模板工作 的英文怎麼說
中文拼音 [móbǎngōngzuò]
模板工作
英文
form work- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 板 : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
-
Indicator for working status, level adjusting point and level testing point are on the front panel
模塊前面板有工作狀態指示燈及電平調整點電平檢測點,輸出電平大於108dbuv 。This model has been widely used in the advisement seeking in recent years, and proved to be useful. it is worthy of being popularized
近一年多的時間里,該模板曾多次在咨詢工作中使用,實踐證明,其實用性較強,具有一定的推廣價值。It revealed that hexagonal structure was easily synthesized in the neutral medium, and lamellar structure was inclined to prepare under basic condition, and from the cooperative charge density matching mechanism and function of manganese iron and template molecular, the alkalescence influence on the structure was explained, and appropriate neutral hexadecylamine ( hda ) availed to synthesis of mesophase with more ordered degree for the mediation of packing parameter
通過水熱合成方法對錳氧有序相的合成進行初步研究,探討合成工藝對有序結構的影響:在中性的條件下,易合成六方有序結構產物;在堿性條件下,更易合成層狀結構產物。並從電荷匹配的原則及錳離子與模板劑間鍵合作用解釋了堿量的多少對合成產物結構的影響。This paper mainly aims at the characteristics of the hardware and software structure of the parallel computer on satellite, and has fulfilled researches of fault tolerant technique in three aspects of control theories and engineering : the first research of the system level fault - tolerant module is based on the system structure of the parallel computer on satellite, a kind of cold backup module and a kind of hot backup module for multiprocessor computer have been put forward. then the research of software fault tolerant technique which is based on the operate system named rtems has been carried, the mission level fault - tolerate arithmetic and the system level fault - tolerate mechanism and strategies based on the check point technique have been put forward, at the same time the self - repair technique of software which has used the technique of system re - inject has been studied. finally the technique of components level fault - tolerant based on fpga has been studied, a kind of two level fault - tolerant project which aims at the fault - tolerant module of the parallel computer on satellite has been put forward, and the augmentative of circuit that project design realization need is little, this project can avoid any breakdown of any part logic circuit of the fpga
本課題主要針對星載并行計算機體系結構及軟體結構的特點,從如下三個方面進行了容錯控制理論研究和實踐工作:首先進行了基於星載多cpu并行計算機體系結構的系統級容錯模型研究,提出了一種多cpu冷備份容錯模型和一種多cpu熱備份容錯模型;然後進行了基於rtems操作系統的軟體容錯技術研究,提出了任務級容錯調度演算法以及基於檢查點技術的系統級容錯恢復機制和策略,同時研究了利用系統重注入進行軟體在線自修復的容錯技術;最後研究了基於fpga的部件級容錯技術,提出了對容錯模塊這一星載并行計算機關鍵部件的兩級容錯方案,實現該方案所需增加的電路少,可避免板級晶元以及fpga晶元內部任何邏輯發生單點故障。Hardware engineers started working at higher levels of abstraction and using simulators and other forms of automation to do all the stuff they used to do on breadboards
硬體工程師從抽象的更高層次開始工作,並使用模擬器和其他自動化的形式在電路測試板上進行原料填充。In this thesis, used thermocouple to sense the temperature in the space of the hearth, attributed the thermocouple based on calorifics and scientific arithmetic, acquired data by data acquiring card, processed data according to the demand of setting up temperature model and drawing graphics and then caculated the coordinates of isothermal points and normals of isothermal facets, ascertained the order of connecting points and the model of construct, drawed the isothermal facet of temperature field with opengl at last
通過數據採集板卡進行數據採集並與計算機介面進行數據處理。然後,將處理后特殊點的溫度數據依據marchingcubes演算法建立數學模型求取等溫面上的點的坐標及各點的法向量等。最後,確定計算的三維坐標點的連接順序和拓撲模型,利用opengl進行等溫面的繪制、消隱和模式變換等工作。Adjacent to the table is the third unit which contains a belt conveyor, a grid trimming die and another belt conveyor.
與工作臺相鄰的第三個裝置,包括傳送帶,板柵修邊用模具和第二條傳送帶。The third ways of making stencil is electroform. hole forming by the way of nickel deposit onto the copper cathode
製作模板的第三種工藝是電鑄成型。在這個工藝中,鎳沉積在銅質的陰極心上以形成開孔。In the hardware design, the paper completes modules ’ design like outside memory, patulous a / d, patulous d / a, rs232 communication, ecan communication, led control, keyboard control, distant control, emulation, reset, logic voltage switch, dsp supply power regulate and ac - dc power circuit, as well as room layout design like anterior panel, back panel etc. and dsp transfers data with peripheral equipments except outside memory using serial ports. besides, the whole circuit is configured in interrupt response. thus, it can meet system demand as well as take full advantage of tms320f2812 ’ s hardware resource. in the software design, the paper finishs programs like the interface programms intercommunicates with people, the distant control program, ad and da modules ’ control program, in addition, the paper select the velocity and acceleration state - feedback algorithm and is written in the program. the software design uses dsp integrate exploiting environment named ccs2. 2 of ti inc. as software instrument, and programs with the combination of c language and assembly language. moreover, in order to maintenance or modify the software expediently and shorten software ’ s exploitation time, the design adopt software modularization technique. finally, some air cylinder experiments are carried out to proved that the pneumatic controller is very practical
在硬體設計中,本文完成了片外存儲器擴展、 a / d擴展、 d / a擴展、 rs232通信介面、 ecan通信總線介面、液晶顯示控制、鍵盤控制、遠程控制、模擬、復位、邏輯電平轉換、 dsp工作電源校正電路和ac - dc電源等模塊設計以及控制器前面板、後面板等的空間布局設計。其中dsp與除外部存儲器的外圍設備之間的數據傳送全部採用串口通信,同時系統電路配置成中斷響應方式,這樣既滿足了系統要求,又充分利用了tms320f2812的硬體資源。在軟體設計中,本文完成了人機界面功能模塊、遠程控制模塊、 ad擴展模塊、 da擴展模塊、速度和加速度狀態反饋的控制演算法的程序設計。Then, the detailed research and developing process is discussed : the in - system functions implementing in cpld ; hardware modules design of the main controlling board and the customer ' s board ; testing the hardware modules one by one. and then, the software flow chart of the design of call management and telephonist ' s services are introduced
本文詳細介紹了改型設備的研製過程,包括cpld片內功能設計實現、主控制板和用戶板各功能模塊工作原理和設計實現、各硬體模塊功能測試等,最後給出了局內呼叫處理功能和話務員服務功能的軟體實現流程。To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。Pcb board is finished by using protell99se. power supply module, signal - sampling module, mcu, keyboard input, lcd module, and cpld are designed. the third chapter completes the software design and the debugging in keil environment
然後利用protell99se平臺完成pcb圖的設計和制板工作,根據晶元資料設計出供電模塊,信號採集模塊,單片機系統,日歷時鐘晶元,鍵盤輸入,液晶顯示系統,可編程式控制制模塊和各個模塊間介面。In order to solve the problem of the difficulty for the complicated shell in stripping away from the mould, the technical trait of the complicated shell has been analyzed, the twi - ejector using stripper plate and ejector sleeve has been designed, the mould operational principle and the structure trait have been discussed, and the die casting machine has been selected based on the swelling force calculation
摘要針對復雜殼體壓鑄件難以脫模的問題,分析了復雜殼體的工藝特性,設計了卸料板、推管二次推出壓鑄模,論述了模具工作原理和結構特點,並且通過脹型力的計算選擇了壓鑄機。During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables
本論文採用自編平面桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程模擬計算之後得出達到目標索力的合理的施工步驟。Thirdly, thesis researches the principle of workflow / process management. based on windchill system, thesis analyzes the approach of workflow / process management in windchill. as a case, designing a approving workflow for ship drawing, which includes life cycles, workflow template, and projects
其次,介紹了工作流管理的基本理論,結合windchill ,分析了windchill中工作流管理的實現方式和實現途經,以船體結構圖紙設計為例,設計了其生命周期模板、工作流模板、以及項目,並在windchill中實現這一圖紙審批流程。Presented the design goals of aiv simulation and debugging system. introduced the architecture model, theory and realization of agents " interaction ; the theory model, makeup, working theory and realization of shared blackboard system ; the design and realization of simulation subsystem, debugging subsystem and 2d map system. finally the experimental results were presented
首先提出智能車輛模擬調試系統的設計目標,然後介紹了系統的通訊機制(即agent的交互方式)的結構模型、工作原理和具體實現,共享白板系統(即agent的協調機構)的理論模型、組成、工作原理和具體實現,以及模擬子系統、調試子系統和二維地圖系統的具體實現。In the emulation task, i did the work of the stress concentration problem of the honeycomb structure
模擬工作,主要分析了在多功能結構板上開設埋孔的應力集中情況。The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。Bing top down construction is carried out, the underground structure construction, including soil engineering, concrete casting and formwork, becomes more complicated and more strict. the paper gives a detailed research on the problems, and brings forward corresponding solutions. the monitor of the deep pit is also the important problem to the top down construction
地下室主體結構也因採用逆作法施工,使土方工程、砼逆作澆築、模板工程等變得更為復雜,要求也更加嚴格,本文對地下室主體結構施工中的有關問題進行了較為詳細的研究,提出了相應的解決措施。分享友人