模板工程 的英文怎麼說

中文拼音 [bǎngōngchéng]
模板工程 英文
boxing work
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. Hardware engineers started working at higher levels of abstraction and using simulators and other forms of automation to do all the stuff they used to do on breadboards

    硬體師從抽象的更高層次開始作,並使用擬器和其他自動化的形式在電路測試上進行原料填充。
  2. Electronics engineers build their models with breadboard circuits, using the laws of physics to determine expected values for various properties and then precision instruments to measure actual values

    電子學師通過電路試驗建造型,運用物理學法則確定不同屬性的期望值,然後使用精密儀器來測量出實際值。
  3. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛措施設計及水型試驗,對混凝土面堆石壩的導流渡汛標準、導流方式及其選擇、施期渡汛及壩體填築分期、圍堰設計以及施方案及總進度等與混凝土面堆石壩特點有關的問題進行研究,為建設提供一定的參考。
  4. The pressure drop of the compound tray can be regarded as consisting of dry plate pressure drop, clear liquid resistance, liquid surface tension resistance, and packing pressure drop. the model that has established can fairly predict the pressure drop of the compound tray, the value calculated by the model compared with that detected by experiment is less than 20 %

    復合塔的壓降可認為由干壓降、清液層阻力、填料層壓降和克服液體表面張力的壓降四部分組成,所建立的壓降計算型,能較好地預測復合塔的壓降,計算值與實驗值誤差在20以內,可用於設計。
  5. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形墻體設計、方案選擇及施藝等技術難題,筆者結合青島市藝術中心藝術表演劇場三維空間雙曲線清水砼墻施,在傳統的單曲線可調式大的基礎上進行了創新,很好的解決了雙曲線的技術難點,為異型構件的設計、選擇開拓了又一條思路。
  6. In the hardware design, the paper completes modules ’ design like outside memory, patulous a / d, patulous d / a, rs232 communication, ecan communication, led control, keyboard control, distant control, emulation, reset, logic voltage switch, dsp supply power regulate and ac - dc power circuit, as well as room layout design like anterior panel, back panel etc. and dsp transfers data with peripheral equipments except outside memory using serial ports. besides, the whole circuit is configured in interrupt response. thus, it can meet system demand as well as take full advantage of tms320f2812 ’ s hardware resource. in the software design, the paper finishs programs like the interface programms intercommunicates with people, the distant control program, ad and da modules ’ control program, in addition, the paper select the velocity and acceleration state - feedback algorithm and is written in the program. the software design uses dsp integrate exploiting environment named ccs2. 2 of ti inc. as software instrument, and programs with the combination of c language and assembly language. moreover, in order to maintenance or modify the software expediently and shorten software ’ s exploitation time, the design adopt software modularization technique. finally, some air cylinder experiments are carried out to proved that the pneumatic controller is very practical

    在硬體設計中,本文完成了片外存儲器擴展、 a / d擴展、 d / a擴展、 rs232通信介面、 ecan通信總線介面、液晶顯示控制、鍵盤控制、遠控制、擬、復位、邏輯電平轉換、 dsp作電源校正電路和ac - dc電源等塊設計以及控制器前面、後面等的空間布局設計。其中dsp與除外部存儲器的外圍設備之間的數據傳送全部採用串口通信,同時系統電路配置成中斷響應方式,這樣既滿足了系統要求,又充分利用了tms320f2812的硬體資源。在軟體設計中,本文完成了人機界面功能塊、遠控制塊、 ad擴展塊、 da擴展塊、速度和加速度狀態反饋的控制演算法的序設計。
  7. The design and machining technology process of its molding part including the front moulding plate 、 front mould kernel 、 back mould plate 、 back mould kernel 、 back mould set piece 、 incline guide pin 、 slide steatite etc, and the choice and calculation of technology parameters of the impotent part, the design process of extrusion outfit, inject system and other makeup are specified in detail ; test and product have been introduced

    詳細地敘述了具成型零件包括前、前仁、后、后仁、后鑲件、斜導柱、滑塊等的設計與加藝過,重要零件的藝參數的選擇與計算,推出機構與澆注系統以及其它結構的設計過,並對試與產品缺陷作了介紹。
  8. Then, the detailed research and developing process is discussed : the in - system functions implementing in cpld ; hardware modules design of the main controlling board and the customer ' s board ; testing the hardware modules one by one. and then, the software flow chart of the design of call management and telephonist ' s services are introduced

    本文詳細介紹了改型設備的研製過,包括cpld片內功能設計實現、主控制和用戶各功能作原理和設計實現、各硬體塊功能測試等,最後給出了局內呼叫處理功能和話務員服務功能的軟體實現流
  9. Thirdly, the paper discusses the driver of the peripheral equipment, how to port the uc / os - n and uclinux, h. 323 protocol and the application of the system in the digital speech classroom. also some software and hardware measure are adopted to enhance the system stability. at last, the shortcoming and the something to be improved are given. dsp can be used to realize real - time speech coding algorithm, and after porting ( ac / os - n, arm can manage the keyboard, the lcd and the ethernet peripheral etc. then the embedded network system with specific purpose can be used in others fields, such as pda, set of top, web tv, ect

    在實際設計實現中,為提高系統軟、硬體整體穩定性和可靠性,使用了以下幾種方法: ( 1 )低電壓復位、抗電源抖動能力、增加時鐘監測電路、抗電磁干擾能力、散熱等技術; ( 2 )多層pcb設計,線路結構緊湊,電源部分採用數字5v 、 3 . 3v 、 3v 、 1 . 8v和擬5v多電源供電; ( 3 )選用表面貼和bga封裝的器件; ( 4 )按照軟體的要求進行系統分析,規劃系統框圖、流分析、塊劃分,減小了不同塊的相關性,從而最大限度避免了錯誤的發生。
  10. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施效,減少了倉面污染;模板工程大量採用定型鋼技術,提高了壩體混凝土成型質量和進度;在二期混凝土施區域,為免除人鑿毛勞動強度,採用永久性免拆金屬網作為一期混凝土;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期持續高強度混凝土施系統的研究,使三峽成為名符其實的「世界一流」成為可能;三峽二期混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  11. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋模板工程、混凝土、預應力、移存梁、孔道壓漿、梁體封端、橋面防水層和保護層等施環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
  12. Firstly this text studied the super thick planceer of mass concrete of high - rise building with ten characteristics comparing with the common reinforced concrete, according to the above characteristic from three aspect including the reinforcing bar project, the concretes project and the form project, elaborate the construction characteristics of super thick mass concrete planceer of high - rise building, have a detailed explanation of the big reinforcing bar link technique and the pump technique of the prepared concrete

    首先本文研究了高層建築超厚底大體積混凝土的與普通鋼筋混凝土相比具有的十個特性,根據上述特性從鋼筋模板工程、混凝土三個方面闡述了高層建築超厚底大體積混凝土的施特點,重點就鋼筋連接技術、預拌混凝土泵送技術進行詳細論述。
  13. Specification for design and construction of hydraulic and removable formwork project

    液壓滑升模板工程設計與施
  14. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據高層建築超厚底大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力理論計算的簡化方法和最大整澆長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構施經驗,提出了防止大體積混凝土溫度裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚底為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配合比的確定,鋼筋模板工程、混凝土的泵送和澆築以及大體積混凝土內部溫度的監測和後期養護等方面進行了理論應用。
  15. Technical code of slipform engineering

    滑動模板工程技術規范
  16. Thirdly, thesis researches the principle of workflow / process management. based on windchill system, thesis analyzes the approach of workflow / process management in windchill. as a case, designing a approving workflow for ship drawing, which includes life cycles, workflow template, and projects

    其次,介紹了作流管理的基本理論,結合windchill ,分析了windchill中作流管理的實現方式和實現途經,以船體結構圖紙設計為例,設計了其生命周期作流、以及項目,並在windchill中實現這一圖紙審批流
  17. Construction tower scaffold and shelf hoisting and moulding works

    四、施塔架吊裝及模板工程
  18. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施階段的風致振動往往影響到施的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  19. The engineering constants around the stitch hole in the composite laminate are analyzed using the fdm. it is found that the elastic constants have distinct region character and the traces of the resin - rich pocket in different lamina are clear

    採用纖維彎曲型分析了縫紉復合材料單層在縫紉孔附近的最大纖維偏轉角、縫紉影響區以及縫紉復合材料單層及層合常數的變化,發現常數具有很明顯的區域性,能夠看出各層中樹脂富集區的痕跡。
  20. Bing top down construction is carried out, the underground structure construction, including soil engineering, concrete casting and formwork, becomes more complicated and more strict. the paper gives a detailed research on the problems, and brings forward corresponding solutions. the monitor of the deep pit is also the important problem to the top down construction

    地下室主體結構也因採用逆作法施,使土方、砼逆作澆築、模板工程等變得更為復雜,要求也更加嚴格,本文對地下室主體結構施中的有關問題進行了較為詳細的研究,提出了相應的解決措施。
分享友人