擬,並利用標準貫入( spt - n )值和的幾何特性等簡單的輸入數據,開發出相應的優化神經網路模型;然後,運用反向傳播神經網路模型和廣義回歸神經網路模型分別對某工程的鋼筋混凝土進行分析,並將求得的預測結果與常規設計法的結果進行比較,結果表明神經網路方法比傳統方法有明顯的優越性,在實際工程設計中具有要的參考價值和現實意義。
  5. It takes good use of these two numerical computation methods merits and it is valuable for defmiting the computation model of pile ? oil ; at the same time, it builds the computation model of compound pile foundation and uses the software ansys which is about finite element to build the mechanics model. in regular quality soil, the result worked by this way has good unanimity with traditional results, so it applies us strong evidence for using the way which this article tells us to solve problems which is difficult to handle in compound pile foundation, such as irregular quality, layer quality of the soil. at last, taking foundation soil ' s measuring data of liaoning technology university ' s test building for example, and using the way this article tells us to build compution module, we solve the sharing ration of pile and loading board

    本文利用有限元與邊界元耦合的方法求解土相互作用問題,充分利用兩種數值計算方法的優點,對確定土相互作用計算模型是一次有益的嘗;同時建立了群相互作月的數學模型,並利用有限元分析軟體ansys建立其力學模型,在均質土體中取得了與傳統解答較好的一致性,從而為拓展利用本文所述建模方法,解決群作用機理研究中難以處理的土體成層、非均質等性質,提供了有力的根據;最後,以遼工大實館地基土實測資料為例,利用本文建模方法,求解出承臺與的荷分擔比,對安全、經濟地進行群基礎設計具有要指導作用和應用價值。
  6. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內及原位測指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷?沉降曲線與實測荷?沉降曲線的擬合效果,從而達到可在不做靜或少做靜的情況下通過剪切波速和靜力觸探指標以及施工工藝修正系數等預測黃土地基中鉆孔灌注性狀,這對于工程初步設計中減少設計的盲目性具有十分要的現實意義。
  7. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場、理論計算和有限單元分析,對巖溶地區鉆孔灌注的施工工藝、荷傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些要結論,有效地指導了該類工程的設計和施工。
分享友人