模用鋼 的英文怎麼說

中文拼音 [yònggāng]
模用鋼 英文
die steel
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 鋼名詞(鐵和碳的合金) steel
  1. Carried on the optimized design using the optimized design module to the support, finally changed to 14 equal - angle iron to replace the used steel

    優化設計塊對支架進行了優化設計,結果改14號等邊角代替原主弦桿
  2. Assab special steel

    冷擠壓沖特殊
  3. Most damage of construction is due to the crack, so people always consider the beginning of crack as the sign of danger, it always makes people fear. with the development of economy in our country, the dimensions of construction is larger and larger, and the engineering is growing towards large - scale and complexity, because the refresh of material of concrete, the strength of concrete is improved, but a lot of crack appears in the engineering. in recent years, as the further development of economy in our country, the need of steel in the engineering is increscent, but the supply of steel in our country can not satisfy with the need, the price of steel is continuously rising, so it gives us a problem, we must save steel in designing construction and simultanentily controlling the crack of construction. so it gives us a new question on crack study

    由於建築物的破壞往往始於裂縫,所以人們一般把裂縫的出現視作危險的徵兆,裂縫使人們產生恐懼感。隨著國家經濟的發展,工程建設規越來越大,工程結構朝著大型化、復雜化的方向進展,隨著混凝土原材料的不斷更新,混凝土強度等級的不斷提高,在實際工程上出現了大量的裂縫問題。近年來隨著國家經濟的進一步發展,於工程建設的量日趨增大,而國家的材供應量不能滿足日趨增大的市場需求量,導致材的價格不斷上漲,這就要求我們在節約量的基礎上來設計控制工程中的裂縫問題,這也就給裂縫研究提出新的課題。
  4. Adopting the construction scheme which combines iron - frame moulded board with unsegragating concrete underwater and encircling steel hoop on glass fiber reinforced plastic mortar pipes, the difficulty in construction of outfall in riprap mound within a short period period is overcome

    摘要通過採板結合水下不離析混凝土以及對玻璃夾砂排水管採抱箍的施工方案,成功解決了在較短工期內完成拋石棱體中出水口施工難度大的問題。
  5. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;板工程大量採定型板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採永久性免拆金屬板網作為一期混凝土板;筋連接改進傳統的電焊連接方式,採大量採筋接頭機械連接技術,有效提高了接頭強度和筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應,提高了建築物的整體性和耐久性。
  6. Hard alloy die is made y taking high - quality hard alloy as its nips and fastening with steel die case. it is characterized by high hardness, good thermal conductivity, brasive coefficient and strong resistant to corrosion. it is suitable for drawn metal wire, bar and pipes. the types of dies includes rectangle, hecagon, octagon, diamond, trapezoid, basin and knob, u - shaped and half round types

    硬質合金具採優質合金作芯,並套緊固,具有硬度高,導熱性能好,磨擦系數小,抗腐蝕性等特點,適於拉制金屬線材,棒材,管材等,另外,具的類型有矩型、六角型、八角型、菱型、梯型、凹型凸型、馬蹄型、半圓型等各種異形
  7. Hot work die steel

    熱鍛模用鋼
  8. According to the test result, the mechanism of inorganically post - installed bars with cone - shaped heads was analyzed. and then the anchor intensity formula was formulated. the inorganically post - installed bars with cone - shaped head was carried on the finite element analysis on the spatial axial symmetry model

    根據試驗結果,對帶錐頭無機植筋的受力機理進行了理論分析,推導出帶錐頭無機植筋的錨固強度公式,並利空間軸對稱型對帶錐頭無機植筋進行了有限元分析,提出了利桿單元筋與混凝土之間的粘結滑移關系的方法。
  9. The bridge punching mould made of high - grade steel with fine plating and vacuum heat processing that makes the mould durable

    橋位沖高韌性耐磨經真空熱處理而成,使壽命長。
  10. Study on the application of cryogenic treatment for die steel

    深冷處理的應研究
  11. Open die steel forgings for general engineering purposes - part 4 : stainless steels

    一般工程開式件.第4部分:不銹
  12. Open die steel forgings for general engineering purposes - part 1 : general requirements

    一般工程開式件.第1部分:一般要求
  13. By means of the numerical simulation and considering many factors synthetically such as steel weight of the platform structure, the construction program, investment costs and geotechnical risk, the contrastive analysis has been made to the types of the platform structures with skirt piles and main pile, and finally it is determined in use skirt piles for weizhou 11 - 1 platform

    通過數值擬計算,綜合考慮平臺結構量、施工方案、投資費和工程地質風險等多種因素,對平臺採裙樁結構型式和主樁結構型式兩種方案進行了對比分析,最終確定潿洲11 - 1平臺採裙樁結構型式。
  14. Our major products include vacuum oil quenching furnace, vacuum high pressure gas quenching furnace, vacuum carburizing furnace, vacuum annealing furnace etc. this equipment can be widely employed in bright hardening of die steel, bearing steel, and spring steel

    本公司主要產品有:真空油淬爐真空高壓氣淬爐真空滲碳爐真空退火爐等。該設備可廣泛應於工軸承彈簧等光亮淬火。
  15. Taking the heating requirement on high speed rail to be produced in pangang into the consideration, this paper discusses the application of field bus fuzzy control system in heating furnace combustion control in pangang ’ s rail & beam plant

    本文結合攀生產高速鐵路軌的加熱要求,研究現場總線糊控制系統在攀軌梁加熱爐燃燒控制系統中的應
  16. Clod work die steel

    冷鍛模用鋼
  17. The 3d model of mold is analyzed in 3d fem by using ugh. base on the analyses result, some danger structure of the model have been found and some suggestions of the mold modification are given. since doing a lot of research about the 3d cadvcae technology, a 3dcad system of selecting mold for aluminum material have been developed and the method of analyzing the 3d model is provided in this paper

    然後,為了能真實地擬實際生產過程,進行鋁與在一定表面粗糙度、不同溫度條件、不同潤滑接觸狀態下的最大靜摩擦系數實驗,總結摩擦系數隨溫度變化的規律性和取值范圍;最後,應ug 17 . 0三維有限元cae塊進行具三維力場分析,根據三維有限元的結果分析,對具危險部分進行預變形的處理和優化,改善具受力變形的狀況。
  18. Dongguan chorbr tool measuring co., ltd is operating states department of various brands of machine tools, measuring tool and die parts, machine tool accessories, industrial oil, abrasive abrasive, magnetic tool and die steel, and hand tools, electric tools, pneumatic tools and machining center tools and other products company

    東莞市莞城東輝工量具經營部是經營各國多種品牌的切削工具、測量工具、具配件、機床附件、工業油、磨具磨料、磁性工具、材、手動工具、電動工具、氣動工具、加工中心工具等產品的公司。
  19. According to the geometrical characteristics of the surface on the deformed bars, considering the interfacial properties of the corrosion reinforcement and concrete, such as the microscopic mechanics model of corroded reinforcement ribs, the deterioration of ribs on the bearing surface of the deformed bars after corrosion and the effect of corrosion products of corrosion reinforced bar on the bond strength, and analyzing the distribution and interaction of the forces on the surface of the corrosion reinforcement and concrete, the calculation expressions of the bond strength between corroded deformed bars and concrete with and without transverse steel are established

    從變形筋的表面幾何特徵出發,考慮了筋銹蝕后筋與混凝土接觸面的特徵,例如筋橫肋在銹蝕狀態下的細觀力學型,筋銹蝕后筋橫肋高度的變化和銹蝕產物的生成對粘結力的影響。通過分析接觸面上各種力的分佈形式及相互關系,建立了有橫向筋和無橫向筋約束作下,筋與混凝土之間粘結力的計算表達式,且與相關文獻的結果進行了比較。
  20. Forging die steel

    鍛造模用鋼
分享友人