標志架 的英文怎麼說

中文拼音 [biāozhìjià]
標志架 英文
sign gantry
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (志向; 志願) aspiration; ambition; ideal; will 2 (文字記錄) records; annals 3 (記號)...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 標志 : signmarksymbolhallmarkblipemblemdenotationtagensignflagattributemarkerbrandstypeindex
  1. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋鉆探項目船下后續研究的一部分,對184航次中的1146站位和1147 、 1148站位的樣品進行了分析和研究,在船上科學家已經建立起的地層框的基礎上進一步加密采樣,對生物事件化石類別進行數量統計,進一步確定了12個生物事件在鉆孔中的深度,建立起了兩個站位的高解析度的鈣質超微化石生物地層框
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐測量的方法,包括測量點的選取、測量系統的建立及測量坐的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  3. The intelligent inspect system for roof slts in shenzhen citizen center is selected as a practice engineering background in this paper, the structure is a new political and cultural center and a symbolic architecture in shenzhen which overall structural area is 2. 1 million square meter, the roof is the largest space lattice in the world which is 486 meter long and 154 meter wide

    本文以深圳市民中心為實際工程背景,深圳市民中心是深圳市新的政治文化中心和性建築。其總建築面積近21萬平方米,大屋頂空間網結構長486米,寬154米,是迄今為止世界上最大的網結構。
  4. Therefore, we can make such a discussion about kb that knowledge rule is framed by using temporal logic and using temporal logic assertion to infer. thus makes temporality as the unified symbol of rules which drive in kb

    由此,針對知識庫,可以做一個這樣的探討:使用時態邏輯對知識規則進行構,在知識庫內則用時態邏輯斷言進行推理,從而使得對知識庫的規則驅動有了一個統一的? ?時態。
  5. Within the designated contract area, there are about 50, 000 road lighting points, 5, 000 supply points for traffic bollards and 700 illuminated gantry signs and roadside directional signs

    指定合約范圍內約有50 , 000盞路燈5 , 000個安全島指示燈供電點700個具有照明設備的高道路及路旁路線指示
  6. Above all, this paper discusses the frame, system functions, user demands, construction preconditions and conformity planning based on the introduction of study and application situation ; then, planning project, planning process and foundation of guidance system in grades, including guidance strategy in four grades are studied ; whereafter, the thesis analyzes setting requirements and modes, installation angle, dimension and colour, display contents and arranging sequence and fonts of parking guidance sign, it is mainly studied that calculational method of distance between the variable message signs

    本論文首先在介紹停車誘導系統研究與應用情況的基礎之上,論述系統框結構、系統功能、用戶需求、建設停車誘導系統的條件與停車誘導系統與智能交通系統的整合規劃等問題;接下來制定了停車誘導系統規劃方案,提出區域性停車誘導系統規劃步驟,研究分級誘導體系的建立方法,提出四級誘導策略;然後分析停車誘導布設的具體要求、設置方式、安裝角度、尺寸與顏色、顯示內容及排列順序、字體等問題,重點研究並給出可變信息板設置間距的計算方法。
  7. The landmark building organize the city space, and the image of city is a psychological scheme in the mind when people cognize the city space

    性建築是組織城市空間的框,城市意象是人們對城市空間認知的心理圖式。
  8. Installed noise barrier panels at fanling near avon park and erected fuel service sign gantry

    近粉嶺碧湖花園已裝置的隔音板及已安裝的燃油服務標志架
  9. On busy road, signs may be placed on gantries above the road

    在交通繁忙的道路,可能設有空的方向
  10. Innovation of the aero maintenance system based on augmented reality ( ar ) technology and eye tracking technology, which can give real - time instruction for maintenance, is vital for enhancing the accuracy of maintenance and reducing the cost of maintenance. in the paper, the study work include 3 sections, as following : firstly, deducing 3d registration algorithm based on markers, depicting the display and 3d display technologies of artificial matters, and realizing 3d registration function specifically ; secondly, establishing an eye - movement measurement system based on the infrared television method, making use of the thoughts of ranks superimposition to withdraw the pupil center coordinates, and giving the thaught of recombining the position relation of purkinje spot to determine the eye sight direction primarily ; finally, describing the basic theory of augmented reality maintenance guiding system in detail, and introducing the software function and hardware frame, which will provide the foundation for the further study of this system

    本文的研究工作主要包括以下三個部分:首先,改進了有點的三維注冊演算法,並具體實現了三維注冊功能,最後試驗驗證了注冊演算法的正確性,為將來基於無點的發動機維修誘導系統的研究提供基礎和實踐經驗;其次,描述了基於紅外電視法的視線跟蹤系統的基本原理,對眼動信號處理技術做了初步的研究,即利用了行、列疊加的思想提取了瞳孔中心坐和普爾欽( purkinje )斑點的坐,闡述了結合瞳孔中心與普爾欽( purkinje )斑點的位置關系進行初步判定視線方向的方法;最後,詳細描述了所構建的增強現實維修誘導系統的基本原理、軟硬體框,為今後維修誘導系統的深入研製提供基礎。
  11. Temporary signs are usually mounted on portable stands but may also be found on posts like permanent signs

    臨時通常設在可移動的支上,有時也會設在固定的柱上。
  12. Take the mtr to quarry bay station and turn right at exit a, follow king s road for 5 minutes to mount parker road and you will see the first signboard of the green trail on your right

    從地下鐵路樽魚涌站a出口步出后右轉,沿英皇道步行5分鐘便會抵達柏山道。往右面看,你將會看見這自然徑上的第1個牌。
  13. The two sides managed to ease the first crisis in 1994 by signing the agreed framework, thanks to their exercise of restraint and mutual compromise. however, lack of mutual trust and ineffective implementation of the agreement, among other things, carried a foreshadowing of what was to follow in later stage

    由於較為克制與相互妥協,以簽署1994年《核框協議》為,美朝雙方化解了第一次朝核危機;但雙方缺乏互信、執行協議不力等原因,又為后來產生新的危機埋下了伏筆。
  14. He made the short films white man ( 1994 ) before directing his first feature film, barking dogs never bite ( 2000 ), followed by memories of murder, which awarded the best director in the san sebastian film festival in 2003

    在導演其第一部性電影《綁門口狗》 ( 2000年)之前,他製作了短片《白色人》 ( 1994年) ,接著他憑《殺人記憶》在2003年聖塞巴斯蒂安電影節上獲得最佳導演獎。
  15. These signs are often found near elevated roads, flyovers and underpasses

    這些多見于高道路行車天橋和隧道。
  16. The public lighting system generally consists of conventional road lighting, village lighting, gantry sign lighting, roadside directional sign lighting and the associated network of cables, ducts and peripheral items

    公共照明系統一般包括傳統的街道照明設備鄉村照明設備高道路照明設備路旁路線指示照明設備及相關的電纜管道及附屬裝置。
  17. The chapel and the pilgrim s hall are also available for sunday worship and retreats. a 12 - metre - high big cross which stands to the east of the centre is the hallmark of the centre

    教堂的聖殿和雲水堂可作主日崇拜及退修避靜之用。叢林的東面屹立著一大十字,高12米,是叢林的
  18. For gantry sign only

    只適合高道路
  19. There are emergency exits on both sides of the aircraft in addition to the main entrance doors, and all exits are clearly marked

    飛機除通常出口外,在客艙左、右側還有緊急出口,分別有緊急出口的明顯
  20. Installation of sign gantries and street lights

    安裝標志架及道路照明設備
分享友人