標準化工程 的英文怎麼說

中文拼音 [biāozhǔnhuàgōngchéng]
標準化工程 英文
standardized project
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 標準化 : standardization; standardizing; normalizing; unification; standardize
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. In addition to being very small - footprint, frotz makes a sort of standardized litmus test of whether a system s programming toolkit is reasonably complete

    除了占資源少之外( small - footprint ) , frotz還進行一種的最終測試,測試系統的編具包是否是足夠完全的。
  2. Senior advisor of company, is the first drafter of the arc furnace transformer standards and the copy writer of the only domestic works onfurnace transformers as amember of bational transformer standardization committee and editoral com - missioner of magazine transformers

    高級顧問張懋魯高級師為全國變壓器委員會委員變壓器雜志編委,是煉鋼爐變壓器的第一起草人,是國內唯一電爐變壓器著作的撰稿人。
  3. We make moldings strictly according such process, plan and assign jobs, designing the mould structure, rough working, accurate working, test, benchwork assembly, post treatment, test and production. we adopt standard moulding accessorics in order to make our customer fast and accurately get what they need at any time

    我們嚴格按照「策劃分配任務?模具結構設計?粗加?精加?檢測?鉗裝配?后處理?檢測?生產」的生產藝流進行模具製造,採用的模具配件讓我們的客戶隨時、快捷、確地獲取您之所需。
  4. Through establishment of standardization and value engineering,

    透過.價值
  5. At the same time, the function of measuring coal in every coal storage bunker and measuring coal before its entering into every boiler greatly improves productivity of the whole loading and unloading coal system. on the aspect of operation technics of the loading and unloading coal system, this article analyzes factors which affect operation technics of coal - whippers, stacking conveyers and pusher tractors. no standardization in daily operation, low safety, long operation time and out of line among different machines reduces the efficiency of the loading and unloading coal system

    卸煤操作藝方面,主要分析了卸船機、堆取料機和推扒機在日常作業過中影響作業藝的因素,在日常作業過中主要存在問題是無作業要求,安全得不到保障,作業時間長,各作業機械之間配合差,從而影響整個卸煤系統的作業效率,本文通過對卸船機、堆取料機、推扒機作業流的設計,規定了單個機械的作業序,以及相互之間作業時的配合方法,使卸船機作業和堆場作業更規范,同時,大大縮短卸船作業時間,提高了碼頭泊位利用率,減少機械作業時間,從而提高了整個輸煤系統的作效率。
  6. It is based on the above reasons, the leading system of flood, windstorm, drought control and the construction of water conservancy information engineering and the principle of theory and practicality are combined. based on the continuous development the following contents are researched in this paper : 1. the flood occurred law on major rivers and flood problems and flood control measure

    正是基於這種考慮,本論文結合廣州市三防指揮系統和廣州市水利信息的建設,本著理論性與實用性相結合的原則,從可持續發展的角度,重點研究以下內容: 1 、廣州市主要河流洪水發生的規律及存在問題與防洪措施; 2 、廣州市現有防洪措施的防洪與可靠性; 3 、洪水預報與調度系統的方法與技術路線; 4 、現代防洪管理。
  7. Zhang lixia ( water conservancy engineering ) supervised by professor shi kebin this paper mainly discussed a method for multi - goal network ' s optimization. since the network plan was brought forward, the criterion for evaluating network was time cost resource all along. in this paper, through massive study on achievements the predecessors had done the author posed a new criterion : quality, and set up the network ' s quality model ; simultaneously, the author established the network ' s multi - goal model by synthesizing the existing optimum models, also found the finite not bad solution of the model ; because the four goals was in contradiction with each other, using the multi - goal decision theory can optimize the network project scientifically and objectively

    本文在對前人關于網路計劃研究結論的總結分析的基礎上,探討了評價網路計劃優劣的各則,提出一種新的評判則:質量,並建立了網路計劃的質量模型;針對目前網路計劃多是單目的優,綜合網路計劃就各目方法的研究理論,建立了網路計劃的多目模型,並將質量模型融入其中,根據網路計劃的特點,解出該模型的有限個非劣解;由於各優之間的矛盾性、不可公度性,用多目決策理論的方法,科學而客觀地對網路計劃進行了多目,從而避免了人為決策的盲目性、主觀性。
  8. The study of e - government ' s application security based on j2ee e - govemment is a system engineering which makes the governmental work be standardized, serviced, informationed, netted and opened

    電子政務是一個將政府、服務、信息、網路、公開的系統
  9. According to the principles of " positive and steady, scientific programming and rational layout ", the cpc municipal committee and municipal government have programmed the city from a high starting point, constructed the city according to a high standard, administered the city at a high level, managed the city with a high efficiency, made the city green with a high quality made a total investment of nearly 2billion yuan, completed a large group of infrastructures and greening and beautifying projects in succession, made the size of constructed downtown area increased from less than 6square kilometers to 132squme kilometers, completed greenbelts with an area of 316hectares, made green percentage of coverage up t032 %, per capita public greenbelt area up to 10. 72 square meters, initially formed a garden - style ecologieal city with " trees shadowing the street, soft green grass carpeting the ground, greening all the year round, blossoming out in 3seasons ", gained honors and titles of " state - level excellent city in urban environment comprehensive renovation ", " provincial - level landscape garden city ", " award of residential environment of henan "

    市委、市政府按照"積極穩妥、科學規劃、合理布局"的原則,高起點規劃城市,高建設城市,高水平管理城市,高效益經營城市,高品位綠城市,共計投資近20億元,相繼完成了一大批基礎設施和綠,建成區面積由原來的不足6平方千米,擴大到132平方千米,市區擁有綠地316 :公頃,綠覆蓋率達32 % ,人均公共綠地面積10 . 72平方米,一個"綠樹成蔭、芳草遍地、翠點四時、花開三季"的園林生態城市已具雛形,榮獲"全國城市環境綜合整治優秀城市" 、 "省級園林城市" 、 "河南人居環境獎"等榮譽稱號。
  10. The technological difficult point of promoting the accounting process of informatization to china ' s economic depth field is the stressing standardized problem of the information - based accountant ' s working system

    促進信息會計進走向中國經濟縱深領域的信息技術難點,是信息會計的作系統問題越來越顯得突出。
  11. Be responsible for cost reduction, standardization of components, the transition of new designs into the plant, troubleshooting of manufacturing line issues and other project related to product engineering at blt plant

    對降低零件的成本,以及其,實現新設計向廠運用的過渡,發現生產線產生的故障並對其進行解決,以及其它在百力通重慶廠內與生產師相關的項目。
  12. With the tourism development, various requirements require that the receiving organization not only do its best to increase product, but also keep up with the time closely to improve the quality of tourism reception, including the preparation before receiving, standardizing and procedure in the course of reception, and feedback after receiving

    摘要隨著旅遊業的飛速發展,需求形式日益多樣,接待機構不僅要在增加旅遊產品的花色品種上下功夫,還要緊跟時代的步伐,從接待前的作、對客服務的、接待后的反饋管理三個方面的若干細節提高旅遊接待質量。
  13. The primary difficulties the thais are experiencing include lack of feedback from users, lack of documentation, and conflicts with other thai localization projects because of a lack of coordination and standards

    泰國開發者面臨的主要問題是缺乏來自用戶的反饋,缺乏文檔,以及由於缺乏協調和而與其他泰國本地產生的沖突。
  14. Strict quality control and first rate products : strict quality control goes with every process of manufact - ure of ss steel shots. our products can modernize your surface processing work

    嚴密的品質管理,材質均勻: ss鋼丸每一個生產過皆經過嚴密的品質管理,材質均勻,可使表面處理作之進行
  15. Window manager icons - the purpose of the wm - icons project is to standardize desktop icon issues and to provide an efficient configurable icon distribution

    視窗管理軟體圖的目的在於使桌面圖表和提供有效的可控制圖
  16. B ds may involve themselves by joining the xml coordination group xmlcg, which is the top - level consensus making body for standardising data elements

    各部門可以參與可擴充示語言協調小組。該小組是負責數據的最高層組織,監察協調作的過
  17. Jiaxing crane - releasing garden 1 # 2 # 3 # 7 # building and underground garage. total construction area is 31200 sqms. 20 - floor high framework building. construction height is 69. 8 meters. jiaxing security and civilization templet construction site

    嘉興市放鶴洲花園1 # 2 # 3 # 7 #樓及地下車庫,總建築面積31200平方米,為20層框剪結構高層住宅樓,建築地面高度69 . 8米。該為浙江省文明施地。
  18. 6 ip design flow in the process of building ip library is researched in this dissertation. design flow and methodology of ip core - - 8 bit risc micro - controller soft ip core ( hgd08r01 ) and the demonstration of hgd08r01 soft ip core complying with vsia standard is gi

    6 、研究了ip庫建設中的ip設計流,並具體研究芯核類ip ?一八位risc二微控制器ip軟核( hgd08r01 )的設計流和設計方法,並依據vsia對2 hgd08r01ip軟核實施了作。
  19. Standardization - part 4 : working procedure

    作.第4部分:
  20. Thirdly, the implementation of the first stage of cy6 - cims is introduced, which includes nes, dbs, eds and mis. in this paper the solution of some key technology is especially introduced such as employee training, cems standardization, . basic data preparing, business process reengineering ), and system integrating

    詳細地介紹了一期中各分系統的實際實施情況,包括網路分系統( nes ) 、數據庫分系統( dbs ) 、設計分系統( eds )和管理信息分系統( mis )的實施情況,重點介紹了系統實施中人才培訓、作、基礎數據備、業務流重組以及系統集成等各種關鍵問題的解決,並對實施作了系統的經驗總結。
分享友人