模板工作 的英文怎麼說

中文拼音 [bǎngōngzuò]
模板工作 英文
form work
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. Indicator for working status, level adjusting point and level testing point are on the front panel

    塊前面狀態指示燈及電平調整點電平檢測點,輸出電平大於108dbuv 。
  2. This model has been widely used in the advisement seeking in recent years, and proved to be useful. it is worthy of being popularized

    近一年多的時間里,該曾多次在咨詢中使用,實踐證明,其實用性較強,具有一定的推廣價值。
  3. It revealed that hexagonal structure was easily synthesized in the neutral medium, and lamellar structure was inclined to prepare under basic condition, and from the cooperative charge density matching mechanism and function of manganese iron and template molecular, the alkalescence influence on the structure was explained, and appropriate neutral hexadecylamine ( hda ) availed to synthesis of mesophase with more ordered degree for the mediation of packing parameter

    通過水熱合成方法對錳氧有序相的合成進行初步研究,探討合成藝對有序結構的影響:在中性的條件下,易合成六方有序結構產物;在堿性條件下,更易合成層狀結構產物。並從電荷匹配的原則及錳離子與劑間鍵合用解釋了堿量的多少對合成產物結構的影響。
  4. This paper mainly aims at the characteristics of the hardware and software structure of the parallel computer on satellite, and has fulfilled researches of fault tolerant technique in three aspects of control theories and engineering : the first research of the system level fault - tolerant module is based on the system structure of the parallel computer on satellite, a kind of cold backup module and a kind of hot backup module for multiprocessor computer have been put forward. then the research of software fault tolerant technique which is based on the operate system named rtems has been carried, the mission level fault - tolerate arithmetic and the system level fault - tolerate mechanism and strategies based on the check point technique have been put forward, at the same time the self - repair technique of software which has used the technique of system re - inject has been studied. finally the technique of components level fault - tolerant based on fpga has been studied, a kind of two level fault - tolerant project which aims at the fault - tolerant module of the parallel computer on satellite has been put forward, and the augmentative of circuit that project design realization need is little, this project can avoid any breakdown of any part logic circuit of the fpga

    本課題主要針對星載并行計算機體系結構及軟體結構的特點,從如下三個方面進行了容錯控制理論研究和實踐:首先進行了基於星載多cpu并行計算機體系結構的系統級容錯型研究,提出了一種多cpu冷備份容錯型和一種多cpu熱備份容錯型;然後進行了基於rtems操系統的軟體容錯技術研究,提出了任務級容錯調度演算法以及基於檢查點技術的系統級容錯恢復機制和策略,同時研究了利用系統重注入進行軟體在線自修復的容錯技術;最後研究了基於fpga的部件級容錯技術,提出了對容錯塊這一星載并行計算機關鍵部件的兩級容錯方案,實現該方案所需增加的電路少,可避免級晶元以及fpga晶元內部任何邏輯發生單點故障。
  5. Hardware engineers started working at higher levels of abstraction and using simulators and other forms of automation to do all the stuff they used to do on breadboards

    硬體程師從抽象的更高層次開始,並使用擬器和其他自動化的形式在電路測試上進行原料填充。
  6. In this thesis, used thermocouple to sense the temperature in the space of the hearth, attributed the thermocouple based on calorifics and scientific arithmetic, acquired data by data acquiring card, processed data according to the demand of setting up temperature model and drawing graphics and then caculated the coordinates of isothermal points and normals of isothermal facets, ascertained the order of connecting points and the model of construct, drawed the isothermal facet of temperature field with opengl at last

    通過數據採集卡進行數據採集並與計算機介面進行數據處理。然後,將處理后特殊點的溫度數據依據marchingcubes演算法建立數學型求取等溫面上的點的坐標及各點的法向量等。最後,確定計算的三維坐標點的連接順序和拓撲型,利用opengl進行等溫面的繪制、消隱和式變換等
  7. Adjacent to the table is the third unit which contains a belt conveyor, a grid trimming die and another belt conveyor.

    臺相鄰的第三個裝置,包括傳送帶,柵修邊用具和第二條傳送帶。
  8. The third ways of making stencil is electroform. hole forming by the way of nickel deposit onto the copper cathode

    的第三種藝是電鑄成型。在這個藝中,鎳沉積在銅質的陰極心上以形成開孔。
  9. In the hardware design, the paper completes modules ’ design like outside memory, patulous a / d, patulous d / a, rs232 communication, ecan communication, led control, keyboard control, distant control, emulation, reset, logic voltage switch, dsp supply power regulate and ac - dc power circuit, as well as room layout design like anterior panel, back panel etc. and dsp transfers data with peripheral equipments except outside memory using serial ports. besides, the whole circuit is configured in interrupt response. thus, it can meet system demand as well as take full advantage of tms320f2812 ’ s hardware resource. in the software design, the paper finishs programs like the interface programms intercommunicates with people, the distant control program, ad and da modules ’ control program, in addition, the paper select the velocity and acceleration state - feedback algorithm and is written in the program. the software design uses dsp integrate exploiting environment named ccs2. 2 of ti inc. as software instrument, and programs with the combination of c language and assembly language. moreover, in order to maintenance or modify the software expediently and shorten software ’ s exploitation time, the design adopt software modularization technique. finally, some air cylinder experiments are carried out to proved that the pneumatic controller is very practical

    在硬體設計中,本文完成了片外存儲器擴展、 a / d擴展、 d / a擴展、 rs232通信介面、 ecan通信總線介面、液晶顯示控制、鍵盤控制、遠程控制、擬、復位、邏輯電平轉換、 dsp電源校正電路和ac - dc電源等塊設計以及控制器前面、後面等的空間布局設計。其中dsp與除外部存儲器的外圍設備之間的數據傳送全部採用串口通信,同時系統電路配置成中斷響應方式,這樣既滿足了系統要求,又充分利用了tms320f2812的硬體資源。在軟體設計中,本文完成了人機界面功能塊、遠程控制塊、 ad擴展塊、 da擴展塊、速度和加速度狀態反饋的控制演算法的程序設計。
  10. Then, the detailed research and developing process is discussed : the in - system functions implementing in cpld ; hardware modules design of the main controlling board and the customer ' s board ; testing the hardware modules one by one. and then, the software flow chart of the design of call management and telephonist ' s services are introduced

    本文詳細介紹了改型設備的研製過程,包括cpld片內功能設計實現、主控制和用戶各功能原理和設計實現、各硬體塊功能測試等,最後給出了局內呼叫處理功能和話務員服務功能的軟體實現流程。
  11. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施效,減少了倉面污染;程大量採用定型鋼技術,提高了壩體混凝土成型質量和程進度;在二期混凝土施區域,為免除人鑿毛勞動強度,採用永久性免拆金屬為一期混凝土;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土施系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  12. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、程、混凝土程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等施環節組成。文中介紹的採用胎具製和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種的設計、製要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施借鑒。
  13. Pcb board is finished by using protell99se. power supply module, signal - sampling module, mcu, keyboard input, lcd module, and cpld are designed. the third chapter completes the software design and the debugging in keil environment

    然後利用protell99se平臺完成pcb圖的設計和制,根據晶元資料設計出供電塊,信號採集塊,單片機系統,日歷時鐘晶元,鍵盤輸入,液晶顯示系統,可編程式控制制塊和各個塊間介面。
  14. In order to solve the problem of the difficulty for the complicated shell in stripping away from the mould, the technical trait of the complicated shell has been analyzed, the twi - ejector using stripper plate and ejector sleeve has been designed, the mould operational principle and the structure trait have been discussed, and the die casting machine has been selected based on the swelling force calculation

    摘要針對復雜殼體壓鑄件難以脫的問題,分析了復雜殼體的藝特性,設計了卸料、推管二次推出壓鑄,論述了原理和結構特點,並且通過脹型力的計算選擇了壓鑄機。
  15. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平面桿系施裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間型(含擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施過程擬計算之後得出達到目標索力的合理的施步驟。
  16. Thirdly, thesis researches the principle of workflow / process management. based on windchill system, thesis analyzes the approach of workflow / process management in windchill. as a case, designing a approving workflow for ship drawing, which includes life cycles, workflow template, and projects

    其次,介紹了流管理的基本理論,結合windchill ,分析了windchill中流管理的實現方式和實現途經,以船體結構圖紙設計為例,設計了其生命周期、以及項目,並在windchill中實現這一圖紙審批流程。
  17. Presented the design goals of aiv simulation and debugging system. introduced the architecture model, theory and realization of agents " interaction ; the theory model, makeup, working theory and realization of shared blackboard system ; the design and realization of simulation subsystem, debugging subsystem and 2d map system. finally the experimental results were presented

    首先提出智能車輛擬調試系統的設計目標,然後介紹了系統的通訊機制(即agent的交互方式)的結構型、原理和具體實現,共享白系統(即agent的協調機構)的理論型、組成、原理和具體實現,以及擬子系統、調試子系統和二維地圖系統的具體實現。
  18. In the emulation task, i did the work of the stress concentration problem of the honeycomb structure

    ,主要分析了在多功能結構上開設埋孔的應力集中情況。
  19. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空業,給程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施階段的風致振動往往影響到施的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  20. Bing top down construction is carried out, the underground structure construction, including soil engineering, concrete casting and formwork, becomes more complicated and more strict. the paper gives a detailed research on the problems, and brings forward corresponding solutions. the monitor of the deep pit is also the important problem to the top down construction

    地下室主體結構也因採用逆法施,使土方程、砼逆澆築、程等變得更為復雜,要求也更加嚴格,本文對地下室主體結構施中的有關問題進行了較為詳細的研究,提出了相應的解決措施。
分享友人