模型試驗 的英文怎麼說

中文拼音 [xíngshìyàn]
模型試驗 英文
bench scale test
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  • 試驗 : trial; experiment; test
  1. To study the flexural behavior, ultimate bearing state and laws of internal force redistribution of prestressed concrete continuous beams cast by different construction methods, the model tests for three pieces of the continuous beams were carride out, in which three kinds of the construction methods, such as those of lowering formwork supports at one time, transferring simply - supported structure into the continuous one and casting the beam by cantilever construction, were considered

    摘要為研究不同施工方法下預應力混凝土連續梁的彎曲性能、極限受力狀態及內力重分佈規律,進行了3根連續梁模型試驗,分別考慮一次落架、簡支變連續和懸臂施工3種施工方法。
  2. And rock triaxial serve testing system is used, through model test involving bedded planes and a set of joint normal to the bedded planes in rock mass, multiple sliding failure affected by properties of joints and confining pressure is analysed, the condition triggering multiple sliding failure and characteristics of failure plane are given, under the co - action of inclination of connective joints ( bedded planes ), interlocking conditions of critical joints and confining pressure

    並在室內利用巖石三軸剛性伺服機,通過模型試驗對巖體的層面和一組與層面正交的節理的情況進行擬研究,分析了結構面性狀和圍壓對復合式滑移破壞的影響,給出了在貫通性結構面(層面)傾角、非貫通性結構面以及圍壓等因素共同作用下,節理化巖體發生復合式滑移破壞的條件以及破壞面特徵。
  3. Experimental investigation on vibration reduction of hull model by bubbly layer

    艦船結構氣幕減振的模型試驗研究
  4. Code for propeller cavitation tests in uniform flow carried out in cavitation tunnel

    空泡水筒均流中螺旋槳模型試驗規程
  5. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  6. The additional flow is formed by the device of dentoid baffle, and the application of the device of dentoid baffle cooperated with a stilling basin has been investigated by systematic model tests. based on the research results, the hydraulic problems such as the characteristics of hydrodynamic pressure and cavitation on the head of the denotid baffle, the properties of flow under the condition that the device of denotid baffle is used with a stilling basin, the hydraulic computation about a stilling basin, the estimation of energy dissipation and its various affection factors, the mechanism and effect of energy dissipation, and distributions of velocity and pressure and aerating concentration, etc, have been analyzed ; the method and step of hydraulic design of device of denotid baffle by which the additional flow is produced has also been proposed

    文中利用齒墩設施實現附加射流,對齒墩設施與消力池聯合應用進行了大量的和系統的模型試驗,分析研究了中低佛勞德數條件下,齒墩墩頭的動水壓強及空化特性,齒墩設施與消力池聯合應用時的流態特性,消力池的水力計算,消能量的估算及其各種影響因素,消能機理和效果,消力池內的流速、壓強特性,摻氣濃度分佈等水力學問題,並提出了實現附加射流齒墩設施的水力設計方法和步驟。
  7. Dynamic characteristic of curve - arch - bridge for model test

    彎拱橋動力特性的模型試驗
  8. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  9. Furthermore, a plan of designing the small model having a step bottom is provided in the experiment of restricting model. and a plan of jetting from foreside and middle part of the large scale model is adopted in experiment, all these are our innovative points

    此外,在小比尺模型試驗中,還提供了一種斷階噴氣設計方案,在大比尺模型試驗中,採用了首中部同時噴氣的方法,這些都是本文的創新之處。
  10. Investigation on failure of granitic residual slope by using centrifugal model test

    用離心模型試驗研究花崗巖殘積土邊坡的破壞特性
  11. First, the generalized elastic theory is employed into in single pile analysis. the degeneration solution is accordant with poulos " results. analyzing the load - displacement behavior of the battered pile, the results agree well with meyerhof ' s model experiments and zhanglm ' s centrifuge experiments

    對于直樁,退化為彈性理論的計算結果同poulos的結果一致,退化為荷載傳遞法與他人的結果基本吻合;然後研究了斜樁的荷載-變形特性,把公式用於計算meyerhof的模型試驗以及zhanglm的離心機的荷載-位移關系,發現同結果吻合較好。
  12. Valuing of the influence degree of the additional temperature field of mutative temperature similar material in geomechanical model test

    變溫相似材料在地質力學模型試驗中附加溫度場的影響程度評價
  13. Study on correlation between stability of consequent rock slope and obliquity of rock layer by simulation experiment

    巖層傾角影響順層巖石邊坡穩定性的模型試驗研究
  14. In the thesis, fem and plexiglass model test are used for the research of shear lag effect on double - level continuous box girder

    本文運用有限元分析和有機玻璃模型試驗方法對雙層荷載連續箱梁的剪力滯效應進行深入研究。
  15. Some problems of model test methods for podded propulsor

    吊艙式推進器模型試驗方法中的一些問題
  16. Modeling experiments and studies on retractable flanging device for shaftwalls

    鉆井井壁可縮性接頭模型試驗研究
  17. This is a distributing trend. all that account for that the project have quite obviously advantage. form the experiment of different density stream, the stream come into being is quit possibly. can the sandiness move to the dam and expel from the reservoir suppend on some complications

    在壩前局部模型試驗中,方案二的出庫含沙量平面上呈底孔大、電廠和取水口小的分佈趨勢,而初設方案運用則相反,說明方案二具有較明顯的優越性。
  18. According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed

    根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。
  19. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的隧道襯砌結構外水荷載的作用規律。
  20. Hydraulic model test of spillway in baiyinhua reservoir

    白音花水庫溢洪道水工模型試驗研究
分享友人